What grows in Quelimane
Zambézia, Moçambique
The 2026/27 season in Quelimane
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | November 2026 to August 2027 |
| Rain in a typical year | About 1,256 mm |
| This season's rain | Leaning dry — January and February look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +1.2 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for a long crop, or two in a year, warm all year, so nothing but rain ends the season |
| Ground this covers | 3 kinds of ground. The season below is the largest that farms — about 92% of this area. |
| 92% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 296 growing days · about 1,280 mm · November to August |
|---|---|
| 3% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 293 growing days · about 1,280 mm · November to August |
| 3% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 301 growing days · about 1,290 mm · November to August |
last updated 17 September 2026
What grows in Quelimane
92% lowland, humid, warm, one season — 65 crops
-
GuavaFavourablePlant 26 Oct 2026 – 13 Apr 2027 opens in 4 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 26 Oct 2026 – 26 Apr 2027 opens in 4 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
GroundnutFavourablePlant 26 Oct 2026 – 20 Feb 2027 opens in 4 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 10 Jun 2026 – 2 Mar 2027 · about 4.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SesameFavourablePlant 26 Oct 2026 – 20 Feb 2027 opens in 4 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 1 May 2026 – 2 Mar 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MaizeFavourablePlant 26 Oct 2026 – 31 Mar 2027 opens in 4 weeks
matched to this season's forecast
about 6.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.3 t/ha
Pest/disease risk — manageable -
PineappleFavourablePlant 26 Oct 2026 – 15 Nov 2026 opens in 4 weeks
matched to this season's forecast
48.7–49.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Sweet orangeFavourablePlant 26 Oct 2026 – 15 Dec 2026 opens in 4 weeks
matched to this season's forecast
21.5–21.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MandarinFavourablePlant 26 Oct 2026 – 26 Apr 2027 opens in 4 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
LimeFavourablePlant 26 Oct 2026 – 26 Apr 2027 opens in 4 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CashewFavourablePlant 24 Oct 2026 – 21 Jun 2027 opens in 3 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
Robusta coffeeFavourablePlant 26 Oct 2026 – 25 Nov 2026 opens in 4 weeks
matched to this season's forecast
1.6–1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.8 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 24 Oct 2026 – 13 Nov 2026 opens in 3 weeks
matched to this season's forecast
20.3–21.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 8 Nov 2026 – 13 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SoybeanFavourablePlant 8 Nov 2026 – 18 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
PapayaFavourablePlant 8 Nov 2026 – 5 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 46.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
BananaFavourablePlant 6 Nov 2026 – 11 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 55.6 t/ha
Pest/disease risk — manageable -
TobaccoFavourablePlant 9 Nov 2026 – 29 Mar 2027 opens in 6 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 8 Nov 2026 – 7 May 2027 opens in 5 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 7 Nov 2026 – 10 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 10 Nov 2026 – 9 Apr 2027 opens in 6 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 12 Nov 2026 – 21 Jun 2027 opens in 6 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 13.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CocoaFavourablePlant 16 Nov 2026 – 6 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CarrotFavourablePlant 21 Nov 2026 – 18 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 21 Nov 2026 – 20 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 19.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 19 Nov 2026 – 16 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 37.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 25 Nov 2026 – 17 Mar 2027 opens in 8 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 27 Nov 2026 – 4 Apr 2027 opens in 8 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
RiceFavourablePlant 4 Dec 2026 – 20 Feb 2027 opens in 9 weeks
matched to this season's forecast
about 4.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 6 Jan 2027 – 31 Mar 2027 opens in 14 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026
Pest/disease risk — manageable -
Egusi melonFavourablePlant 12 Jan 2027 – 31 Mar 2027 opens in 15 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2027 – 22 Mar 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
WatermelonFavourablePlant 18 Jan 2027 – 10 May 2027 opens in 16 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Finger milletFavourablePlant 20 Feb 2027 – 31 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 2 Mar 2027 – 20 Jul 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SunflowerFavourablePlant 5 Mar 2027 – 26 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 2.5 t/ha expected
· about 3.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
LablabFavourablePlant 23 Feb 2027 – 12 Apr 2027 opens in 21 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 2 Mar 2027 – 9 Aug 2027
Pest/disease risk — manageable -
FonioFavourablePlant 18 Jan 2027 – 1 Mar 2027 opens in 16 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 12 Jan 2027 – 18 Mar 2027 opens in 15 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026 · about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
PumpkinFavourablePlant 1 Mar 2027 – 12 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 23.2 t/ha expected
· about 32.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CucumberFavourablePlant 19 Mar 2027 – 20 Apr 2027 opens in 24 weeks
matched to this season's forecast
about 23.2 t/ha expected
· about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
AmaranthFavourablePlant 18 Jan 2027 – 15 Mar 2027 opens in 16 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026 · about 27.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 1 Mar 2027 – 29 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 2 Mar 2026 – 18 Sep 2026 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Spider plantFavourablePlant 23 Feb 2027 – 25 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 2 Mar 2026 – 18 Sep 2026 · about 13.9 t/ha
Soil pH below the crop's optimumEarly-maturing — escapes late drought -
Niger seedFavourablePlant 24 Apr 2027 – 20 May 2027 opens in 29 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 1 May 2027 – 10 Jun 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pigeon peaFavourablePlant 26 Oct 2026 – 15 Mar 2027 opens in 4 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
YamFavourablePlant 26 Oct 2026 – 14 Jan 2027 opens in 4 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 26 Oct 2026 – 5 Mar 2027 opens in 4 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
TurmericFavourablePlant 26 Oct 2026 – 5 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 21.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 26 Oct 2026 – 15 Nov 2026 opens in 4 weeks
matched to this season's forecast
about 26.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 5 Nov 2026 – 5 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 13.9 t/ha expected
Irrigated: plant 7 Dec 2026 – 29 Aug 2027 · about 23.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
RoselleFavourablePlant 21 Dec 2026 – 30 Mar 2027 opens in 12 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 27 Dec 2025 – 18 Sep 2026
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 21 Dec 2026 – 30 Mar 2027 opens in 12 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 27 Dec 2025 – 18 Sep 2026 · about 46.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
SugarcaneFavourablePlant 28 Oct 2026 – 17 Nov 2026 opens in 4 weeks
matched to this season's forecast
about 54.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 111.2 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
CoconutFavourablePlant 28 Oct 2026 – 17 Nov 2026 opens in 4 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageable -
Oil palmFavourablePlant 21 Nov 2026 – 5 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 11.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 19.3 t/ha
Pest/disease risk — manageable -
OnionFavourable
Plant 5 Dec 2026 – 27 Mar 2027 opens in 9 weeks
matched to this season's forecast
about 21.5 t/ha expected
Irrigated: plant 22 Mar 2027 – 20 Jul 2027 · about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WheatFavourablePlant 11 Apr 2027 – 20 May 2027 opens in 27 weeks
matched to this season's forecast
about 3.2 t/ha expected
Irrigated: plant 22 Mar 2027 – 9 Aug 2027 · about 4.9 t/ha
Pest/disease risk — manageable -
BeetrootFavourablePlant 9 May 2027 – 8 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 20.1 t/ha expected
Irrigated: plant 21 May 2027 – 30 Jun 2027 · about 37.1 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Irish potatoFavourablePlant 26 Apr 2027 – 24 May 2027 opens in 30 weeks
matched to this season's forecast
about 21.7 t/ha expected
· about 41.7 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
Sweet potatoFavourablePlant 26 Apr 2027 – 22 May 2027 opens in 30 weeks
matched to this season's forecast
about 15.6 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
KaleFavourablePlant 24 Feb 2027 – 29 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 24.9 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Sweet pepperFavourablePlant 9 Apr 2027 – 20 Apr 2027 opens in 27 weeks
matched to this season's forecast
about 15.3 t/ha expected
· about 37.1 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Arabica coffeeFavourablePlant 24 Oct 2026 – 2 Jan 2027 opens in 3 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimum -
LettuceFavourablePlant 22 May 2027 – 23 Jun 2027 opens in 33 weeks
matched to this season's forecast
about 12.4 t/ha expected
· about 27.4 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
TaroFavourablePlant 26 Oct 2026 – 15 Nov 2026 opens in 4 weeks
matched to this season's forecast
about 11.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
Swiss chardFavourablePlant 9 Apr 2027 – 20 Apr 2027 opens in 27 weeks
matched to this season's forecast
about 19.8 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
GingerModeratePlant 24 Dec 2026 – 3 Jan 2027 opens in 12 weeks
based on the rains it usually gets
about 6.4 t/ha expected
Irrigated: plant 21 Jan 2027 – 30 Jan 2027 · about 27.7 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum
3% humid, warm — 66 crops
-
GuavaFavourablePlant 24 Oct 2026 – 24 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 24 Oct 2026 – 7 May 2027 opens in 3 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
GroundnutFavourablePlant 24 Oct 2026 – 3 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 10 Jun 2026 – 2 Mar 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SesameFavourablePlant 24 Oct 2026 – 3 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 1 May 2026 – 2 Mar 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MandarinFavourablePlant 24 Oct 2026 – 20 May 2027 opens in 3 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageable -
LimeFavourablePlant 24 Oct 2026 – 20 May 2027 opens in 3 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageable -
MaizeFavourablePlant 24 Oct 2026 – 10 Apr 2027 opens in 3 weeks
matched to this season's forecast
about 6.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.3 t/ha
Pest/disease risk — manageable -
PineappleFavourablePlant 24 Oct 2026 – 13 Nov 2026 opens in 3 weeks
matched to this season's forecast
49.7–50.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
Sweet orangeFavourablePlant 24 Oct 2026 – 13 Dec 2026 opens in 3 weeks
matched to this season's forecast
about 21.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.3 t/ha
Pest/disease risk — manageable -
Robusta coffeeFavourablePlant 24 Oct 2026 – 3 Dec 2026 opens in 3 weeks
matched to this season's forecast
1.7–1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.8 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 24 Oct 2026 – 13 Nov 2026 opens in 3 weeks
matched to this season's forecast
20.1–21.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 6 Nov 2026 – 24 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 6 Nov 2026 – 11 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PapayaFavourablePlant 6 Nov 2026 – 11 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 46.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageable -
BananaFavourablePlant 6 Nov 2026 – 29 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 55.6 t/ha
Pest/disease risk — manageable -
TobaccoFavourablePlant 7 Nov 2026 – 10 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 8 Nov 2026 – 22 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CashewFavourablePlant 8 Nov 2026 – 21 Jun 2027 opens in 5 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
Green gramFavourablePlant 8 Nov 2026 – 22 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 10 Nov 2026 – 19 Jun 2027 opens in 6 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 13.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CocoaFavourablePlant 13 Nov 2026 – 3 Mar 2027 opens in 6 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageable -
CarrotFavourablePlant 19 Nov 2026 – 11 Apr 2027 opens in 7 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 19 Nov 2026 – 3 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 19.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
TomatoFavourablePlant 19 Nov 2026 – 29 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 37.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 21 Nov 2026 – 8 May 2027 opens in 7 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 23 Nov 2026 – 7 May 2027 opens in 8 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 25 Nov 2026 – 18 Apr 2027 opens in 8 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 2 Dec 2026 – 3 Mar 2027 opens in 9 weeks
matched to this season's forecast
about 4.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 2 Jan 2027 – 10 Apr 2027 opens in 13 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026 · about 32.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 4 Jan 2027 – 10 Apr 2027 opens in 14 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026
Pest/disease risk — manageable -
FonioFavourablePlant 7 Jan 2027 – 7 Apr 2027 opens in 14 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 10 Jan 2027 – 29 Mar 2027 opens in 14 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2027 – 22 Mar 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 16 Jan 2027 – 22 May 2027 opens in 15 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 18 Feb 2027 – 11 Apr 2027 opens in 20 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 2 Mar 2027 – 20 Jul 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SunflowerFavourablePlant 3 Mar 2027 – 7 May 2027 opens in 22 weeks
matched to this season's forecast
about 2.5 t/ha expected
· about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LablabFavourablePlant 18 Feb 2027 – 11 Apr 2027 opens in 20 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 2 Mar 2027 – 9 Aug 2027
Pest/disease risk — manageable -
Niger seedFavourablePlant 24 Apr 2027 – 20 May 2027 opens in 29 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 1 May 2027 – 10 Jun 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 27 Feb 2027 – 8 May 2027 opens in 21 weeks
matched to this season's forecast
about 23.2 t/ha expected
· about 32.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 17 Mar 2027 – 5 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 23.2 t/ha expected
· about 37.1 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 22 Jan 2027 – 7 Apr 2027 opens in 16 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026 · about 27.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 21 Feb 2027 – 22 Apr 2027 opens in 20 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 2 Mar 2026 – 18 Sep 2026 · about 23.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 21 Feb 2027 – 22 Apr 2027 opens in 20 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 2 Mar 2026 – 18 Sep 2026 · about 13.9 t/ha
Early-maturing — escapes late drought -
OnionFavourable
Plant 27 Feb 2027 – 10 Apr 2027 opens in 21 weeks
matched to this season's forecast
about 25.6 t/ha expected
Irrigated: plant 22 Mar 2027 – 20 Jul 2027 · about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pigeon peaFavourablePlant 24 Oct 2026 – 13 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
YamFavourablePlant 24 Oct 2026 – 12 Jan 2027 opens in 3 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 24 Oct 2026 – 23 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 13.9 t/ha expected
Irrigated: plant 7 Dec 2026 – 29 Aug 2027 · about 23.2 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 24 Oct 2026 – 13 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 24 Oct 2026 – 13 Nov 2026 opens in 3 weeks
matched to this season's forecast
about 27.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
TurmericFavourablePlant 24 Oct 2026 – 2 Jan 2027 opens in 3 weeks
matched to this season's forecast
about 22.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 18 Dec 2026 – 27 Mar 2027 opens in 11 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 27 Dec 2025 – 18 Sep 2026
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 18 Dec 2026 – 7 Apr 2027 opens in 11 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 27 Dec 2025 – 18 Sep 2026 · about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
KaleFavourablePlant 5 Mar 2027 – 7 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 29.2 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CoconutFavourablePlant 24 Oct 2026 – 13 Nov 2026 opens in 3 weeks
matched to this season's forecast
about 1.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageable -
SugarcaneFavourablePlant 24 Oct 2026 – 13 Nov 2026 opens in 3 weeks
matched to this season's forecast
about 58.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 111.2 t/ha
Pest/disease risk — manageable -
Oil palmFavourablePlant 19 Nov 2026 – 16 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 11.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 19.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
BeetrootFavourablePlant 4 May 2027 – 21 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 22.7 t/ha expected
Irrigated: plant 21 May 2027 – 30 Jun 2027 · about 37.1 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Irish potatoFavourablePlant 24 Apr 2027 – 22 May 2027 opens in 29 weeks
matched to this season's forecast
about 24.3 t/ha expected
· about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Sweet potatoFavourablePlant 24 Apr 2027 – 20 May 2027 opens in 29 weeks
matched to this season's forecast
about 17.3 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WheatFavourablePlant 11 Apr 2027 – 7 May 2027 opens in 27 weeks
matched to this season's forecast
about 3.4 t/ha expected
Irrigated: plant 22 Mar 2027 – 9 Aug 2027 · about 4.9 t/ha
Pest/disease risk — manageable -
GingerFavourablePlant 23 Oct 2026 – 22 Nov 2026 opens in 3 weeks
based on the rains it usually gets
about 16.3 t/ha expected
Irrigated: plant 21 Jan 2027 – 30 Jan 2027 · about 27.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
TaroFavourablePlant 24 Oct 2026 – 13 Nov 2026 opens in 3 weeks
matched to this season's forecast
about 12.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
Sweet pepperFavourablePlant 7 Apr 2027 – 18 Apr 2027 opens in 27 weeks
matched to this season's forecast
about 19.4 t/ha expected
· about 37.1 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Swiss chardFavourablePlant 7 Apr 2027 – 18 Apr 2027 opens in 27 weeks
matched to this season's forecast
about 25.6 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Arabica coffeeFavourablePlant 3 Nov 2026 – 2 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimum -
LemonFavourablePlant 5 Nov 2026 – 23 Apr 2027 opens in 5 weeks
based on the rains it usually gets
about 12.5 t/ha expected
Irrigated: plant 1 Jan 2026 – 31 Dec 2026
Pest/disease risk — manageable -
LettuceFavourablePlant 20 May 2027 – 21 Jun 2027 opens in 33 weeks
matched to this season's forecast
about 14.6 t/ha expected
· about 27.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought
3% lowland, humid, warm, rain year-round — 65 crops
-
GuavaFavourablePlant 21 Oct 2026 – 4 May 2027 opens in 3 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 21 Oct 2026 – 4 May 2027 opens in 3 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
CashewFavourablePlant 21 Oct 2026 – 3 Jul 2027 opens in 3 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
SesameFavourablePlant 21 Oct 2026 – 10 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 1 May 2026 – 2 Mar 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MandarinFavourablePlant 21 Oct 2026 – 17 May 2027 opens in 3 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageable -
LimeFavourablePlant 21 Oct 2026 – 17 May 2027 opens in 3 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageable -
PineappleFavourablePlant 21 Oct 2026 – 10 Nov 2026 opens in 3 weeks
matched to this season's forecast
49.7–50.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
Sweet orangeFavourablePlant 21 Oct 2026 – 10 Dec 2026 opens in 3 weeks
matched to this season's forecast
about 21.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.3 t/ha
Pest/disease risk — manageable -
Robusta coffeeFavourablePlant 21 Oct 2026 – 30 Nov 2026 opens in 3 weeks
matched to this season's forecast
1.7–1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.8 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 21 Oct 2026 – 10 Nov 2026 opens in 3 weeks
matched to this season's forecast
20.8–21.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageable -
MaizeFavourablePlant 2 Nov 2026 – 7 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 6.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.3 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 3 Nov 2026 – 21 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 3 Nov 2026 – 28 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 10 Jun 2026 – 2 Mar 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 3 Nov 2026 – 8 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PapayaFavourablePlant 3 Nov 2026 – 26 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 46.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageable -
BananaFavourablePlant 3 Nov 2026 – 26 Mar 2027 opens in 5 weeks
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 55.6 t/ha
Pest/disease risk — manageable -
TobaccoFavourablePlant 4 Nov 2026 – 7 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 5 Nov 2026 – 4 May 2027 opens in 5 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 5 Nov 2026 – 19 Apr 2027 opens in 5 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 7 Nov 2026 – 16 Jun 2027 opens in 5 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 13.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CocoaFavourablePlant 10 Nov 2026 – 28 Feb 2027 opens in 6 weeks
matched to this season's forecast
about 1.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageable -
MoringaFavourablePlant 16 Nov 2026 – 15 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 19.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
TomatoFavourablePlant 16 Nov 2026 – 26 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 37.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CarrotFavourablePlant 18 Nov 2026 – 24 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 18 Nov 2026 – 21 Apr 2027 opens in 7 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 20 Nov 2026 – 19 Apr 2027 opens in 7 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 24 Nov 2026 – 9 Apr 2027 opens in 8 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 29 Nov 2026 – 15 Feb 2027 opens in 8 weeks
matched to this season's forecast
about 4.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 7 Jan 2027 – 26 Mar 2027 opens in 14 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2027 – 22 Mar 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 13 Jan 2027 – 2 Jun 2027 opens in 15 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 13 Jan 2027 – 7 Apr 2027 opens in 15 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026
Pest/disease risk — manageable -
African eggplantFavourablePlant 13 Jan 2027 – 7 Apr 2027 opens in 15 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026 · about 32.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 24 Feb 2027 – 7 Apr 2027 opens in 21 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 2 Mar 2027 – 20 Jul 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SunflowerFavourablePlant 24 Feb 2027 – 5 May 2027 opens in 21 weeks
matched to this season's forecast
about 2.5 t/ha expected
· about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LablabFavourablePlant 15 Feb 2027 – 21 Apr 2027 opens in 20 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 2 Mar 2027 – 9 Aug 2027
Pest/disease risk — manageable -
FonioFavourablePlant 19 Jan 2027 – 4 Apr 2027 opens in 16 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 24 Feb 2027 – 19 May 2027 opens in 21 weeks
matched to this season's forecast
about 23.2 t/ha expected
· about 32.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 14 Mar 2027 – 2 Jun 2027 opens in 23 weeks
matched to this season's forecast
about 23.2 t/ha expected
· about 37.1 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 19 Jan 2027 – 20 Mar 2027 opens in 16 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 8 Oct 2026 · about 27.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 18 Feb 2027 – 19 Apr 2027 opens in 20 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 2 Mar 2026 – 18 Sep 2026 · about 23.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 18 Feb 2027 – 4 Apr 2027 opens in 20 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 2 Mar 2026 – 18 Sep 2026 · about 13.9 t/ha
Early-maturing — escapes late drought -
Niger seedFavourablePlant 21 Apr 2027 – 17 May 2027 opens in 29 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 1 May 2027 – 10 Jun 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pigeon peaFavourablePlant 21 Oct 2026 – 10 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 21 Oct 2026 – 10 Nov 2026 opens in 3 weeks
matched to this season's forecast
about 29.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
YamFavourablePlant 21 Oct 2026 – 9 Jan 2027 opens in 3 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 21 Oct 2026 – 20 Mar 2027 opens in 3 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
TurmericFavourablePlant 21 Oct 2026 – 10 Dec 2026 opens in 3 weeks
matched to this season's forecast
about 22.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 10 Nov 2026 – 20 Mar 2027 opens in 6 weeks
matched to this season's forecast
about 13.9 t/ha expected
Irrigated: plant 7 Dec 2026 – 29 Aug 2027 · about 23.2 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 26 Dec 2026 – 24 Mar 2027 opens in 12 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 27 Dec 2025 – 18 Sep 2026
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 26 Dec 2026 – 24 Mar 2027 opens in 12 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 27 Dec 2025 – 18 Sep 2026 · about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
SugarcaneFavourablePlant 21 Oct 2026 – 10 Nov 2026 opens in 3 weeks
matched to this season's forecast
about 62.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 111.2 t/ha
Pest/disease risk — manageable -
CoconutFavourablePlant 21 Oct 2026 – 10 Nov 2026 opens in 3 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageable -
Oil palmFavourablePlant 16 Nov 2026 – 13 Mar 2027 opens in 7 weeks
matched to this season's forecast
about 11.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 19.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
OnionFavourable
Plant 24 Feb 2027 – 7 Apr 2027 opens in 21 weeks
matched to this season's forecast
about 23.8 t/ha expected
Irrigated: plant 22 Mar 2027 – 20 Jul 2027 · about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
BeetrootFavourablePlant 17 May 2027 – 18 Jun 2027 opens in 33 weeks
matched to this season's forecast
about 22.8 t/ha expected
Irrigated: plant 21 May 2027 – 30 Jun 2027 · about 37.1 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WheatFavourablePlant 26 Mar 2027 – 4 May 2027 opens in 25 weeks
matched to this season's forecast
about 3.5 t/ha expected
Irrigated: plant 22 Mar 2027 – 9 Aug 2027 · about 4.9 t/ha
Pest/disease risk — manageable -
Sweet potatoFavourablePlant 21 Apr 2027 – 17 May 2027 opens in 29 weeks
matched to this season's forecast
about 17.1 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
Irish potatoFavourablePlant 5 May 2027 – 2 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 23.3 t/ha expected
· about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TaroFavourablePlant 21 Oct 2026 – 10 Nov 2026 opens in 3 weeks
matched to this season's forecast
about 12.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
KaleFavourablePlant 2 Mar 2027 – 24 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 26.7 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Sweet pepperFavourablePlant 4 Apr 2027 – 26 Apr 2027 opens in 26 weeks
matched to this season's forecast
about 16.8 t/ha expected
· about 37.1 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Swiss chardFavourablePlant 4 Apr 2027 – 26 Apr 2027 opens in 26 weeks
matched to this season's forecast
about 21.6 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
Arabica coffeeFavourablePlant 31 Oct 2026 – 9 Jan 2027 opens in 4 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimum -
LettuceFavourablePlant 17 May 2027 – 18 Jun 2027 opens in 33 weeks
matched to this season's forecast
about 14.2 t/ha expected
· about 27.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GingerModeratePlant 29 Dec 2026 – 7 Jan 2027 opens in 13 weeks
based on the rains it usually gets
about 6.3 t/ha expected
Irrigated: plant 21 Jan 2027 – 30 Jan 2027 · about 27.7 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What Divisi would not plant in Quelimane
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Avocado Unsuitable — Temperature
- Cabbage Unsuitable — Temperature
- Chickpea Unsuitable — Temperature
- Enset Unsuitable — Temperature
- Garlic Unsuitable — Temperature
- Passion fruit Unsuitable — Temperature
- Tea Unsuitable — Temperature
- Teff Unsuitable — Temperature
Divisi scored 74 crops against this district's own ground; 8 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Quelimane, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Quelimane
- 31 August 2026 Bambara Groundnut — Crop stopped being recommendable
- 31 August 2026 Fonio — Crop stopped being recommendable
- 31 August 2026 Lablab — Crop stopped being recommendable
- 31 August 2026 Papaya — Crop stopped being recommendable
- 31 August 2026 Cowpea — Crop stopped being recommendable
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Support and extension
- Programa de Desenvolvimento Inclusivo de Cadeias de Valor Agro-Alimentares
- SUSTENTA
- Autoridade Nacional de Sementes
- Direcção Nacional de Extensão Agrária
- Instituto de Investigação Agrária de Moçambique
Frequently asked questions
What crops grow well in Quelimane?
Cashew, Robusta coffee, Grapefruit, Groundnut, Guava all rate well in Quelimane — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant Cashew in Quelimane?
In Quelimane the window for Cashew runs 24 Oct 2026 to 21 Jun 2027.
Is there a farming app that works in Quelimane?
Divisi does. It reads Quelimane's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?
No — these are readings taken across Quelimane, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.