What grows in Namarroi
Zambézia, Moçambique
The 2026/27 season in Namarroi
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | October 2026 to August 2027 |
| Rain in a typical year | About 1,752 mm |
| This season's rain | Leaning dry — January, February and December look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +1.3 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for a long crop, or two in a year, warm all year, so nothing but rain ends the season |
| Ground this covers | 3 kinds of ground. The season below is the largest that farms — about 71% of this area. |
| 71% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 286 growing days · about 1,700 mm · October to August |
|---|---|
| 22% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 314 growing days · about 1,810 mm · October to September |
| 6% | enough rain for one full main crop; warm all year, so nothing but rain ends the season 254 growing days · about 1,610 mm · October to July |
last updated 17 September 2026
What grows in Namarroi
71% lowland, humid, warm, one season — 69 crops
-
GuavaFavourablePlant 9 Oct 2026 – 22 Apr 2027 opens in 1 week
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 9 Oct 2026 – 22 Apr 2027 opens in 1 week
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
BananaFavourablePlant 9 Oct 2026 – 1 Mar 2027 opens in 1 week
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 55.6 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
LemonFavourablePlant 9 Oct 2026 – 22 Apr 2027 opens in 1 week
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Sweet orangeFavourablePlant 9 Oct 2026 – 28 Nov 2026 opens in 1 week
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MandarinFavourablePlant 9 Oct 2026 – 5 May 2027 opens in 1 week
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
LimeFavourablePlant 9 Oct 2026 – 5 May 2027 opens in 1 week
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CashewFavourablePlant 9 Oct 2026 – 21 Jun 2027 opens in 1 week
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageable -
PineappleFavourablePlant 9 Oct 2026 – 29 Oct 2026 opens in 1 week
matched to this season's forecast
about 50.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
SorghumFavourablePlant 9 Oct 2026 – 27 Mar 2027 opens in 1 week
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
GroundnutFavourablePlant 9 Oct 2026 – 8 Jan 2027 opens in 1 week
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SoybeanFavourablePlant 9 Oct 2026 – 1 Mar 2027 opens in 1 week
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 1 May 2027 · about 4.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
TobaccoFavourablePlant 9 Oct 2026 – 27 Mar 2027 opens in 1 week
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 10 Oct 2026 – 28 Mar 2027 opens in 1 week
matched to this season's forecast
about 2.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Pearl milletFavourablePlant 9 Oct 2026 – 29 Jan 2027 opens in 1 week
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 9 Aug 2026 – 10 Feb 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 9 Oct 2026 – 14 Mar 2027 opens in 1 week
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 9 Oct 2026 – 7 Apr 2027 opens in 1 week
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
FonioFavourablePlant 9 Oct 2026 – 12 Feb 2027 opens in 1 week
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 9 Oct 2026 – 3 Feb 2027 opens in 1 week
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 9 Aug 2026 – 10 Feb 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SesameFavourablePlant 9 Oct 2026 – 26 Dec 2026 opens in 1 week
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 30 Jun 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Arabica coffeeFavourablePlant 10 Oct 2026 – 29 Dec 2026 opens in 1 week
matched to this season's forecast
about 1.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.2 t/ha
Pest/disease risk — manageable -
Robusta coffeeFavourablePlant 9 Oct 2026 – 8 Nov 2026 opens in 1 week
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.6 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 9 Oct 2026 – 29 Oct 2026 opens in 1 week
matched to this season's forecast
about 21.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MaizeFavourablePlant 9 Oct 2026 – 26 Mar 2027 opens in 1 week
matched to this season's forecast
about 6.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.3 t/ha
Pest/disease risk — manageable -
WatermelonFavourablePlant 24 Oct 2026 – 24 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 30 Jun 2026 – 11 Apr 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
PumpkinFavourablePlant 22 Oct 2026 – 9 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
MoringaFavourablePlant 22 Oct 2026 – 1 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PapayaFavourablePlant 22 Oct 2026 – 14 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 46.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 22 Oct 2026 – 14 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 37.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CarrotFavourablePlant 22 Oct 2026 – 27 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
African eggplantFavourablePlant 22 Oct 2026 – 27 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Common beanFavourablePlant 23 Oct 2026 – 9 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 23 Oct 2026 – 12 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 9 Aug 2026 – 2 Mar 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 23 Oct 2026 – 26 Feb 2027 opens in 3 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 24 Oct 2026 – 10 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 14.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Green gramFavourablePlant 24 Oct 2026 – 21 Feb 2027 opens in 3 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 9 Aug 2026 – 10 Feb 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
OkraFavourablePlant 25 Oct 2026 – 3 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 11 Apr 2027 · about 15.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 25 Oct 2026 – 5 May 2027 opens in 3 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 May 2027 · about 13.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 4 Nov 2026 – 16 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 4.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 9 Nov 2026 – 8 Apr 2027 opens in 6 weeks
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 13.9 t/ha
Soil pH below the crop's optimumEarly-maturing — escapes late drought -
CucumberFavourablePlant 10 Nov 2026 – 19 Apr 2027 opens in 6 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 17 Nov 2025 – 18 Sep 2026 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SunflowerFavourablePlant 9 Jan 2027 – 23 Apr 2027 opens in 14 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2027 – 29 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Sweet potatoFavourablePlant 1 Mar 2027 – 14 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 25.0 t/ha expected
· about 30.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Niger seedFavourablePlant 1 Mar 2027 – 22 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 1.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Irish potatoFavourablePlant 12 Mar 2027 – 9 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 22 Mar 2027 – 30 Jun 2027 · about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OnionFavourable
Plant 21 Jan 2027 – 14 Mar 2027 opens in 16 weeks
matched to this season's forecast
about 27.8 t/ha expected
· about 41.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
BeetrootFavourablePlant 24 Mar 2027 – 23 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 24.9 t/ha expected
· about 37.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
WheatFavourablePlant 26 Mar 2027 – 19 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 4.4 t/ha expected
Irrigated: plant 11 Apr 2027 – 30 Jun 2027 · about 6.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Pigeon peaFavourablePlant 9 Oct 2026 – 28 Nov 2026 opens in 1 week
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 9 Aug 2026 – 17 Nov 2026
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 9 Oct 2026 – 29 Oct 2026 opens in 1 week
matched to this season's forecast
about 28.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 9 Oct 2026 – 1 Mar 2027 opens in 1 week
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 9 Oct 2026 – 12 Mar 2027 opens in 1 week
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 46.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
YamFavourablePlant 9 Oct 2026 – 18 Dec 2026 opens in 1 week
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 20 Jul 2026 – 30 Jun 2027
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 9 Oct 2026 – 8 Mar 2027 opens in 1 week
matched to this season's forecast
about 13.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CottonFavourablePlant 9 Oct 2026 – 7 Jan 2027 opens in 1 week
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 3.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TurmericFavourablePlant 9 Oct 2026 – 28 Nov 2026 opens in 1 week
matched to this season's forecast
about 22.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
KaleFavourablePlant 17 Jan 2027 – 2 Mar 2027 opens in 15 weeks
matched to this season's forecast
about 30.6 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Swiss chardFavourablePlant 18 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 2 Mar 2027 – 10 Jun 2027 · about 46.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
Sweet pepperFavourablePlant 18 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 2 Mar 2027 – 21 May 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
SugarcaneFavourablePlant 9 Oct 2026 – 29 Oct 2026 opens in 1 week
matched to this season's forecast
about 61.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 105.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
AvocadoFavourablePlant 10 Oct 2026 – 8 Apr 2027 opens in 1 week
matched to this season's forecast
about 8.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
ChickpeaFavourablePlant 2 May 2027 – 11 May 2027 opens in 30 weeks
matched to this season's forecast
about 2.0 t/ha expected
· about 3.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
TeffFavourablePlant 23 Apr 2027 – 4 Jun 2027 opens in 29 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TaroFavourablePlant 9 Oct 2026 – 29 Oct 2026 opens in 1 week
matched to this season's forecast
about 12.7 t/ha expected
Irrigated: plant 20 Jul 2026 – 30 Jun 2027 · about 27.8 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
GingerFavourablePlant 9 Oct 2026 – 29 Oct 2026 opens in 1 week
matched to this season's forecast
about 17.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
Passion fruitFavourablePlant 24 Oct 2026 – 23 Mar 2027 opens in 3 weeks
based on the rains it usually gets
about 10.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LettuceFavourablePlant 19 Mar 2027 – 23 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 14.7 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
GarlicFavourablePlant 19 Mar 2027 – 28 Mar 2027 opens in 24 weeks
matched to this season's forecast
about 5.0 t/ha expected
Irrigated: plant 11 Apr 2027 – 21 May 2027 · about 16.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CabbageModeratePlant 7 May 2027 – 21 May 2027 opens in 31 weeks
matched to this season's forecast
about 19.8 t/ha expected
· about 48.6 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum
22% lowland, humid, warm, rain year-round — 67 crops
-
GuavaFavourablePlant 9 Oct 2026 – 23 Apr 2027 opens in 1 week
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 9 Oct 2026 – 23 Apr 2027 opens in 1 week
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 9 Oct 2026 – 26 Mar 2027 opens in 1 week
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SoybeanFavourablePlant 9 Oct 2026 – 12 Mar 2027 opens in 1 week
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 1 May 2027 · about 4.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
TobaccoFavourablePlant 9 Oct 2026 – 8 Mar 2027 opens in 1 week
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 9 Oct 2026 – 6 Feb 2027 opens in 1 week
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 9 Aug 2026 – 10 Feb 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 9 Oct 2026 – 1 Mar 2027 opens in 1 week
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 9 Oct 2026 – 27 Mar 2027 opens in 1 week
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
FonioFavourablePlant 9 Oct 2026 – 6 Feb 2027 opens in 1 week
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 9 Oct 2026 – 12 Feb 2027 opens in 1 week
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 9 Aug 2026 – 10 Feb 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SesameFavourablePlant 9 Oct 2026 – 1 Jan 2027 opens in 1 week
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 30 Jun 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 9 Oct 2026 – 1 Jan 2027 opens in 1 week
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CashewFavourablePlant 9 Oct 2026 – 22 Jun 2027 opens in 1 week
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageable -
WatermelonFavourablePlant 25 Oct 2026 – 23 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 29.5 t/ha expected
Irrigated: plant 30 Jun 2026 – 11 Apr 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CarrotFavourablePlant 23 Oct 2026 – 26 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
MoringaFavourablePlant 23 Oct 2026 – 12 Feb 2027 opens in 3 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Common beanFavourablePlant 24 Oct 2026 – 7 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 24 Oct 2026 – 8 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 9 Aug 2026 – 2 Mar 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 25 Oct 2026 – 2 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 9 Aug 2026 – 10 Feb 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
OkraFavourablePlant 26 Oct 2026 – 28 Mar 2027 opens in 4 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 11 Apr 2027 · about 15.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Finger milletFavourablePlant 21 Nov 2026 – 27 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SunflowerFavourablePlant 16 Jan 2027 – 24 Apr 2027 opens in 15 weeks
matched to this season's forecast
about 2.1 t/ha expected
Irrigated: plant 21 Jan 2027 – 29 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Niger seedFavourablePlant 26 Feb 2027 – 23 Apr 2027 opens in 21 weeks
matched to this season's forecast
about 1.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RoselleFavourablePlant 9 Oct 2026 – 18 Feb 2027 opens in 1 week
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 9 Oct 2026 – 29 Oct 2026 opens in 1 week
matched to this season's forecast
about 29.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
BananaFavourablePlant 7 Oct 2026 – 10 Mar 2027 opens in 1 week
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 55.6 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
LemonFavourablePlant 7 Oct 2026 – 19 May 2027 opens in 1 week
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
PumpkinFavourablePlant 10 Oct 2026 – 23 Apr 2027 opens in 1 week
matched to this season's forecast
about 19.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Sweet orangeFavourablePlant 7 Oct 2026 – 16 Dec 2026 opens in 1 week
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
MandarinFavourablePlant 8 Oct 2026 – 6 May 2027 opens in 1 week
matched to this season's forecast
about 14.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
LimeFavourablePlant 7 Oct 2026 – 19 May 2027 opens in 1 week
matched to this season's forecast
about 12.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
MaizeFavourablePlant 10 Oct 2026 – 28 Mar 2027 opens in 1 week
matched to this season's forecast
about 5.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.3 t/ha
Pest/disease risk — manageable -
PineappleFavourablePlant 7 Oct 2026 – 27 Oct 2026 opens in 1 week
matched to this season's forecast
36.6–36.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSteep slope -
Arabica coffeeFavourablePlant 7 Oct 2026 – 26 Dec 2026 opens in 1 week
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.2 t/ha
Pest/disease risk — manageableSteep slope -
Robusta coffeeFavourablePlant 8 Oct 2026 – 7 Dec 2026 opens in 1 week
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.6 t/ha
Pest/disease risk — manageableSteep slope -
GrapefruitFavourablePlant 7 Oct 2026 – 27 Oct 2026 opens in 1 week
matched to this season's forecast
15.7–16.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
AvocadoFavourablePlant 7 Oct 2026 – 21 Apr 2027 opens in 1 week
matched to this season's forecast
about 10.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SugarcaneFavourablePlant 9 Oct 2026 – 29 Oct 2026 opens in 1 week
matched to this season's forecast
about 55.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 105.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 24 Oct 2026 – 13 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 31.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
African eggplantFavourablePlant 24 Oct 2026 – 27 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 19.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
AmaranthFavourablePlant 25 Oct 2026 – 9 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 15.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 25 Oct 2026 – 8 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 14.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Spider plantFavourablePlant 26 Oct 2026 – 4 Apr 2027 opens in 4 weeks
matched to this season's forecast
about 7.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 13.9 t/ha
Soil pH below the crop's optimumEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 28 Oct 2026 – 14 May 2027 opens in 4 weeks
matched to this season's forecast
about 7.8 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 May 2027 · about 13.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 7 Nov 2026 – 13 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 3.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 6 Feb 2027 – 15 Apr 2027 opens in 18 weeks
matched to this season's forecast
about 19.5 t/ha expected
Irrigated: plant 17 Nov 2025 – 18 Sep 2026 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Sweet potatoFavourablePlant 27 Feb 2027 – 13 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 19.5 t/ha expected
· about 30.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Irish potatoFavourablePlant 9 Mar 2027 – 8 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 27.3 t/ha expected
Irrigated: plant 22 Mar 2027 – 30 Jun 2027 · about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OnionFavourable
Plant 23 Jan 2027 – 24 Mar 2027 opens in 16 weeks
matched to this season's forecast
about 23.4 t/ha expected
· about 41.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
BeetrootFavourablePlant 4 Apr 2027 – 22 May 2027 opens in 26 weeks
matched to this season's forecast
about 22.2 t/ha expected
· about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
ChickpeaFavourablePlant 8 May 2027 – 5 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 1.9 t/ha expected
· about 3.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
WheatFavourablePlant 15 Mar 2027 – 19 May 2027 opens in 24 weeks
matched to this season's forecast
about 3.7 t/ha expected
Irrigated: plant 11 Apr 2027 – 30 Jun 2027 · about 6.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TeffFavourablePlant 7 May 2027 – 6 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 2.1 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pigeon peaFavourablePlant 8 Oct 2026 – 17 Nov 2026 opens in 1 week
matched to this season's forecast
about 1.3 t/ha expected
Irrigated: plant 9 Aug 2026 – 17 Nov 2026
Pest/disease risk — manageableSteep slopeLate-maturing — drought risk -
EggplantFavourablePlant 10 Oct 2026 – 15 Mar 2027 opens in 1 week
matched to this season's forecast
about 27.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 46.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
YamFavourablePlant 10 Oct 2026 – 29 Dec 2026 opens in 1 week
matched to this season's forecast
about 19.5 t/ha expected
Irrigated: plant 20 Jul 2026 – 30 Jun 2027
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 10 Oct 2026 – 9 Mar 2027 opens in 1 week
matched to this season's forecast
about 11.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CottonFavourablePlant 10 Oct 2026 – 8 Jan 2027 opens in 1 week
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 3.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TurmericFavourablePlant 10 Oct 2026 – 9 Dec 2026 opens in 1 week
matched to this season's forecast
about 19.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
KaleFavourablePlant 26 Jan 2027 – 3 Mar 2027 opens in 17 weeks
matched to this season's forecast
about 27.3 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Swiss chardFavourablePlant 19 Feb 2027 – 27 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 27.3 t/ha expected
Irrigated: plant 2 Mar 2027 – 10 Jun 2027 · about 46.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
Sweet pepperFavourablePlant 19 Feb 2027 – 15 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 19.4 t/ha expected
Irrigated: plant 2 Mar 2027 – 21 May 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
PapayaFavourablePlant 7 Oct 2026 – 7 Apr 2027 opens in 1 week
matched to this season's forecast
about 22.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Passion fruitFavourablePlant 23 Oct 2026 – 17 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 9.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
LettuceFavourablePlant 12 Mar 2027 – 22 Jun 2027 opens in 23 weeks
matched to this season's forecast
about 13.3 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
GingerFavourablePlant 10 Oct 2026 – 30 Oct 2026 opens in 1 week
matched to this season's forecast
about 14.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
GarlicFavourablePlant 23 Mar 2027 – 14 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 5.7 t/ha expected
Irrigated: plant 11 Apr 2027 – 21 May 2027 · about 16.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk
6% lowland, sub-humid, warm — 69 crops
-
GuavaFavourablePlant 11 Oct 2026 – 9 Apr 2027 opens in 1 week
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 11 Oct 2026 – 9 Apr 2027 opens in 1 week
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 11 Oct 2026 – 16 Mar 2027 opens in 1 week
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SoybeanFavourablePlant 11 Oct 2026 – 8 Feb 2027 opens in 1 week
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 1 May 2027 · about 4.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
TobaccoFavourablePlant 11 Oct 2026 – 18 Feb 2027 opens in 1 week
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 11 Oct 2026 – 16 Mar 2027 opens in 1 week
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 11 Oct 2026 – 31 Jan 2027 opens in 1 week
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 9 Aug 2026 – 10 Feb 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 11 Oct 2026 – 20 Feb 2027 opens in 1 week
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 11 Oct 2026 – 16 Mar 2027 opens in 1 week
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
FonioFavourablePlant 11 Oct 2026 – 31 Jan 2027 opens in 1 week
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 11 Oct 2026 – 27 Jan 2027 opens in 1 week
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 9 Aug 2026 – 10 Feb 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SesameFavourablePlant 11 Oct 2026 – 22 Dec 2026 opens in 1 week
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 30 Jun 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 11 Oct 2026 – 22 Dec 2026 opens in 1 week
matched to this season's forecast
about 2.9 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CashewFavourablePlant 11 Oct 2026 – 6 Jun 2027 opens in 1 week
matched to this season's forecast
about 1.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageable -
BananaFavourablePlant 11 Oct 2026 – 8 Feb 2027 opens in 1 week
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 55.6 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MandarinFavourablePlant 11 Oct 2026 – 21 Apr 2027 opens in 1 week
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
LimeFavourablePlant 11 Oct 2026 – 21 Apr 2027 opens in 1 week
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Sweet orangeFavourablePlant 11 Oct 2026 – 20 Nov 2026 opens in 1 week
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MaizeFavourablePlant 11 Oct 2026 – 14 Mar 2027 opens in 1 week
matched to this season's forecast
about 6.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.3 t/ha
Pest/disease risk — manageable -
PineappleFavourablePlant 11 Oct 2026 – 31 Oct 2026 opens in 1 week
matched to this season's forecast
about 49.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Arabica coffeeFavourablePlant 11 Oct 2026 – 20 Dec 2026 opens in 1 week
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.2 t/ha
Pest/disease risk — manageable -
LemonFavourablePlant 11 Oct 2026 – 9 Apr 2027 opens in 1 week
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Robusta coffeeFavourablePlant 11 Oct 2026 – 31 Oct 2026 opens in 1 week
matched to this season's forecast
about 1.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.6 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 11 Oct 2026 – 31 Oct 2026 opens in 1 week
matched to this season's forecast
about 20.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MoringaFavourablePlant 23 Oct 2026 – 8 Feb 2027 opens in 3 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CarrotFavourablePlant 23 Oct 2026 – 16 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
PapayaFavourablePlant 23 Oct 2026 – 20 Feb 2027 opens in 3 weeks
matched to this season's forecast
about 46.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 23 Oct 2026 – 20 Feb 2027 opens in 3 weeks
matched to this season's forecast
about 37.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
WatermelonFavourablePlant 24 Oct 2026 – 11 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 11 Apr 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Common beanFavourablePlant 24 Oct 2026 – 29 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 25 Oct 2026 – 28 Feb 2027 opens in 3 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 9 Aug 2026 – 2 Mar 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 24 Oct 2026 – 3 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
PumpkinFavourablePlant 24 Oct 2026 – 29 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
AmaranthFavourablePlant 25 Oct 2026 – 14 Feb 2027 opens in 3 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 25 Oct 2026 – 14 Feb 2027 opens in 3 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 9 Aug 2026 – 10 Feb 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
OkraFavourablePlant 27 Oct 2026 – 20 Mar 2027 opens in 4 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 11 Apr 2027 · about 15.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 27 Oct 2026 – 5 Apr 2027 opens in 4 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 May 2027 · about 13.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 4 Nov 2026 – 27 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 4.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 7 Nov 2026 – 27 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 15.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Spider plantFavourablePlant 8 Nov 2026 – 28 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 13.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CucumberFavourablePlant 10 Nov 2026 – 9 Apr 2027 opens in 6 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 17 Nov 2025 – 18 Sep 2026 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SunflowerFavourablePlant 3 Jan 2027 – 28 Mar 2027 opens in 13 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2027 – 29 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
OnionFavourable
Plant 10 Jan 2027 – 3 Mar 2027 opens in 14 weeks
matched to this season's forecast
about 27.8 t/ha expected
· about 41.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Sweet potatoFavourablePlant 20 Feb 2027 – 4 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 25.0 t/ha expected
· about 30.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Niger seedFavourablePlant 20 Feb 2027 – 28 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 1.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Irish potatoFavourablePlant 3 Mar 2027 – 29 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 22 Mar 2027 – 30 Jun 2027 · about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
BeetrootFavourablePlant 10 Mar 2027 – 9 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 27.8 t/ha expected
· about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
WheatFavourablePlant 4 Mar 2027 – 21 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 4.3 t/ha expected
Irrigated: plant 11 Apr 2027 – 30 Jun 2027 · about 6.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Pigeon peaFavourablePlant 11 Oct 2026 – 30 Nov 2026 opens in 1 week
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 9 Aug 2026 – 17 Nov 2026
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 11 Oct 2026 – 8 Feb 2027 opens in 1 week
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 11 Oct 2026 – 18 Feb 2027 opens in 1 week
matched to this season's forecast
about 13.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CottonFavourablePlant 11 Oct 2026 – 20 Dec 2026 opens in 1 week
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 3.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
YamFavourablePlant 11 Oct 2026 – 30 Nov 2026 opens in 1 week
matched to this season's forecast
about 23.1 t/ha expected
Irrigated: plant 20 Jul 2026 – 30 Jun 2027
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 11 Oct 2026 – 31 Oct 2026 opens in 1 week
matched to this season's forecast
about 27.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
TurmericFavourablePlant 11 Oct 2026 – 20 Nov 2026 opens in 1 week
matched to this season's forecast
about 22.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 11 Oct 2026 – 18 Feb 2027 opens in 1 week
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 46.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
KaleFavourablePlant 30 Dec 2026 – 8 Feb 2027 opens in 13 weeks
matched to this season's forecast
about 32.4 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Swiss chardFavourablePlant 19 Jan 2027 – 18 Feb 2027 opens in 16 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 2 Mar 2027 – 10 Jun 2027 · about 46.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
Sweet pepperFavourablePlant 19 Jan 2027 – 18 Feb 2027 opens in 16 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 2 Mar 2027 – 21 May 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
AvocadoFavourablePlant 11 Oct 2026 – 28 Mar 2027 opens in 1 week
matched to this season's forecast
about 10.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Passion fruitFavourablePlant 25 Oct 2026 – 28 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 14.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
ChickpeaFavourablePlant 3 May 2027 – 12 May 2027 opens in 31 weeks
matched to this season's forecast
about 1.9 t/ha expected
· about 3.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
LettuceFavourablePlant 23 Feb 2027 – 9 Apr 2027 opens in 21 weeks
matched to this season's forecast
about 17.6 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
TeffFavourablePlant 25 Apr 2027 – 23 May 2027 opens in 29 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 3.5 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
SugarcaneFavourablePlant 11 Oct 2026 – 31 Oct 2026 opens in 1 week
matched to this season's forecast
about 51.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 105.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
GingerFavourablePlant 11 Oct 2026 – 31 Oct 2026 opens in 1 week
matched to this season's forecast
about 14.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
TaroFavourablePlant 11 Oct 2026 – 31 Oct 2026 opens in 1 week
matched to this season's forecast
about 11.3 t/ha expected
Irrigated: plant 20 Jul 2026 – 30 Jun 2027 · about 27.8 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
GarlicFavourablePlant 10 Mar 2027 – 20 Mar 2027 opens in 23 weeks
matched to this season's forecast
about 5.7 t/ha expected
Irrigated: plant 11 Apr 2027 – 21 May 2027 · about 16.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CabbageModeratePlant 7 May 2027 – 20 May 2027 opens in 31 weeks
matched to this season's forecast
about 15.8 t/ha expected
· about 48.6 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What Divisi would not plant in Namarroi
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Cocoa Only in patches — clears in part of this area, not across any one zone
- Oil palm Only in patches — clears in part of this area, not across any one zone
- Tea Only in patches — clears in part of this area, not across any one zone
- Enset Only in patches — clears in part of this area, not across any one zone
- Coconut Unsuitable — Temperature
Divisi scored 74 crops against this district's own ground; 5 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Namarroi, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Namarroi
- 31 August 2026 Banana Plantain — Limiting factor changed
- 31 August 2026 Banana Plantain — Suitability class changed, now rates Favourable
- 31 August 2026 Pumpkin Butternut — Limiting factor changed, now held back mostly by Soil
- 31 August 2026 Pumpkin Butternut — Suitability class changed, now rates Favourable
- 31 August 2026 Fonio — Limiting factor changed
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Support and extension
- Programa de Desenvolvimento Inclusivo de Cadeias de Valor Agro-Alimentares
- SUSTENTA
- Autoridade Nacional de Sementes
- Direcção Nacional de Extensão Agrária
- Instituto de Investigação Agrária de Moçambique
Frequently asked questions
What crops grow well in Namarroi?
Bambara groundnut, Banana, Cashew, Arabica coffee, Robusta coffee all rate well in Namarroi — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant Bambara groundnut in Namarroi?
In Namarroi the window for Bambara groundnut runs 9 Oct 2026 to 14 Mar 2027.
Is there a farming app that works in Namarroi?
Divisi does. It reads Namarroi's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?
No — these are readings taken across Namarroi, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.