What grows in Todee
Montserrado, Liberia
The 2025/26 season in Todee
| When the rains are expected | February 2025 to January 2026 |
|---|---|
| Rain in a typical year | About 3,071 mm |
| This season's rain | Leaning dry — September and October look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +0.9 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for a long crop, or two in a year, warm all year, so nothing but rain ends the season |
| Ground this covers | 2 kinds of ground. The season below is the largest that farms — about 94% of this area. |
| 94% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 357 growing days · about 3,390 mm · February to January |
|---|---|
| 6% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 352 growing days · about 3,190 mm · February to January |
last updated 17 September 2026
What grows in Todee
94% lowland, humid, warm — 58 crops
-
GuavaFavourablePlant 21 Jan 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 25.0 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MangoFavourablePlant 21 Jan 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 18.0 t/ha expected
· about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CashewFavourablePlant 10 Feb 2026 – 17 Nov 2026 open now
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
CarrotFavourablePlant 2 Mar 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
WatermelonFavourablePlant 10 Feb 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
OkraFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SorghumFavourablePlant 10 Feb 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 3.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
GroundnutFavourablePlant 10 Feb 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SoybeanFavourablePlant 10 Feb 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TobaccoFavourablePlant 10 Feb 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 10 Feb 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Common beanFavourablePlant 2 Mar 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 10 Feb 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 10 Feb 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
CowpeaFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
FonioFavourablePlant 10 Feb 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Egusi melonFavourablePlant 10 Feb 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SesameFavourablePlant 21 Jan 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 1.1 t/ha expected
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SugarcaneFavourablePlant 29 Aug 2026 – 10 Feb 2027 open now
matched to this season's forecast
about 83.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 111.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PineappleFavourablePlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 50.9 t/ha expected
· about 64.8 t/ha
Pest/disease risk — manageable -
MandarinFavourablePlant 21 Jan 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 18.5 t/ha expected
· about 32.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
LimeFavourablePlant 21 Jan 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 16.7 t/ha expected
· about 23.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Oil palmFavourablePlant 2 Mar 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 13.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 19.3 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 2 Mar 2026 – 10 Feb 2027 open now
matched to this season's forecast
about 21.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TomatoFavourablePlant 2 Mar 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 35.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 61.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
African eggplantFavourablePlant 2 Mar 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
PumpkinFavourablePlant 10 Feb 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
AmaranthFavourablePlant 2 Mar 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 17.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 26.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 15.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 7 Dec 2026 · about 21.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Jute mallowFavourablePlant 2 Mar 2026 – 17 Nov 2026 open now
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 13.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Spider plantFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 7 Dec 2026 · about 13.2 t/ha
Soil pH outside the crop's rangeCorrect soil pH (lime)Correctable with liming -
MaizeFavourablePlant 10 Feb 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 5.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 8.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
RiceFavourablePlant 22 Mar 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 4.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
MoringaFavourablePlant 2 Mar 2027 – 9 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CassavaFavourablePlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 29.7 t/ha expected
· about 34.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Finger milletFavourablePlant 10 Feb 2027 – 9 Aug 2027 opens in 19 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2027 – 9 Aug 2027
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SunflowerFavourablePlant 21 May 2027 – 20 Jul 2027 opens in 33 weeks
matched to this season's forecast
about 2.3 t/ha expected
· about 3.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
RoselleFavourablePlant 10 Feb 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
BananaFavourablePlant 10 Feb 2027 – 29 Aug 2027 opens in 19 weeks
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 55.6 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CocoaFavourablePlant 2 Mar 2027 – 9 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PapayaFavourablePlant 10 Feb 2027 – 29 Aug 2027 opens in 19 weeks
matched to this season's forecast
about 45.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Robusta coffeeFavourablePlant 21 Jan 2027 – 1 May 2027 opens in 16 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.8 t/ha
Pest/disease risk — manageable -
EggplantFavourablePlant 10 Feb 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 29.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 43.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CucumberFavourablePlant 1 May 2027 – 29 Aug 2027 opens in 30 weeks
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 35.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
OnionFavourable
Plant 21 May 2027 – 20 Jul 2027 opens in 33 weeks
matched to this season's forecast
about 24.6 t/ha expected
· about 35.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TaroFavourablePlant 8 Oct 2026 – 10 Feb 2027 opens in 1 week
matched to this season's forecast
about 17.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
TurmericFavourablePlant 27 Dec 2026 – 10 Jun 2027 opens in 12 weeks
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 26.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
Pigeon peaFavourablePlant 1 Jan 2027 – 9 Aug 2027 opens in 13 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
GingerFavourablePlant 10 Feb 2027 – 1 May 2027 opens in 19 weeks
matched to this season's forecast
about 21.9 t/ha expected
· about 26.3 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
YamFavourablePlant 21 Jan 2027 – 20 Jul 2027 opens in 16 weeks
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
ChilliFavourablePlant 10 Feb 2027 – 9 Aug 2027 opens in 19 weeks
matched to this season's forecast
about 13.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 21.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CottonFavourablePlant 21 Jan 2027 – 29 Aug 2027 opens in 16 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CoconutFavourablePlant 22 Mar 2026 – 2 Mar 2027 open now
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Sweet orangeFavourablePlant 27 Dec 2025 – 17 Nov 2026 open now
matched to this season's forecast
about 16.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 26.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
KaleFavourablePlant 11 Apr 2027 – 30 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 25.5 t/ha expected
· about 36.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Swiss chardFavourablePlant 10 Jun 2027 – 19 Jun 2027 opens in 36 weeks
based on the rains it usually gets
about 21.9 t/ha expected
· about 31.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
LettuceFavourablePlant 10 Jun 2027 – 20 Jul 2027 opens in 36 weeks
matched to this season's forecast
about 11.2 t/ha expected
· about 15.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime)
6% humid, warm — 58 crops
-
GuavaFavourablePlant 10 Feb 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 25.0 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MangoFavourablePlant 21 Jan 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 18.0 t/ha expected
· about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CashewFavourablePlant 10 Feb 2026 – 17 Nov 2026 open now
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
CarrotFavourablePlant 2 Mar 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
WatermelonFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
OkraFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SorghumFavourablePlant 10 Feb 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 3.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
GroundnutFavourablePlant 10 Feb 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SoybeanFavourablePlant 10 Feb 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TobaccoFavourablePlant 2 Mar 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 10 Feb 2026 – 17 Nov 2026 open now
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Common beanFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 2 Mar 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 10 Feb 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
CowpeaFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
FonioFavourablePlant 10 Feb 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Egusi melonFavourablePlant 10 Feb 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SesameFavourablePlant 10 Feb 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 1.1 t/ha expected
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
PineappleFavourablePlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 50.9 t/ha expected
· about 64.8 t/ha
Pest/disease risk — manageable -
MandarinFavourablePlant 21 Jan 2026 – 17 Nov 2026 open now
matched to this season's forecast
about 18.5 t/ha expected
· about 32.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
LimeFavourablePlant 21 Jan 2026 – 17 Nov 2026 open now
matched to this season's forecast
about 16.7 t/ha expected
· about 23.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Oil palmFavourablePlant 2 Mar 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 13.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 19.3 t/ha
Pest/disease risk — manageable -
TomatoFavourablePlant 2 Mar 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 35.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 61.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
African eggplantFavourablePlant 2 Mar 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
PumpkinFavourablePlant 2 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
AmaranthFavourablePlant 2 Mar 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 17.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 26.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 22 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 15.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 7 Dec 2026 · about 21.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Jute mallowFavourablePlant 2 Mar 2026 – 17 Nov 2026 open now
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 13.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Spider plantFavourablePlant 22 Mar 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 7 Dec 2026 · about 13.2 t/ha
Soil pH outside the crop's rangeCorrect soil pH (lime)Correctable with liming -
MaizeFavourablePlant 10 Feb 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 6.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 8.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
RiceFavourablePlant 22 Mar 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 4.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
GrapefruitFavourablePlant 22 Mar 2026 – 2 Mar 2027 open now
matched to this season's forecast
about 21.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SugarcaneFavourablePlant 18 Sep 2026 – 10 Feb 2027 open now
matched to this season's forecast
about 83.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 111.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MoringaFavourablePlant 2 Mar 2027 – 29 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CassavaFavourablePlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 29.7 t/ha expected
· about 34.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Finger milletFavourablePlant 22 Mar 2027 – 9 Aug 2027 opens in 25 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2027 – 9 Aug 2027
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
RoselleFavourablePlant 10 Feb 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
SunflowerFavourablePlant 21 May 2027 – 20 Jul 2027 opens in 33 weeks
matched to this season's forecast
about 2.3 t/ha expected
· about 3.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
BananaFavourablePlant 10 Feb 2027 – 29 Aug 2027 opens in 19 weeks
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 55.6 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CocoaFavourablePlant 2 Mar 2027 – 29 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PapayaFavourablePlant 10 Feb 2027 – 29 Aug 2027 opens in 19 weeks
matched to this season's forecast
about 45.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Robusta coffeeFavourablePlant 10 Feb 2027 – 1 May 2027 opens in 19 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.8 t/ha
Pest/disease risk — manageable -
EggplantFavourablePlant 2 Mar 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 30.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 43.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CucumberFavourablePlant 1 May 2027 – 29 Aug 2027 opens in 30 weeks
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 35.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
OnionFavourable
Plant 21 May 2027 – 20 Jul 2027 opens in 33 weeks
matched to this season's forecast
about 24.4 t/ha expected
· about 35.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TaroFavourablePlant 8 Oct 2026 – 10 Feb 2027 opens in 1 week
matched to this season's forecast
about 17.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
GingerFavourablePlant 1 Jan 2027 – 1 May 2027 opens in 13 weeks
matched to this season's forecast
about 21.9 t/ha expected
· about 26.3 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TurmericFavourablePlant 1 Jan 2027 – 10 Jun 2027 opens in 13 weeks
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 26.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
Pigeon peaFavourablePlant 21 Jan 2027 – 9 Aug 2027 opens in 16 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
YamFavourablePlant 21 Jan 2027 – 20 Jul 2027 opens in 16 weeks
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CottonFavourablePlant 21 Jan 2027 – 29 Aug 2027 opens in 16 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
ChilliFavourablePlant 10 Feb 2027 – 9 Aug 2027 opens in 19 weeks
matched to this season's forecast
about 13.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 21.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CoconutFavourablePlant 27 Dec 2025 – 28 Oct 2026 open now
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Sweet orangeFavourablePlant 27 Dec 2025 – 17 Nov 2026 open now
matched to this season's forecast
about 16.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 26.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
KaleFavourablePlant 11 Apr 2027 – 20 Jul 2027 opens in 27 weeks
matched to this season's forecast
about 25.6 t/ha expected
· about 36.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Swiss chardFavourablePlant 10 Jun 2027 – 19 Jun 2027 opens in 36 weeks
based on the rains it usually gets
about 22.4 t/ha expected
· about 31.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
LettuceFavourablePlant 10 Jun 2027 – 20 Jul 2027 opens in 36 weeks
matched to this season's forecast
about 11.2 t/ha expected
· about 15.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime)
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What Divisi would not plant in Todee
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Avocado Unsuitable — Temperature
- Beetroot Unsuitable — Temperature
- Cabbage Unsuitable — Temperature
- Chickpea Unsuitable — Temperature
- Arabica coffee Unsuitable — Temperature
- Enset Unsuitable — Temperature
- Garlic Unsuitable — Temperature
- Irish potato Unsuitable
- Lemon Unsuitable — Temperature
- Niger seed Unsuitable — Temperature
- Passion fruit Unsuitable — Temperature
- Sweet pepper Unsuitable — Temperature
- Sweet potato Unsuitable — Temperature
- Tea Unsuitable — Temperature
- Teff Unsuitable — Temperature
- Wheat Unsuitable — Temperature
Divisi scored 74 crops against this district's own ground; 16 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Todee, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Todee
- 31 August 2026 Yam — Crop became recommendable
- 31 August 2026 Sesame — Crop became recommendable
- 31 August 2026 Banana Plantain — Crop became recommendable
- 31 August 2026 Cocoyam Taro — Crop became recommendable
- 31 August 2026 Pumpkin Butternut — Crop became recommendable
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Frequently asked questions
What crops grow well in Todee?
African eggplant, African nightshade, Amaranth, Bambara groundnut, Carrot all rate well in Todee — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant African eggplant in Todee?
In Todee the window for African eggplant runs 2 Mar 2026 to 8 Oct 2026.
Is there a farming app that works in Todee?
Divisi does. It reads Todee's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?
No — these are readings taken across Todee, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.