What grows in Antsiranana II
Diana, Madagascar
These figures also cover Ancuabe, Chiúre, Mecuburi, Meluco, Montepuez and Namuno, where the engine returns the same answer.
The 2026/27 season in Antsiranana II
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | November 2026 to May 2027 |
| Rain in a typical year | About 1,344 mm |
| This season's rain | Leaning dry — January, February, November and December look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +1.2 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for one full main crop, warm all year, so nothing but rain ends the season |
| Ground this covers | 4 kinds of ground. The season below is the largest that farms — about 55% of this area. |
| 55% | enough rain for one full main crop; warm all year, so nothing but rain ends the season 190 growing days · about 1,420 mm · November to May |
|---|---|
| 35% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 156 growing days · about 1,250 mm · November to April |
| 7% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 155 growing days · about 1,200 mm · November to April |
| 4% | enough rain for one full main crop; warm all year, so nothing but rain ends the season 191 growing days · about 1,520 mm · November to May |
last updated 17 September 2026
What grows in Antsiranana II
55% lowland, sub-humid, warm — 48 crops
-
GuavaFavourablePlant 3 Nov 2026 – 11 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MandarinFavourablePlant 3 Nov 2026 – 21 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
LimeFavourablePlant 3 Nov 2026 – 21 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 3 Nov 2026 – 11 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
CashewFavourablePlant 3 Nov 2026 – 23 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
PapayaFavourablePlant 3 Nov 2026 – 2 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 46.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageable -
WatermelonFavourablePlant 3 Nov 2026 – 3 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MaizeFavourablePlant 3 Nov 2026 – 12 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 7.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 3 Nov 2026 – 11 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 3 Nov 2026 – 2 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 10 Feb 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 3 Nov 2026 – 22 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 3 Nov 2026 – 22 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 3 Nov 2026 – 21 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 3 Nov 2026 – 22 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
FonioFavourablePlant 3 Nov 2026 – 22 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 3 Nov 2026 – 1 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 30 Jun 2026 – 11 Apr 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SesameFavourablePlant 3 Nov 2026 – 23 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 May 2026 – 2 Mar 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 13 Nov 2026 – 12 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 13 Nov 2026 – 22 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 40.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CarrotFavourablePlant 13 Nov 2026 – 1 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 13 Nov 2026 – 21 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 13 Nov 2026 – 11 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 13 Nov 2026 – 11 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 13 Nov 2026 – 13 Mar 2027 opens in 6 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 14 Nov 2026 – 15 Mar 2027 opens in 6 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 23 Nov 2026 – 22 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 23 Nov 2026 – 13 Mar 2027 opens in 8 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 23 Nov 2026 – 12 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 5.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 1 Jan 2027 – 31 Jan 2027 opens in 13 weeks
based on the rains it usually gets
about 21.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 2 Jan 2027 – 3 Mar 2027 opens in 13 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LablabFavourablePlant 2 Jan 2027 – 11 Feb 2027 opens in 13 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLimited rooting depth -
African nightshadeFavourablePlant 22 Jan 2027 – 3 Mar 2027 opens in 16 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 22 Jan 2027 – 3 Mar 2027 opens in 16 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Early-maturing — escapes late drought -
Finger milletFavourablePlant 12 Jan 2027 – 3 Mar 2027 opens in 15 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pigeon peaFavourablePlant 3 Nov 2026 – 3 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 3 Nov 2026 – 12 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 3 Nov 2026 – 23 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 3 Nov 2026 – 2 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 3 Nov 2026 – 13 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 14.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
YamFavourablePlant 3 Nov 2026 – 23 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 22.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
GrapefruitFavourablePlant 3 Nov 2026 – 23 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 15.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableNot enough water in season -
Sweet orangeFavourablePlant 3 Nov 2026 – 23 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 19.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageable -
SunflowerFavourablePlant 3 Nov 2026 – 3 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OnionFavourable
Plant 13 Nov 2026 – 1 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 20.8 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 45.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CassavaFavourablePlant 3 Nov 2026 – 23 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 16.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
KaleFavourablePlant 23 Nov 2026 – 12 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 17.9 t/ha expected
Irrigated: plant 2 Mar 2027 – 9 Aug 2027 · about 50.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
LettuceModeratePlant 21 Feb 2027 – 23 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 7.2 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 27.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TurmericModeratePlant 2 Nov 2026 – 22 Nov 2026 opens in 5 weeks
based on the rains it usually gets
about 9.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableDry season too long for this cropLate-maturing — drought risk
35% lowland, semi-arid, warm — 45 crops
-
MangoFavourablePlant 9 Nov 2026 – 18 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
MaizeFavourablePlant 8 Nov 2026 – 7 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 7.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 8 Nov 2026 – 27 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 8 Nov 2026 – 17 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 10 Feb 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 8 Nov 2026 – 17 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 8 Nov 2026 – 6 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 8 Nov 2026 – 16 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 8 Nov 2026 – 7 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
CashewFavourablePlant 9 Nov 2026 – 9 Mar 2027 opens in 6 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
FonioFavourablePlant 8 Nov 2026 – 27 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 8 Nov 2026 – 17 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 30 Jun 2026 – 11 Apr 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SesameFavourablePlant 8 Nov 2026 – 7 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 May 2026 – 2 Mar 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GuavaFavourablePlant 9 Nov 2026 – 18 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 22.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
WatermelonFavourablePlant 19 Nov 2026 – 17 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 31.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PapayaFavourablePlant 19 Nov 2026 – 29 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 47.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageable -
TomatoFavourablePlant 18 Nov 2026 – 17 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 40.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CarrotFavourablePlant 18 Nov 2026 – 27 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 18 Nov 2026 – 27 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 19 Nov 2026 – 29 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 19.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Jute mallowFavourablePlant 18 Nov 2026 – 8 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 18 Nov 2026 – 6 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 18 Nov 2026 – 16 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 18 Nov 2026 – 16 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 28 Nov 2026 – 27 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 28 Nov 2026 – 26 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 28 Nov 2026 – 17 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 5.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LablabFavourablePlant 28 Dec 2026 – 17 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
PumpkinFavourablePlant 7 Jan 2027 – 6 Feb 2027 opens in 14 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 18 Mar 2027 – 27 Mar 2027 opens in 24 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 17 Jan 2027 – 16 Feb 2027 opens in 15 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 17 Jan 2027 – 16 Feb 2027 opens in 15 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Early-maturing — escapes late drought -
Finger milletFavourablePlant 17 Jan 2027 – 27 Jan 2027 opens in 15 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
EggplantFavourablePlant 8 Nov 2026 – 18 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 8 Nov 2026 – 28 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Pigeon peaFavourablePlant 9 Nov 2026 – 29 Nov 2026 opens in 6 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 8 Nov 2026 – 18 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 8 Nov 2026 – 28 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 14.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
SunflowerFavourablePlant 8 Nov 2026 – 27 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OnionFavourable
Plant 28 Nov 2026 – 27 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 22.5 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 45.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CassavaFavourablePlant 8 Nov 2026 – 28 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 19.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
MandarinFavourablePlant 9 Nov 2026 – 18 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 9.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableDry season too long for this crop -
LimeFavourablePlant 9 Nov 2026 – 18 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 8.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableDry season too long for this crop -
KaleFavourablePlant 26 Nov 2026 – 16 Dec 2026 opens in 8 weeks
matched to this season's forecast
about 14.9 t/ha expected
Irrigated: plant 2 Mar 2027 – 9 Aug 2027 · about 50.0 t/ha
Pest/disease risk — manageableSteep slopeLate-maturing — drought risk -
LettuceModeratePlant 17 Feb 2027 – 9 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 7.4 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 27.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
YamModeratePlant 6 Nov 2026 – 26 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 8.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableDry season too long for this cropSteep slope
7% semi-arid, warm — 45 crops
-
MangoFavourablePlant 9 Nov 2026 – 18 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableNo terrain data for this spot -
MaizeFavourablePlant 9 Nov 2026 – 8 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 7.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageableNo terrain data for this spot -
SorghumFavourablePlant 9 Nov 2026 – 28 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
GroundnutFavourablePlant 9 Nov 2026 – 8 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 10 Feb 2027 · about 4.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
SoybeanFavourablePlant 9 Nov 2026 – 18 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
TobaccoFavourablePlant 9 Nov 2026 – 28 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 9 Nov 2026 – 17 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 9 Nov 2026 – 8 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableNo terrain data for this spot -
CashewFavourablePlant 9 Nov 2026 – 9 Mar 2027 opens in 6 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNo terrain data for this spot -
FonioFavourablePlant 9 Nov 2026 – 28 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 9 Nov 2026 – 18 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 30 Jun 2026 – 11 Apr 2027
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
SesameFavourablePlant 9 Nov 2026 – 8 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 May 2026 – 2 Mar 2027
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
GuavaFavourablePlant 9 Nov 2026 – 18 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 22.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNo terrain data for this spot -
PapayaFavourablePlant 19 Nov 2026 – 29 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 50.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableNo terrain data for this spot -
TomatoFavourablePlant 19 Nov 2026 – 18 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 40.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
CarrotFavourablePlant 19 Nov 2026 – 28 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
WatermelonFavourablePlant 19 Nov 2026 – 17 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
African eggplantFavourablePlant 19 Nov 2026 – 28 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
MoringaFavourablePlant 19 Nov 2026 – 29 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNo terrain data for this spot -
Jute mallowFavourablePlant 19 Nov 2026 – 9 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
Common beanFavourablePlant 19 Nov 2026 – 7 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
CowpeaFavourablePlant 19 Nov 2026 – 17 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
Green gramFavourablePlant 19 Nov 2026 – 17 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
AmaranthFavourablePlant 29 Nov 2026 – 28 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
OkraFavourablePlant 29 Nov 2026 – 27 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
RiceFavourablePlant 29 Nov 2026 – 18 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 5.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
PumpkinFavourablePlant 29 Dec 2026 – 7 Feb 2027 opens in 13 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
LablabFavourablePlant 29 Dec 2026 – 18 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableNo terrain data for this spot -
CucumberFavourablePlant 9 Mar 2027 – 19 Mar 2027 opens in 23 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 18 Jan 2027 – 17 Feb 2027 opens in 16 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
Spider plantFavourablePlant 18 Jan 2027 – 17 Feb 2027 opens in 16 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
No terrain data for this spotEarly-maturing — escapes late drought -
Finger milletFavourablePlant 18 Jan 2027 – 28 Jan 2027 opens in 16 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
EggplantFavourablePlant 9 Nov 2026 – 19 Dec 2026 opens in 6 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotLate-maturing — drought risk -
CottonFavourablePlant 9 Nov 2026 – 29 Nov 2026 opens in 6 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotLate-maturing — drought risk -
Pigeon peaFavourablePlant 9 Nov 2026 – 29 Nov 2026 opens in 6 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableNo terrain data for this spotLate-maturing — drought risk -
RoselleFavourablePlant 9 Nov 2026 – 19 Dec 2026 opens in 6 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableNo terrain data for this spotLate-maturing — drought risk -
ChilliFavourablePlant 9 Nov 2026 – 29 Nov 2026 opens in 6 weeks
matched to this season's forecast
about 14.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotLate-maturing — drought risk -
SunflowerFavourablePlant 9 Nov 2026 – 28 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
OnionFavourable
Plant 29 Nov 2026 – 18 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 22.5 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 45.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought -
CassavaFavourablePlant 9 Nov 2026 – 29 Nov 2026 opens in 6 weeks
matched to this season's forecast
about 18.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonNo terrain data for this spot -
KaleFavourablePlant 29 Nov 2026 – 19 Dec 2026 opens in 8 weeks
matched to this season's forecast
about 21.8 t/ha expected
Irrigated: plant 2 Mar 2027 – 9 Aug 2027 · about 50.0 t/ha
Pest/disease risk — manageableNo terrain data for this spotLate-maturing — drought risk -
MandarinFavourablePlant 9 Nov 2026 – 18 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 9.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableDry season too long for this cropNo terrain data for this spot -
LimeFavourablePlant 9 Nov 2026 – 18 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 8.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableDry season too long for this cropNo terrain data for this spot -
YamFavourablePlant 9 Nov 2026 – 29 Nov 2026 opens in 6 weeks
matched to this season's forecast
about 10.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableDry season too long for this cropNo terrain data for this spot -
LettuceModeratePlant 17 Feb 2027 – 9 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 7.9 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 27.5 t/ha
Pest/disease risk — manageableNo terrain data for this spotEarly-maturing — escapes late drought
4% sub-humid, warm — 53 crops
-
GuavaFavourablePlant 4 Nov 2026 – 22 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 23.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSteep slope -
MangoFavourablePlant 4 Nov 2026 – 22 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 16.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSteep slope -
CashewFavourablePlant 4 Nov 2026 – 24 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSteep slope -
LemonFavourablePlant 4 Nov 2026 – 22 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 21.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
LimeFavourablePlant 4 Nov 2026 – 22 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 15.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
MandarinFavourablePlant 4 Nov 2026 – 22 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
MoringaFavourablePlant 14 Nov 2026 – 3 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Pigeon peaFavourablePlant 4 Nov 2026 – 4 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSteep slopeLate-maturing — drought risk -
PapayaFavourablePlant 4 Nov 2026 – 3 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 38.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Sweet orangeFavourablePlant 4 Nov 2026 – 24 Nov 2026 opens in 5 weeks
matched to this season's forecast
17.7–18.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
WatermelonFavourablePlant 4 Nov 2026 – 4 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 23.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
SorghumFavourablePlant 4 Nov 2026 – 12 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 2.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
SoybeanFavourablePlant 4 Nov 2026 – 23 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 2.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
TobaccoFavourablePlant 4 Nov 2026 – 23 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 2.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
Finger milletFavourablePlant 4 Nov 2026 – 23 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 2.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Pearl milletFavourablePlant 4 Nov 2026 – 4 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 4 Nov 2026 – 23 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSteep slope -
LablabFavourablePlant 4 Nov 2026 – 12 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSteep slope -
FonioFavourablePlant 4 Nov 2026 – 23 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
Green gramFavourablePlant 4 Nov 2026 – 12 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Egusi melonFavourablePlant 4 Nov 2026 – 2 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 0.8 t/ha expected
Irrigated: plant 30 Jun 2026 – 11 Apr 2027
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
SesameFavourablePlant 4 Nov 2026 – 24 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 0.8 t/ha expected
Irrigated: plant 21 May 2026 – 2 Mar 2027
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
GroundnutFavourablePlant 4 Nov 2026 – 3 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 10 Feb 2027 · about 4.0 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
TomatoFavourablePlant 4 Nov 2026 – 23 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 25.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
African eggplantFavourablePlant 4 Nov 2026 – 2 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 15.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
PumpkinFavourablePlant 4 Nov 2026 – 22 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 15.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
MaizeFavourablePlant 4 Nov 2026 – 13 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 4.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageableSteep slope -
CarrotFavourablePlant 14 Nov 2026 – 12 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 23.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
OkraFavourablePlant 14 Nov 2026 – 22 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 6.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Common beanFavourablePlant 14 Nov 2026 – 22 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
CowpeaFavourablePlant 14 Nov 2026 – 12 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
AmaranthFavourablePlant 14 Nov 2026 – 23 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 12.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 14 Nov 2026 – 22 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 11.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Jute mallowFavourablePlant 15 Nov 2026 – 27 Mar 2027 opens in 6 weeks
matched to this season's forecast
about 6.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
CucumberFavourablePlant 24 Nov 2026 – 24 Mar 2027 opens in 8 weeks
matched to this season's forecast
about 15.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Spider plantFavourablePlant 24 Nov 2026 – 22 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 6.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
RiceFavourablePlant 24 Nov 2026 – 13 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 3.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
OnionFavourable
Plant 3 Jan 2027 – 2 Feb 2027 opens in 13 weeks
matched to this season's forecast
about 19.0 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 45.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SunflowerFavourablePlant 13 Jan 2027 – 4 Mar 2027 opens in 15 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 2 Mar 2027 – 29 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Sweet potatoFavourablePlant 22 Feb 2027 – 3 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 17.1 t/ha expected
Irrigated: plant 1 May 2027 – 10 Jun 2027 · about 35.0 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
Irish potatoFavourablePlant 4 Mar 2027 – 14 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 22.2 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 45.0 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
RoselleFavourablePlant 4 Nov 2026 – 3 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 0.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSteep slopeLate-maturing — drought risk -
EggplantFavourablePlant 4 Nov 2026 – 13 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 22.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
CottonFavourablePlant 4 Nov 2026 – 24 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 1.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
ChilliFavourablePlant 4 Nov 2026 – 24 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Swiss chardFavourablePlant 3 Jan 2027 – 23 Jan 2027 opens in 13 weeks
matched to this season's forecast
about 22.2 t/ha expected
Irrigated: plant 2 Mar 2027 – 30 Jun 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
GrapefruitFavourablePlant 4 Nov 2026 – 24 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 14.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
YamFavourablePlant 4 Nov 2026 – 24 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 14.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSteep slopeLate-maturing — drought risk -
CassavaFavourablePlant 4 Nov 2026 – 24 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 15.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
KaleFavourablePlant 24 Nov 2026 – 13 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 20.3 t/ha expected
Irrigated: plant 2 Mar 2027 – 9 Aug 2027 · about 50.0 t/ha
Pest/disease risk — manageableSteep slopeLate-maturing — drought risk -
LettuceModeratePlant 12 Feb 2027 – 14 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 8.5 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 27.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Niger seedModeratePlant 22 Feb 2027 – 3 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 0.3 t/ha expected
Irrigated: plant 11 Apr 2027 – 20 Jul 2027 · about 1.0 t/ha
Pest/disease risk — manageableSteep slopeEarly-maturing — escapes late drought -
TurmericModeratePlant 2 Nov 2026 – 22 Nov 2026 opens in 5 weeks
based on the rains it usually gets
about 6.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableDry season too long for this cropSteep slope
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What grows in Antsiranana II with irrigation
These need water applied — rain alone will not carry them here. The dates are the windows their own water supply allows.
-
PineappleFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 70.0 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimum -
BananaFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 60.0 t/ha expected
Pest/disease risk — manageable -
Oil palmFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 20.8 t/ha expected
Pest/disease risk — manageable -
Robusta coffeeFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 3.0 t/ha expected
Pest/disease risk — manageable -
Arabica coffeeFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 2.5 t/ha expected
Pest/disease risk — manageable -
CocoaFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 2.0 t/ha expected
Pest/disease risk — manageable -
SugarcaneFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 107.2 t/ha expected
Pest/disease risk — manageable -
CoconutFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 3.0 t/ha expected
Pest/disease risk — manageable -
BeetrootFavourable Needs irrigationPlant 21 May 2027 – 20 Jul 2027 opens in 33 weeks
matched to this season's forecast
about 40.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TaroFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 30.0 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
GingerFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 30.0 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
Sweet pepperFavourable Needs irrigationPlant 22 Mar 2027 – 30 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 40.0 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk
What Divisi would not plant in Antsiranana II
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Pineapple Only in patches — clears in part of this area, not across any one zone
- Coconut Only in patches — clears in part of this area, not across any one zone
- Banana Only in patches — clears in part of this area, not across any one zone
- Sugarcane Only in patches — clears in part of this area, not across any one zone
- Cocoa Only in patches — clears in part of this area, not across any one zone
- Taro Only in patches — clears in part of this area, not across any one zone
- Ginger Only in patches — clears in part of this area, not across any one zone
- Robusta coffee Moderate — Water
- Oil palm Moderate — Water
- Avocado Unsuitable — Temperature
- Beetroot Unsuitable — Temperature
- Cabbage Unsuitable — Temperature
- Chickpea Unsuitable — Temperature
- Arabica coffee Unsuitable
- Enset Unsuitable
- Garlic Unsuitable — Temperature
- Passion fruit Unsuitable — Temperature
- Sweet pepper Unsuitable — Temperature
- Tea Unsuitable — Temperature
- Teff Unsuitable — Temperature
- Wheat Unsuitable — Temperature
Divisi scored 74 crops against this district's own ground; 21 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Antsiranana II, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Antsiranana II
- 2 September 2026 Tobacco — Limiting factor changed
- 2 September 2026 Tobacco — Suitability class changed, now rates Favourable
- 2 September 2026 Tea — Limiting factor changed
- 2 September 2026 Tea — Suitability class changed, now rates Favourable
- 2 September 2026 Teff — Limiting factor changed
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Frequently asked questions
What crops grow well in Antsiranana II?
Bambara groundnut, Cashew, Egusi melon, Fonio, Groundnut all rate well in Antsiranana II — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant Bambara groundnut in Antsiranana II?
In Antsiranana II the window for Bambara groundnut runs 3 Nov 2026 to 22 Jan 2027.
Is there a farming app that works in Antsiranana II?
Divisi does. It reads Antsiranana II's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?
No — these are readings taken across Antsiranana II, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.