What grows in Nacala Porto
Nampula, Moçambique
The 2026/27 season in Nacala Porto
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | November 2026 to April 2027 |
| Rain in a typical year | About 760 mm |
| This season's rain | Leaning dry — January, February and December look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +1.1 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for one short crop, and only if timed to it, warm all year, so nothing but rain ends the season |
| Ground this covers | 3 kinds of ground. The season below is the largest that farms — about 85% of this area. |
| 85% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 150 growing days · about 810 mm · November to April |
|---|---|
| 10% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 148 growing days · about 780 mm · November to April |
| 5% | enough rain for one full main crop; warm all year, so nothing but rain ends the season 183 growing days · about 850 mm · November to May |
last updated 17 September 2026
What grows in Nacala Porto
85% lowland, semi-arid, warm — 43 crops
-
MangoFavourablePlant 16 Nov 2026 – 15 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
SesameFavourablePlant 16 Nov 2026 – 5 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 26 Nov 2026 – 4 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MaizeFavourablePlant 26 Nov 2026 – 5 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 7.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 26 Nov 2026 – 15 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 26 Nov 2026 – 5 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 26 Nov 2026 – 15 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 26 Nov 2026 – 14 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CashewFavourablePlant 26 Nov 2026 – 24 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
FonioFavourablePlant 26 Nov 2026 – 25 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 26 Nov 2026 – 15 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PapayaFavourablePlant 26 Nov 2026 – 26 Dec 2026 opens in 8 weeks
matched to this season's forecast
about 49.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageable -
TobaccoFavourablePlant 26 Nov 2026 – 25 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 26 Nov 2026 – 5 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
African eggplantFavourablePlant 6 Dec 2026 – 25 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 6 Dec 2026 – 6 Mar 2027 opens in 9 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 6 Dec 2026 – 4 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 6 Dec 2026 – 14 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 6 Dec 2026 – 14 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TomatoFavourablePlant 5 Dec 2026 – 24 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 37.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CarrotFavourablePlant 5 Dec 2026 – 3 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 16 Dec 2026 – 25 Jan 2027 opens in 11 weeks
matched to this season's forecast
about 17.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 16 Dec 2026 – 24 Feb 2027 opens in 11 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 16 Dec 2026 – 15 Jan 2027 opens in 11 weeks
matched to this season's forecast
about 4.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LablabFavourablePlant 26 Dec 2026 – 5 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 18 Sep 2026
Pest/disease risk — manageable -
PumpkinFavourablePlant 5 Jan 2027 – 25 Jan 2027 opens in 14 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 18 Sep 2026 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 25 Jan 2027 – 14 Feb 2027 opens in 17 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 10 Feb 2026 – 8 Oct 2026 · about 25.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 25 Jan 2027 – 14 Feb 2027 opens in 17 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 10 Feb 2026 – 8 Oct 2026 · about 15.0 t/ha
Early-maturing — escapes late drought -
CucumberFavourablePlant 6 Mar 2027 – 16 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 21.4 t/ha expected
Irrigated: plant 22 Mar 2026 – 18 Sep 2026 · about 40.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 15 Jan 2027 – 25 Jan 2027 opens in 15 weeks
matched to this season's forecast
about 2.6 t/ha expected
Irrigated: plant 10 Feb 2027 – 9 Aug 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CottonFavourablePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 13.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Pigeon peaFavourablePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 26 Nov 2026 – 16 Dec 2026 opens in 8 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 26 Nov 2026 – 16 Dec 2026 opens in 8 weeks
matched to this season's forecast
about 34.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
GuavaFavourablePlant 16 Nov 2026 – 15 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 16.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
SunflowerFavourablePlant 26 Nov 2026 – 25 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 11 Apr 2027 – 9 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 6 Dec 2026 – 15 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 16.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
OnionFavourable
Plant 5 Dec 2026 – 24 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 20.8 t/ha expected
Irrigated: plant 11 Apr 2027 – 20 Jul 2027 · about 45.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CassavaFavourablePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 16.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
KaleFavourablePlant 26 Nov 2026 – 16 Dec 2026 opens in 8 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 11 Apr 2027 – 30 Jun 2027 · about 47.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
LettuceModeratePlant 14 Feb 2027 – 16 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 7.2 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 20.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
YamModeratePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 6.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableDry season too long for this cropLate-maturing — drought risk
10% semi-arid, warm — 43 crops
-
MangoFavourablePlant 16 Nov 2026 – 15 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
SesameFavourablePlant 16 Nov 2026 – 15 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CashewFavourablePlant 26 Nov 2026 – 6 Mar 2027 opens in 8 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
WatermelonFavourablePlant 26 Nov 2026 – 14 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SorghumFavourablePlant 26 Nov 2026 – 25 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 3.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 26 Nov 2026 – 15 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 26 Nov 2026 – 15 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 26 Nov 2026 – 4 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 26 Nov 2026 – 14 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 26 Nov 2026 – 5 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
FonioFavourablePlant 26 Nov 2026 – 25 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 26 Nov 2026 – 15 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PapayaFavourablePlant 26 Nov 2026 – 5 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 45.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageable -
MaizeFavourablePlant 26 Nov 2026 – 5 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 6.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageable -
CarrotFavourablePlant 6 Dec 2026 – 25 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 6 Dec 2026 – 14 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 6 Dec 2026 – 14 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 6 Dec 2026 – 24 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TomatoFavourablePlant 6 Dec 2026 – 15 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 35.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 6 Dec 2026 – 4 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 6 Dec 2026 – 16 Mar 2027 opens in 9 weeks
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 6 Dec 2026 – 15 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 16.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
OkraFavourablePlant 16 Dec 2026 – 24 Feb 2027 opens in 11 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 16 Dec 2026 – 4 Feb 2027 opens in 11 weeks
matched to this season's forecast
about 17.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LablabFavourablePlant 26 Dec 2026 – 15 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 18 Sep 2026
Pest/disease risk — manageable -
PumpkinFavourablePlant 5 Jan 2027 – 4 Feb 2027 opens in 14 weeks
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 18 Sep 2026 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 15 Jan 2027 – 25 Jan 2027 opens in 15 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 10 Feb 2027 – 9 Aug 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 24 Feb 2027 – 16 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 21.9 t/ha expected
Irrigated: plant 22 Mar 2026 – 18 Sep 2026 · about 40.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 25 Jan 2027 – 14 Feb 2027 opens in 17 weeks
matched to this season's forecast
about 15.8 t/ha expected
Irrigated: plant 10 Feb 2026 – 8 Oct 2026 · about 25.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 25 Jan 2027 – 24 Feb 2027 opens in 17 weeks
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 10 Feb 2026 – 8 Oct 2026 · about 15.0 t/ha
Early-maturing — escapes late drought -
RoselleFavourablePlant 16 Nov 2026 – 16 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
Pigeon peaFavourablePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 12.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 26 Nov 2026 – 16 Dec 2026 opens in 8 weeks
matched to this season's forecast
about 30.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
GuavaFavourablePlant 16 Nov 2026 – 15 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 17.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
SunflowerFavourablePlant 26 Nov 2026 – 25 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 11 Apr 2027 – 9 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OnionFavourable
Plant 6 Dec 2026 – 25 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 19.7 t/ha expected
Irrigated: plant 11 Apr 2027 – 20 Jul 2027 · about 45.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 16 Dec 2026 – 15 Jan 2027 opens in 11 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CassavaFavourablePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 19.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
KaleFavourablePlant 26 Nov 2026 – 16 Dec 2026 opens in 8 weeks
matched to this season's forecast
about 18.7 t/ha expected
Irrigated: plant 11 Apr 2027 – 30 Jun 2027 · about 47.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
LettuceModeratePlant 24 Feb 2027 – 16 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 6.7 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 20.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
YamModeratePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 6.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableDry season too long for this cropLate-maturing — drought risk
5% lowland, sub-humid, warm — 43 crops
-
MangoFavourablePlant 15 Nov 2026 – 13 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
SesameFavourablePlant 15 Nov 2026 – 4 Jan 2027 opens in 6 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 25 Nov 2026 – 23 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SorghumFavourablePlant 25 Nov 2026 – 13 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 25 Nov 2026 – 14 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 25 Nov 2026 – 24 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 25 Nov 2026 – 3 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 25 Nov 2026 – 23 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 25 Nov 2026 – 3 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
CashewFavourablePlant 25 Nov 2026 – 15 Mar 2027 opens in 8 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
FonioFavourablePlant 25 Nov 2026 – 24 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 25 Nov 2026 – 13 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MaizeFavourablePlant 25 Nov 2026 – 14 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 6.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageable -
PapayaFavourablePlant 25 Nov 2026 – 4 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 45.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageable -
Common beanFavourablePlant 5 Dec 2026 – 13 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 5 Dec 2026 – 13 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 5 Dec 2026 – 13 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TomatoFavourablePlant 5 Dec 2026 – 24 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 37.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 5 Dec 2026 – 3 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 5 Dec 2026 – 5 Mar 2027 opens in 9 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 5 Dec 2026 – 14 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 16.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CarrotFavourablePlant 15 Dec 2026 – 3 Feb 2027 opens in 11 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 15 Dec 2026 – 23 Feb 2027 opens in 11 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 15 Dec 2026 – 3 Feb 2027 opens in 11 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 15 Dec 2026 – 14 Jan 2027 opens in 11 weeks
matched to this season's forecast
about 4.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LablabFavourablePlant 4 Jan 2027 – 13 Feb 2027 opens in 14 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 18 Sep 2026
Pest/disease risk — manageable -
PumpkinFavourablePlant 4 Jan 2027 – 13 Feb 2027 opens in 14 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 18 Sep 2026 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 14 Jan 2027 – 3 Feb 2027 opens in 15 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 10 Feb 2027 – 9 Aug 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 23 Feb 2027 – 15 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 22 Mar 2026 – 18 Sep 2026 · about 40.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 24 Jan 2027 – 23 Feb 2027 opens in 16 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 10 Feb 2026 – 8 Oct 2026 · about 25.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 24 Jan 2027 – 23 Feb 2027 opens in 16 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 10 Feb 2026 – 8 Oct 2026 · about 15.0 t/ha
Early-maturing — escapes late drought -
CottonFavourablePlant 15 Nov 2026 – 25 Dec 2026 opens in 6 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Pigeon peaFavourablePlant 15 Nov 2026 – 5 Dec 2026 opens in 6 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 15 Nov 2026 – 15 Dec 2026 opens in 6 weeks
matched to this season's forecast
about 13.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 25 Nov 2026 – 14 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 25 Nov 2026 – 14 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 32.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
GuavaFavourablePlant 15 Nov 2026 – 3 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
SunflowerFavourablePlant 25 Nov 2026 – 5 Mar 2027 opens in 8 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 11 Apr 2027 – 9 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OnionFavourable
Plant 15 Dec 2026 – 24 Jan 2027 opens in 11 weeks
matched to this season's forecast
about 20.8 t/ha expected
Irrigated: plant 11 Apr 2027 – 20 Jul 2027 · about 45.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CassavaFavourablePlant 15 Nov 2026 – 5 Dec 2026 opens in 6 weeks
matched to this season's forecast
about 17.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
KaleFavourablePlant 5 Dec 2026 – 24 Jan 2027 opens in 9 weeks
matched to this season's forecast
about 19.6 t/ha expected
Irrigated: plant 11 Apr 2027 – 30 Jun 2027 · about 47.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
LettuceModeratePlant 23 Feb 2027 – 15 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 7.3 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 20.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
YamModeratePlant 15 Nov 2026 – 5 Dec 2026 opens in 6 weeks
matched to this season's forecast
about 7.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableDry season too long for this cropLate-maturing — drought risk
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What grows in Nacala Porto with irrigation
These need water applied — rain alone will not carry them here. The dates are the windows their own water supply allows.
-
SugarcaneFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 120.0 t/ha expected
Pest/disease risk — manageable -
PineappleFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 70.0 t/ha expected
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
BananaFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 60.0 t/ha expected
Pest/disease risk — manageable -
GrapefruitFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 40.0 t/ha expected
Pest/disease risk — manageable -
MandarinFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 35.0 t/ha expected
Pest/disease risk — manageable -
LimeFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 25.0 t/ha expected
Pest/disease risk — manageable -
Oil palmFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 20.8 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimum -
Robusta coffeeFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 3.0 t/ha expected
Pest/disease risk — manageable -
CocoaFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 2.0 t/ha expected
Pest/disease risk — manageable -
Sweet orangeFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 34.4 t/ha expected
Pest/disease risk — manageable -
CoconutFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 2.9 t/ha expected
Pest/disease risk — manageable -
Irish potatoFavourable Needs irrigationPlant 10 Jun 2027 – 30 Jun 2027 opens in 36 weeks
matched to this season's forecast
about 45.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TaroFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 30.0 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
TurmericFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 30.0 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
Sweet potatoFavourable Needs irrigationPlant 21 May 2027 – 30 May 2027 opens in 33 weeks
matched to this season's forecast
about 32.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Swiss chardFavourable Needs irrigationPlant 1 May 2027 – 21 May 2027 opens in 30 weeks
matched to this season's forecast
about 50.0 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
GingerFavourable Needs irrigationPlant 10 Feb 2027 – 2 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 30.0 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk
What Divisi would not plant in Nacala Porto
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Grapefruit Moderate — Water
- Lime Moderate — Water
- Mandarin Moderate — Water
- Sweet orange Moderate — Water
- Avocado Unsuitable
- Banana Unsuitable — Water
- Beetroot Unsuitable — Temperature
- Cabbage Unsuitable — Temperature
- Chickpea Unsuitable — Temperature
- Cocoa Unsuitable — Water
- Coconut Unsuitable — Water
- Taro Unsuitable — Water
- Arabica coffee Unsuitable
- Robusta coffee Unsuitable — Water
- Enset Unsuitable
- Garlic Unsuitable — Temperature
- Ginger Unsuitable — Water
- Irish potato Unsuitable
- Lemon Unsuitable — Temperature
- Niger seed Unsuitable — Temperature
- Oil palm Unsuitable — Water
- Passion fruit Unsuitable — Temperature
- Pineapple Unsuitable — Water
- Sugarcane Unsuitable — Water
- Sweet pepper Unsuitable — Temperature
- Sweet potato Unsuitable — Temperature
- Swiss chard Unsuitable — Temperature
- Tea Unsuitable
- Teff Unsuitable — Temperature
- Turmeric Unsuitable — Water
- Wheat Unsuitable — Temperature
Divisi scored 74 crops against this district's own ground; 31 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Nacala Porto, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Nacala Porto
- 2 September 2026 African Eggplant — Limiting factor changed
- 2 September 2026 African Eggplant — Suitability class changed, now rates Favourable
- 2 September 2026 African Nightshade — Planting window moved, now opens 11 Dec 2026
- 2 September 2026 Amaranth — Planting window moved, now opens 11 Dec 2026
- 2 September 2026 Green Gram — Limiting factor changed
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Where to sell it nearby
Support and extension
- Programa de Desenvolvimento Inclusivo de Cadeias de Valor Agro-Alimentares
- SUSTENTA
- Autoridade Nacional de Sementes
- Direcção Nacional de Extensão Agrária
- Instituto de Investigação Agrária de Moçambique
Frequently asked questions
What crops grow well in Nacala Porto?
Mango, Sesame, Bambara groundnut, Cashew, Egusi melon all rate well in Nacala Porto — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant Mango in Nacala Porto?
In Nacala Porto the window for Mango runs 16 Nov 2026 to 15 Jan 2027.
Is there a farming app that works in Nacala Porto?
Divisi does. It reads Nacala Porto's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?