What grows in Okahandja
Otjozondjupa, Namibia
The 2026/27 season in Okahandja
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | December 2026 to April 2027 |
| Rain in a typical year | About 394 mm |
| This season's rain | Leaning dry — January and February look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +1.9 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for one short crop, and only if timed to it, warm all year, so nothing but rain ends the season |
| Ground this covers | 3 kinds of ground. The season below is the largest that farms — about 50% of this area. |
| 50% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 88 growing days · about 370 mm · December to April |
|---|---|
| 26% | too dry for rain-fed cropping without irrigation; warm all year, so nothing but rain ends the season no rain-fed season · about 300 mm |
| 23% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 99 growing days · about 390 mm · December to April |
last updated 17 September 2026
What grows in Okahandja
50% lowland, semi-arid, warm — 38 crops
-
Niger seedFavourablePlant 12 Dec 2026 – 1 Jan 2027 opens in 10 weeks
based on the rains it usually gets
0.7–0.8 t/ha expected
Irrigated: plant 20 Jul 2026 – 18 Sep 2026
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
SunflowerFavourablePlant 25 Dec 2026 – 14 Jan 2027 opens in 12 weeks
matched to this season's forecast
1.7–2.0 t/ha expected
· about 3.5 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
LablabFavourablePlant 25 Dec 2026 – 4 Jan 2027 opens in 12 weeks
matched to this season's forecast
1.3–1.5 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in season -
Pearl milletFavourablePlant 25 Dec 2026 – 3 Jan 2027 opens in 12 weeks
matched to this season's forecast
1.6–1.9 t/ha expected
Irrigated: plant 18 Sep 2026 – 7 Dec 2026 · about 3.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Green gramFavourablePlant 25 Dec 2026 – 14 Jan 2027 opens in 12 weeks
matched to this season's forecast
0.9–1.1 t/ha expected
Irrigated: plant 18 Sep 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
PumpkinFavourablePlant 25 Dec 2026 – 14 Jan 2027 opens in 12 weeks
matched to this season's forecast
15.0–17.7 t/ha expected
Irrigated: plant 20 Jul 2026 – 10 Feb 2027 · about 32.4 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
WatermelonFavourablePlant 4 Jan 2027 – 24 Jan 2027 opens in 14 weeks
matched to this season's forecast
24.3–28.5 t/ha expected
Irrigated: plant 29 Aug 2026 – 10 Feb 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 24 Jan 2027 – 23 Feb 2027 opens in 16 weeks
matched to this season's forecast
7.2–8.6 t/ha expected
Irrigated: plant 29 Aug 2026 – 2 Mar 2027 · about 13.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CucumberFavourablePlant 24 Jan 2027 – 23 Feb 2027 opens in 16 weeks
matched to this season's forecast
15.6–18.1 t/ha expected
Irrigated: plant 20 Jul 2026 – 2 Mar 2027 · about 37.1 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Sweet potatoFavourablePlant 12 Dec 2026 – 1 Jan 2027 opens in 10 weeks
based on the rains it usually gets
13.3–16.0 t/ha expected
Irrigated: plant 9 Aug 2027 – 29 Aug 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
SorghumFavourablePlant 25 Dec 2026 – 14 Jan 2027 opens in 12 weeks
matched to this season's forecast
2.3–2.8 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 25 Dec 2026 – 3 Jan 2027 opens in 12 weeks
matched to this season's forecast
0.7–0.8 t/ha expected
Irrigated: plant 18 Sep 2026 – 27 Dec 2026
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Common beanFavourablePlant 7 Jan 2027 – 27 Jan 2027 opens in 14 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 20 Jul 2026 – 22 Mar 2027 · about 3.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
TobaccoFavourablePlant 28 Dec 2026 – 17 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 20 Jul 2026 – 21 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Finger milletFavourablePlant 28 Dec 2026 – 6 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 1.6 t/ha expected
Irrigated: plant 9 Aug 2026 – 7 Dec 2026 · about 3.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
SoybeanFavourablePlant 28 Dec 2026 – 7 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 1.6 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Bambara groundnutFavourablePlant 28 Dec 2026 – 7 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 29 Aug 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
CarrotFavourablePlant 28 Dec 2026 – 17 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 16.6 t/ha expected
Irrigated: plant 30 Jun 2026 – 2 Mar 2027 · about 50.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
African eggplantFavourablePlant 28 Dec 2026 – 7 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 11.5 t/ha expected
Irrigated: plant 29 Aug 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
FonioFavourablePlant 28 Dec 2026 – 7 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 0.7 t/ha expected
Irrigated: plant 29 Aug 2026 – 1 Jan 2027 · about 1.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
MaizeFavourablePlant 28 Dec 2026 – 17 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 3.1 t/ha expected
Irrigated: plant 20 Jul 2026 – 21 Jan 2027 · about 9.3 t/ha
Pest/disease risk — manageableNot enough water in season -
WheatFavourablePlant 28 Dec 2026 – 17 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 10 Feb 2027 – 2 Mar 2027 · about 6.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
TomatoFavourablePlant 28 Dec 2026 – 17 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 16.6 t/ha expected
Irrigated: plant 30 Jun 2026 – 21 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
AmaranthFavourablePlant 28 Dec 2026 – 17 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 8.1 t/ha expected
Irrigated: plant 9 Aug 2026 – 21 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Irish potatoFavourablePlant 1 Jan 2027 – 21 Jan 2027 opens in 13 weeks
based on the rains it usually gets
about 17.0 t/ha expected
Irrigated: plant 20 Jul 2026 – 18 Sep 2026 · about 41.7 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
CowpeaFavourablePlant 4 Jan 2027 – 24 Jan 2027 opens in 14 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 18 Sep 2026 – 21 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
African nightshadeFavourablePlant 4 Jan 2027 – 3 Feb 2027 opens in 14 weeks
matched to this season's forecast
about 9.2 t/ha expected
Irrigated: plant 9 Aug 2026 – 22 Mar 2027 · about 23.2 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
BeetrootFavourablePlant 23 Feb 2027 – 4 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 16.5 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 37.1 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
OkraFavourablePlant 17 Jan 2027 – 6 Feb 2027 opens in 15 weeks
matched to this season's forecast
about 5.3 t/ha expected
Irrigated: plant 29 Aug 2026 – 10 Feb 2027 · about 15.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Spider plantFavourablePlant 24 Jan 2027 – 13 Feb 2027 opens in 16 weeks
matched to this season's forecast
about 4.8 t/ha expected
Irrigated: plant 9 Aug 2026 – 22 Mar 2027 · about 13.9 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
EggplantFavourablePlant 28 Dec 2026 – 7 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 14.8 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027 · about 46.3 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
ChilliFavourablePlant 28 Dec 2026 – 7 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 6.1 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Sweet pepperFavourablePlant 17 Jan 2027 – 26 Jan 2027 opens in 15 weeks
matched to this season's forecast
about 10.7 t/ha expected
Irrigated: plant 27 Dec 2026 – 21 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
OnionModerate
Plant 28 Dec 2026 – 17 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 11.9 t/ha expected
· about 41.7 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
GroundnutModeratePlant 25 Dec 2026 – 4 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 0.7 t/ha expected
Irrigated: plant 18 Sep 2026 – 17 Nov 2026 · about 3.3 t/ha
Frost riskPest/disease risk — manageableNot enough water in season -
LettuceModeratePlant 13 Feb 2027 – 5 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 9.7 t/ha expected
Irrigated: plant 22 Mar 2027 – 9 Aug 2027 · about 32.4 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
KaleModeratePlant 25 Dec 2026 – 14 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 12.7 t/ha expected
Irrigated: plant 7 Dec 2025 – 8 Oct 2026 · about 46.3 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Swiss chardModeratePlant 17 Jan 2027 – 26 Jan 2027 opens in 15 weeks
matched to this season's forecast
about 13.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 46.3 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum
23% highland, semi-arid, warm — 38 crops
-
Niger seedFavourablePlant 20 Dec 2026 – 9 Jan 2027 opens in 11 weeks
based on the rains it usually gets
0.7–0.8 t/ha expected
Irrigated: plant 20 Jul 2026 – 18 Sep 2026
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
LablabFavourablePlant 24 Dec 2026 – 3 Jan 2027 opens in 12 weeks
matched to this season's forecast
1.3–1.5 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in season -
Green gramFavourablePlant 22 Dec 2026 – 11 Jan 2027 opens in 12 weeks
matched to this season's forecast
1.0–1.2 t/ha expected
Irrigated: plant 18 Sep 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 22 Dec 2026 – 31 Dec 2026 opens in 12 weeks
matched to this season's forecast
0.8–0.9 t/ha expected
Irrigated: plant 18 Sep 2026 – 27 Dec 2026
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
SunflowerFavourablePlant 22 Dec 2026 – 11 Jan 2027 opens in 12 weeks
matched to this season's forecast
1.9–2.1 t/ha expected
· about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 30 Dec 2026 – 19 Jan 2027 opens in 13 weeks
matched to this season's forecast
16.1–18.9 t/ha expected
Irrigated: plant 20 Jul 2026 – 10 Feb 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CowpeaFavourablePlant 1 Jan 2027 – 21 Jan 2027 opens in 13 weeks
matched to this season's forecast
1.1–1.4 t/ha expected
Irrigated: plant 18 Sep 2026 – 21 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
WatermelonFavourablePlant 9 Jan 2027 – 29 Jan 2027 opens in 14 weeks
matched to this season's forecast
26.1–30.3 t/ha expected
Irrigated: plant 29 Aug 2026 – 10 Feb 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Common beanFavourablePlant 11 Jan 2027 – 31 Jan 2027 opens in 15 weeks
matched to this season's forecast
1.7–2.0 t/ha expected
Irrigated: plant 20 Jul 2026 – 22 Mar 2027 · about 3.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Jute mallowFavourablePlant 21 Jan 2027 – 2 Mar 2027 opens in 16 weeks
matched to this season's forecast
7.8–9.0 t/ha expected
Irrigated: plant 29 Aug 2026 – 2 Mar 2027 · about 13.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CucumberFavourablePlant 21 Jan 2027 – 2 Mar 2027 opens in 16 weeks
matched to this season's forecast
about 17.2 t/ha expected
Irrigated: plant 20 Jul 2026 – 2 Mar 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Sweet potatoFavourablePlant 10 Dec 2026 – 30 Dec 2026 opens in 10 weeks
based on the rains it usually gets
about 14.1 t/ha expected
Irrigated: plant 9 Aug 2027 – 29 Aug 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Pearl milletFavourablePlant 17 Dec 2026 – 26 Dec 2026 opens in 11 weeks
matched to this season's forecast
1.3–1.6 t/ha expected
Irrigated: plant 18 Sep 2026 – 7 Dec 2026 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
SorghumFavourablePlant 17 Dec 2026 – 6 Jan 2027 opens in 11 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
TobaccoFavourablePlant 22 Dec 2026 – 11 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 20 Jul 2026 – 21 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Bambara groundnutFavourablePlant 22 Dec 2026 – 1 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 29 Aug 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Finger milletFavourablePlant 22 Dec 2026 – 31 Dec 2026 opens in 12 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 9 Aug 2026 – 7 Dec 2026 · about 3.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
SoybeanFavourablePlant 22 Dec 2026 – 1 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
MaizeFavourablePlant 22 Dec 2026 – 11 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 3.5 t/ha expected
Irrigated: plant 20 Jul 2026 – 21 Jan 2027 · about 9.3 t/ha
Pest/disease risk — manageableNot enough water in season -
African eggplantFavourablePlant 22 Dec 2026 – 1 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 12.3 t/ha expected
Irrigated: plant 29 Aug 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
FonioFavourablePlant 22 Dec 2026 – 1 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 0.7 t/ha expected
Irrigated: plant 29 Aug 2026 – 1 Jan 2027 · about 1.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
WheatFavourablePlant 22 Dec 2026 – 11 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 10 Feb 2027 – 2 Mar 2027 · about 6.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 22 Dec 2026 – 11 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 17.8 t/ha expected
Irrigated: plant 30 Jun 2026 – 21 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
AmaranthFavourablePlant 20 Dec 2026 – 19 Jan 2027 opens in 11 weeks
matched to this season's forecast
about 8.6 t/ha expected
Irrigated: plant 9 Aug 2026 – 21 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Irish potatoFavourablePlant 30 Dec 2026 – 19 Jan 2027 opens in 13 weeks
based on the rains it usually gets
about 18.7 t/ha expected
Irrigated: plant 20 Jul 2026 – 18 Sep 2026 · about 41.7 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
CarrotFavourablePlant 27 Dec 2026 – 16 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 17.6 t/ha expected
Irrigated: plant 30 Jun 2026 – 2 Mar 2027 · about 50.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
OnionFavourable
Plant 1 Jan 2027 – 21 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 13.3 t/ha expected
· about 41.7 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
African nightshadeFavourablePlant 1 Jan 2027 – 31 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 10.1 t/ha expected
Irrigated: plant 9 Aug 2026 – 22 Mar 2027 · about 23.2 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
OkraFavourablePlant 11 Jan 2027 – 10 Feb 2027 opens in 15 weeks
matched to this season's forecast
about 5.8 t/ha expected
Irrigated: plant 29 Aug 2026 – 10 Feb 2027 · about 15.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
BeetrootFavourablePlant 22 Feb 2027 – 3 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 16.4 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 37.1 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
Spider plantFavourablePlant 21 Jan 2027 – 20 Feb 2027 opens in 16 weeks
matched to this season's forecast
about 5.3 t/ha expected
Irrigated: plant 9 Aug 2026 – 22 Mar 2027 · about 13.9 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
LettuceFavourablePlant 18 Feb 2027 – 10 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 10.4 t/ha expected
Irrigated: plant 22 Mar 2027 – 9 Aug 2027 · about 32.4 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Sweet pepperFavourablePlant 22 Dec 2026 – 11 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 11.6 t/ha expected
Irrigated: plant 27 Dec 2026 – 21 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
EggplantFavourablePlant 22 Dec 2026 – 1 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 16.2 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027 · about 46.3 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
ChilliFavourablePlant 20 Dec 2026 – 30 Dec 2026 opens in 11 weeks
matched to this season's forecast
about 6.4 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Swiss chardFavourablePlant 20 Dec 2026 – 9 Jan 2027 opens in 11 weeks
matched to this season's forecast
about 14.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 46.3 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
GroundnutModeratePlant 24 Dec 2026 – 3 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 0.7 t/ha expected
Irrigated: plant 18 Sep 2026 – 17 Nov 2026 · about 3.3 t/ha
Frost riskPest/disease risk — manageableNot enough water in season -
KaleModeratePlant 24 Dec 2026 – 13 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 12.8 t/ha expected
Irrigated: plant 7 Dec 2025 – 8 Oct 2026 · about 46.3 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What grows in Okahandja with irrigation
These need water applied — rain alone will not carry them here. The dates are the windows their own water supply allows.
-
GuavaFavourable Needs irrigationPlant 22 Mar 2026 – 2 Mar 2027 open now
matched to this season's forecast
about 35.0 t/ha expected
-
Sweet orangeFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 37.1 t/ha expected
Soil pH outside the crop's rangeCorrect soil pH (acidifier)Correctable with liming -
SesameFavourable Needs irrigationPlant 29 Aug 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 1.3 t/ha expected
Early-maturing — escapes late drought -
GrapefruitFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 32.7 t/ha expected
Soil pH outside the crop's rangeCorrect soil pH (acidifier)Correctable with liming -
MandarinFavourable Needs irrigationPlant 22 Mar 2026 – 2 Mar 2027 open now
matched to this season's forecast
about 28.1 t/ha expected
Soil pH outside the crop's rangeCorrect soil pH (acidifier)Correctable with liming -
TeffFavourable Needs irrigationPlant 2 Mar 2027 – 22 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 3.5 t/ha expected
Soil pH below the crop's optimumEarly-maturing — escapes late drought -
RoselleFavourable Needs irrigationPlant 29 Aug 2026 – 17 Nov 2026 open now
matched to this season's forecast
about 1.5 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
ChickpeaFavourable Needs irrigationPlant 30 Jun 2027 – 9 Jul 2027 opens in 39 weeks
matched to this season's forecast
about 3.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CabbageFavourable Needs irrigationPlant 22 Mar 2027 – 20 Jul 2027 opens in 25 weeks
matched to this season's forecast
about 64.8 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
TurmericFavourable Needs irrigationPlant 9 Aug 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 27.8 t/ha expected
Soil pH below the crop's optimumLate-maturing — drought risk -
CottonFavourable Needs irrigationPlant 9 Aug 2026 – 28 Oct 2026 open now
matched to this season's forecast
about 3.7 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
YamFavourable Needs irrigationPlant 9 Aug 2026 – 18 Sep 2026 closed for this season
matched to this season's forecast
about 23.2 t/ha expected
Soil pH outside the crop's rangeCorrect soil pH (acidifier)Correctable with liming -
LemonFavourable Needs irrigationPlant 2 Mar 2027 – 30 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 35.4 t/ha expected
Soil pH outside the crop's rangeCorrect soil pH (acidifier)Correctable with liming -
GarlicFavourable Needs irrigationPlant 2 Mar 2027 – 10 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 16.7 t/ha expected
Late-maturing — drought risk -
MangoFavourable Needs irrigationPlant 2 Mar 2027 – 30 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 16.3 t/ha expected
Frost risk -
AvocadoFavourable Needs irrigationPlant 2 Mar 2027 – 30 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 13.1 t/ha expected
Frost riskSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
RiceFavourable Needs irrigationPlant 29 Aug 2026 – 7 Dec 2026 open now
matched to this season's forecast
about 4.0 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
GingerFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 15.7 t/ha expected
Frost riskSoil pH outside the crop's rangeCorrect soil pH (acidifier)
What Divisi would not plant in Okahandja
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Moringa Moderate
- Papaya Moderate — Frost & pests
- Rice Moderate — Water
- Passion fruit Moderate — Frost & pests
- Avocado Unsuitable — Water
- Banana Unsuitable — Water
- Cabbage Unsuitable — Temperature
- Cashew Unsuitable
- Cassava Unsuitable — Temperature
- Chickpea Unsuitable — Temperature
- Cocoa Unsuitable
- Coconut Unsuitable
- Taro Unsuitable
- Arabica coffee Unsuitable
- Robusta coffee Unsuitable
- Cotton Unsuitable — Temperature
- Enset Unsuitable — Water
- Garlic Unsuitable — Temperature
- Ginger Unsuitable — Water
- Grapefruit Unsuitable — Water
- Guava Unsuitable — Water
- Lemon Unsuitable — Water
- Lime Unsuitable — Water
- Mandarin Unsuitable — Water
- Mango Unsuitable — Water
- Oil palm Unsuitable
- Pigeon pea Unsuitable — Temperature
- Pineapple Unsuitable
- Roselle Unsuitable — Temperature
- Sesame Unsuitable — Temperature
- Sugarcane Unsuitable — Water
- Sweet orange Unsuitable — Water
- Tea Unsuitable — Water
- Teff Unsuitable — Temperature
- Turmeric Unsuitable
- Yam Unsuitable
Divisi scored 74 crops against this district's own ground; 36 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Okahandja, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Okahandja
- 31 August 2026 Jute Mallow — Crop stopped being recommendable
- 31 August 2026 Cashew — Crop stopped being recommendable
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Where to sell it nearby
Frequently asked questions
What crops grow well in Okahandja?
Niger seed, Egusi melon, Green gram, Lablab, Pearl millet all rate well in Okahandja — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant Niger seed in Okahandja?
In Okahandja the window for Niger seed runs 12 Dec 2026 to 1 Jan 2027.
Is there a farming app that works in Okahandja?
Divisi does. It reads Okahandja's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?