What grows in Moroto
Northern, Uganda
The 2027 season in Moroto
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | March 2027 to October 2027 |
| Rain in a typical year | About 675 mm |
| This season's rain | Leaning dry — September and October look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +2.5 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for one full main crop, warm all year, so nothing but rain ends the season |
| Ground this covers | 4 kinds of ground. The season below is the largest that farms — about 75% of this area. |
| 75% | enough rain for one full main crop; warm all year, so nothing but rain ends the season 195 growing days · about 680 mm · March to October |
|---|---|
| 13% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 173 growing days · about 590 mm · March to September |
| 7% | enough rain for one full main crop; warm all year, so nothing but rain ends the season 196 growing days · about 750 mm · March to December |
| 3% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 292 growing days · about 980 mm · March to December |
last updated 17 September 2026
What grows in Moroto
75% lowland, sub-humid, warm — 49 crops
-
Jute mallowFavourablePlant 15 Jun 2027 – 25 Jul 2027 opens in 37 weeks
matched to this season's forecast
9.3–10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CashewFavourablePlant 27 Mar 2027 – 15 Jul 2027 opens in 25 weeks
matched to this season's forecast
1.3–1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PineappleFavourablePlant 5 Mar 2027 – 25 Mar 2027 opens in 22 weeks
matched to this season's forecast
46.9–49.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
WatermelonFavourablePlant 5 Apr 2027 – 24 Jun 2027 opens in 27 weeks
matched to this season's forecast
27.9–33.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
MangoFavourablePlant 16 Mar 2027 – 25 May 2027 opens in 24 weeks
matched to this season's forecast
14.0–16.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
CucumberFavourablePlant 14 Jun 2027 – 24 Jul 2027 opens in 37 weeks
matched to this season's forecast
19.8–23.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Niger seedFavourablePlant 26 Mar 2027 – 25 May 2027 opens in 25 weeks
matched to this season's forecast
0.8–0.9 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 16 Mar 2027 – 4 Jun 2027 opens in 24 weeks
matched to this season's forecast
2.0–2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SunflowerFavourablePlant 26 Mar 2027 – 4 Jun 2027 opens in 25 weeks
matched to this season's forecast
1.9–2.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 7 Dec 2026 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 6 Apr 2027 – 15 Jun 2027 opens in 27 weeks
matched to this season's forecast
18.2–22.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Common beanFavourablePlant 16 May 2027 – 25 Jun 2027 opens in 32 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
LablabFavourablePlant 17 Mar 2027 – 26 May 2027 opens in 24 weeks
matched to this season's forecast
1.5–1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
Green gramFavourablePlant 6 Apr 2027 – 15 Jun 2027 opens in 27 weeks
matched to this season's forecast
1.1–1.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
BeetrootFavourablePlant 5 Jun 2027 – 25 Jun 2027 opens in 35 weeks
matched to this season's forecast
about 21.2 t/ha expected
Irrigated: plant 1 May 2027 – 30 Jun 2027 · about 40.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 17 Mar 2027 – 6 May 2027 opens in 24 weeks
matched to this season's forecast
about 2.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CowpeaFavourablePlant 6 May 2027 – 25 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 1.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 5 Jun 2027 – 25 Jun 2027 opens in 35 weeks
matched to this season's forecast
about 12.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
SorghumFavourablePlant 27 Mar 2027 – 26 May 2027 opens in 25 weeks
matched to this season's forecast
about 2.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 5 Jun 2027 – 5 Jul 2027 opens in 35 weeks
matched to this season's forecast
about 6.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
SoybeanFavourablePlant 17 Mar 2027 – 6 May 2027 opens in 24 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Bambara groundnutFavourablePlant 27 Mar 2027 – 16 May 2027 opens in 25 weeks
matched to this season's forecast
about 1.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
TobaccoFavourablePlant 27 Mar 2027 – 26 May 2027 opens in 25 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Irish potatoFavourablePlant 26 May 2027 – 15 Jun 2027 opens in 34 weeks
matched to this season's forecast
about 22.6 t/ha expected
Irrigated: plant 22 Mar 2027 – 30 Jun 2027 · about 45.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
FonioFavourablePlant 27 Mar 2027 – 16 May 2027 opens in 25 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
OkraFavourablePlant 16 May 2027 – 5 Jul 2027 opens in 32 weeks
matched to this season's forecast
about 6.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Sweet potatoFavourablePlant 27 Mar 2027 – 16 May 2027 opens in 25 weeks
matched to this season's forecast
about 15.6 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
African eggplantFavourablePlant 25 Mar 2027 – 14 May 2027 opens in 25 weeks
matched to this season's forecast
about 15.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 17 Mar 2027 – 6 Apr 2027 opens in 24 weeks
matched to this season's forecast
about 0.8 t/ha expected
Irrigated: plant 30 Jun 2026 – 22 Mar 2027
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Pigeon peaFavourablePlant 7 Mar 2027 – 27 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 1.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
RoselleFavourablePlant 7 Mar 2027 – 26 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 0.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.5 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
CottonFavourablePlant 7 Mar 2027 – 27 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
CassavaFavourablePlant 7 Mar 2027 – 27 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 18.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Passion fruitFavourablePlant 15 May 2027 – 4 Jul 2027 opens in 32 weeks
based on the rains it usually gets
about 9.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
LettuceFavourablePlant 14 Jun 2027 – 14 Jul 2027 opens in 37 weeks
matched to this season's forecast
about 12.8 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 26.1 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
MaizeFavourablePlant 26 Mar 2027 – 15 May 2027 opens in 25 weeks
matched to this season's forecast
about 4.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageableNot enough water in season -
CarrotFavourablePlant 5 Apr 2027 – 4 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 20.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
PapayaFavourablePlant 26 Mar 2027 – 15 May 2027 opens in 25 weeks
matched to this season's forecast
about 28.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
OnionFavourable
Plant 25 Apr 2027 – 14 Jun 2027 opens in 29 weeks
matched to this season's forecast
about 16.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 17 Nov 2026 · about 45.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
AmaranthFavourablePlant 6 Apr 2027 – 26 May 2027 opens in 27 weeks
matched to this season's forecast
about 11.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
TomatoFavourablePlant 27 Mar 2027 – 26 May 2027 opens in 25 weeks
matched to this season's forecast
about 22.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
SesameFavourablePlant 7 Mar 2027 – 26 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 0.7 t/ha expected
Irrigated: plant 11 Apr 2026 – 10 Feb 2027 · about 1.5 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
MoringaFavourablePlant 27 Mar 2027 – 26 May 2027 opens in 25 weeks
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
GroundnutFavourablePlant 7 Mar 2027 – 26 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 1.6 t/ha expected
Irrigated: plant 30 Jun 2026 – 10 Feb 2027 · about 3.8 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
RiceFavourablePlant 27 Mar 2027 – 6 May 2027 opens in 25 weeks
matched to this season's forecast
about 2.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
ChilliFavourablePlant 6 Mar 2027 – 26 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Sweet pepperFavourablePlant 26 Mar 2027 – 25 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 14.5 t/ha expected
Irrigated: plant 2 Mar 2027 – 30 Jun 2027 · about 40.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
EggplantFavourablePlant 26 Mar 2027 – 25 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 20.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Swiss chardFavourablePlant 27 Mar 2027 – 26 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 50.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
KaleFavourablePlant 27 Mar 2027 – 26 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 17.8 t/ha expected
Irrigated: plant 21 Jan 2027 – 9 Aug 2027 · about 50.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum
13% lowland, semi-arid, warm — 46 crops
-
CashewFavourablePlant 18 Mar 2027 – 16 Jul 2027 opens in 24 weeks
matched to this season's forecast
1.0–1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLimited rooting depth -
PineappleFavourablePlant 7 Mar 2027 – 27 Mar 2027 opens in 22 weeks
matched to this season's forecast
40.4–43.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
MangoFavourablePlant 8 Mar 2027 – 27 May 2027 opens in 23 weeks
matched to this season's forecast
9.9–11.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
Jute mallowFavourablePlant 16 Jun 2027 – 26 Jul 2027 opens in 37 weeks
matched to this season's forecast
4.6–5.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
CucumberFavourablePlant 16 Jun 2027 – 16 Jul 2027 opens in 37 weeks
matched to this season's forecast
10.1–12.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Pigeon peaFavourablePlant 8 Mar 2027 – 28 Mar 2027 opens in 23 weeks
matched to this season's forecast
0.9–1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
CassavaFavourablePlant 8 Mar 2027 – 28 Mar 2027 opens in 23 weeks
matched to this season's forecast
13.0–16.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
WatermelonModeratePlant 28 Mar 2027 – 26 Jun 2027 opens in 25 weeks
matched to this season's forecast
14.0–16.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
SunflowerModeratePlant 18 Mar 2027 – 6 Jun 2027 opens in 24 weeks
matched to this season's forecast
1.0–1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 7 Dec 2026 · about 3.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
Pearl milletModeratePlant 18 Mar 2027 – 6 Jun 2027 opens in 24 weeks
matched to this season's forecast
1.0–1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLimited rooting depth -
Niger seedModeratePlant 18 Mar 2027 – 27 May 2027 opens in 24 weeks
matched to this season's forecast
0.4–0.5 t/ha expected
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
LablabModeratePlant 8 Mar 2027 – 27 May 2027 opens in 23 weeks
matched to this season's forecast
0.8–0.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in seasonLimited rooting depth -
PumpkinModeratePlant 18 Mar 2027 – 16 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Green gramModeratePlant 18 Mar 2027 – 16 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 0.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
Egusi melonModeratePlant 18 Mar 2027 – 7 May 2027 opens in 24 weeks
matched to this season's forecast
about 0.4 t/ha expected
Irrigated: plant 30 Jun 2026 – 22 Mar 2027
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
CowpeaModeratePlant 28 Mar 2027 – 26 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 0.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Common beanModeratePlant 17 May 2027 – 26 Jun 2027 opens in 33 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Finger milletModeratePlant 18 Mar 2027 – 27 Apr 2027 opens in 24 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
SoybeanModeratePlant 8 Mar 2027 – 7 May 2027 opens in 23 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
SorghumModeratePlant 18 Mar 2027 – 27 May 2027 opens in 24 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
African nightshadeModeratePlant 6 Jun 2027 – 26 Jun 2027 opens in 35 weeks
matched to this season's forecast
about 5.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Bambara groundnutModeratePlant 18 Mar 2027 – 17 May 2027 opens in 24 weeks
matched to this season's forecast
about 0.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
TobaccoModeratePlant 18 Mar 2027 – 27 May 2027 opens in 24 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
OkraModeratePlant 17 May 2027 – 26 Jun 2027 opens in 33 weeks
matched to this season's forecast
about 3.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Spider plantModeratePlant 6 Jun 2027 – 6 Jul 2027 opens in 35 weeks
matched to this season's forecast
about 3.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Sweet potatoModeratePlant 18 Mar 2027 – 17 May 2027 opens in 24 weeks
matched to this season's forecast
about 8.0 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Irish potatoModeratePlant 17 May 2027 – 16 Jun 2027 opens in 33 weeks
matched to this season's forecast
about 11.1 t/ha expected
Irrigated: plant 22 Mar 2027 – 30 Jun 2027 · about 45.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
SesameModeratePlant 8 Mar 2027 – 17 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 0.4 t/ha expected
Irrigated: plant 11 Apr 2026 – 10 Feb 2027 · about 1.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
African eggplantModeratePlant 18 Mar 2027 – 27 May 2027 opens in 24 weeks
matched to this season's forecast
about 7.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
FonioModeratePlant 18 Mar 2027 – 17 May 2027 opens in 24 weeks
matched to this season's forecast
about 0.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
GroundnutModeratePlant 8 Mar 2027 – 27 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 30 Jun 2026 – 10 Feb 2027 · about 3.8 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
CarrotModeratePlant 28 Mar 2027 – 6 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 9.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
AmaranthModeratePlant 28 Mar 2027 – 27 May 2027 opens in 25 weeks
matched to this season's forecast
about 5.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
TomatoModeratePlant 18 Mar 2027 – 17 May 2027 opens in 24 weeks
matched to this season's forecast
about 11.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
MaizeModeratePlant 18 Mar 2027 – 17 May 2027 opens in 24 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
OnionModerate
Plant 28 Mar 2027 – 16 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 7.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 17 Nov 2026 · about 45.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
BeetrootModeratePlant 6 Jun 2027 – 26 Jun 2027 opens in 35 weeks
matched to this season's forecast
about 10.6 t/ha expected
Irrigated: plant 1 May 2027 – 30 Jun 2027 · about 40.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
LettuceModeratePlant 16 Jun 2027 – 16 Jul 2027 opens in 37 weeks
matched to this season's forecast
about 5.9 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 26.1 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
RiceModeratePlant 17 Mar 2027 – 6 May 2027 opens in 24 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableNot enough water in seasonEarly-maturing — escapes late drought -
CottonModeratePlant 8 Mar 2027 – 28 Mar 2027 opens in 23 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
RoselleModeratePlant 8 Mar 2027 – 17 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 0.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.5 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
ChilliModeratePlant 8 Mar 2027 – 28 Mar 2027 opens in 23 weeks
matched to this season's forecast
about 4.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
EggplantModeratePlant 18 Mar 2027 – 27 Apr 2027 opens in 24 weeks
matched to this season's forecast
about 10.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Sweet pepperModeratePlant 18 Mar 2027 – 27 Apr 2027 opens in 24 weeks
matched to this season's forecast
about 7.2 t/ha expected
Irrigated: plant 2 Mar 2027 – 30 Jun 2027 · about 40.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH outside the crop's range -
Swiss chardModeratePlant 28 Mar 2027 – 27 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 9.1 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 50.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
KaleModeratePlant 28 Mar 2027 – 27 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 21 Jan 2027 – 9 Aug 2027 · about 50.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum
7% highland, sub-humid, warm — 49 crops
-
MangoFavourablePlant 2 Mar 2027 – 31 May 2027 opens in 22 weeks
matched to this season's forecast
15.6–16.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Steep slope -
PineappleFavourablePlant 2 Mar 2027 – 22 Mar 2027 opens in 22 weeks
matched to this season's forecast
41.5–42.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
LemonFavourablePlant 2 Mar 2027 – 31 May 2027 opens in 22 weeks
matched to this season's forecast
16.9–17.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSteep slope -
LimeFavourablePlant 2 Mar 2027 – 31 May 2027 opens in 22 weeks
matched to this season's forecast
12.3–12.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSteep slope -
GuavaFavourablePlant 12 Mar 2027 – 31 May 2027 opens in 23 weeks
matched to this season's forecast
16.0–17.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSteep slope -
AvocadoFavourablePlant 22 Mar 2027 – 31 May 2027 opens in 25 weeks
matched to this season's forecast
8.7–9.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 13.9 t/ha
Steep slope -
Passion fruitFavourablePlant 11 May 2027 – 30 Jun 2027 opens in 32 weeks
matched to this season's forecast
11.6–12.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Sweet orangeFavourablePlant 2 Mar 2027 – 22 Mar 2027 opens in 22 weeks
matched to this season's forecast
12.3–14.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
EnsetFavourablePlant 2 Mar 2027 – 22 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 17.6 t/ha expected
Pest/disease risk — manageableSteep slope -
PapayaFavourablePlant 1 Apr 2027 – 21 May 2027 opens in 26 weeks
matched to this season's forecast
24.7–31.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
CassavaFavourablePlant 2 Mar 2027 – 22 Mar 2027 opens in 22 weeks
matched to this season's forecast
11.5–12.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
BananaFavourablePlant 22 Mar 2027 – 21 May 2027 opens in 25 weeks
matched to this season's forecast
about 15.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageableSteep slope -
TeaFavourablePlant 1 Apr 2027 – 31 May 2027 opens in 26 weeks
matched to this season's forecast
about 1.6 t/ha expected
Irrigated: plant 1 Jan 2026 – 31 Dec 2026
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
GrapefruitFavourablePlant 2 Mar 2027 – 22 Mar 2027 opens in 22 weeks
matched to this season's forecast
about 11.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSteep slope -
MandarinFavourablePlant 2 Mar 2027 – 31 May 2027 opens in 22 weeks
matched to this season's forecast
about 9.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 33.6 t/ha
Pest/disease risk — manageableSteep slope -
CucumberModeratePlant 21 May 2027 – 20 Jul 2027 opens in 33 weeks
matched to this season's forecast
about 9.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSteep slope -
African nightshadeModeratePlant 10 Jun 2027 – 30 Jun 2027 opens in 36 weeks
matched to this season's forecast
about 6.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
WheatModeratePlant 1 Apr 2027 – 31 May 2027 opens in 26 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 1 Jan 2027 – 31 Aug 2027
Pest/disease risk — manageableSteep slope -
SorghumModeratePlant 12 Mar 2027 – 11 May 2027 opens in 23 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableSteep slope -
Common beanModeratePlant 21 May 2027 – 30 Jun 2027 opens in 33 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Niger seedModeratePlant 22 Mar 2027 – 31 May 2027 opens in 25 weeks
matched to this season's forecast
about 0.4 t/ha expected
Pest/disease risk — manageableSteep slope -
Jute mallowModeratePlant 22 Mar 2027 – 20 Jul 2027 opens in 25 weeks
matched to this season's forecast
about 3.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableSteep slope -
LettuceModeratePlant 10 Jun 2027 – 10 Jul 2027 opens in 36 weeks
matched to this season's forecast
about 9.0 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 26.1 t/ha
Pest/disease risk — manageableSteep slope -
Spider plantModeratePlant 10 Jun 2027 – 10 Jul 2027 opens in 36 weeks
matched to this season's forecast
about 3.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableSteep slope -
SunflowerModeratePlant 22 Mar 2027 – 10 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 7 Dec 2026 · about 3.5 t/ha
Pest/disease risk — manageableSteep slope -
BeetrootModeratePlant 21 May 2027 – 30 Jun 2027 opens in 33 weeks
matched to this season's forecast
about 11.0 t/ha expected
Irrigated: plant 1 May 2027 – 30 Jun 2027 · about 40.0 t/ha
Pest/disease risk — manageableSteep slope -
PumpkinModeratePlant 1 Apr 2027 – 20 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 9.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSteep slope -
LablabModeratePlant 12 Mar 2027 – 11 May 2027 opens in 23 weeks
matched to this season's forecast
about 0.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSteep slope -
WatermelonModeratePlant 22 Mar 2027 – 30 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 12.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSteep slope -
Irish potatoModeratePlant 11 May 2027 – 20 Jun 2027 opens in 32 weeks
matched to this season's forecast
about 12.2 t/ha expected
Irrigated: plant 22 Mar 2027 – 30 Jun 2027 · about 45.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
TobaccoModeratePlant 22 Mar 2027 – 1 May 2027 opens in 25 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
MaizeModeratePlant 22 Mar 2027 – 21 May 2027 opens in 25 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageableSteep slope -
OnionModerate
Plant 1 May 2027 – 20 Jun 2027 opens in 30 weeks
matched to this season's forecast
about 9.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 17 Nov 2026 · about 45.0 t/ha
Pest/disease risk — manageableSteep slope -
Sweet pepperModeratePlant 22 Mar 2027 – 1 May 2027 opens in 25 weeks
matched to this season's forecast
about 8.0 t/ha expected
Irrigated: plant 2 Mar 2027 – 30 Jun 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
CarrotModeratePlant 1 Apr 2027 – 10 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 11.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSteep slope -
Finger milletModeratePlant 2 Mar 2027 – 1 May 2027 opens in 22 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableSteep slope -
AmaranthModeratePlant 22 Mar 2027 – 11 May 2027 opens in 25 weeks
matched to this season's forecast
about 6.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableSteep slope -
Swiss chardModeratePlant 1 Apr 2027 – 1 May 2027 opens in 26 weeks
matched to this season's forecast
about 10.9 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 50.0 t/ha
Pest/disease risk — manageableSteep slope -
ChilliModeratePlant 12 Mar 2027 – 1 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 4.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
TomatoModeratePlant 22 Mar 2027 – 1 May 2027 opens in 25 weeks
matched to this season's forecast
about 12.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSteep slope -
KaleModeratePlant 1 Apr 2027 – 1 May 2027 opens in 26 weeks
matched to this season's forecast
about 10.6 t/ha expected
Irrigated: plant 21 Jan 2027 – 9 Aug 2027 · about 50.0 t/ha
Pest/disease risk — manageableSteep slope -
FonioModeratePlant 12 Mar 2027 – 1 May 2027 opens in 23 weeks
matched to this season's forecast
about 0.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
Bambara groundnutModeratePlant 22 Mar 2027 – 1 May 2027 opens in 25 weeks
matched to this season's forecast
about 0.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumSteep slope -
OkraModeratePlant 1 Apr 2027 – 30 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 3.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableSteep slope -
African eggplantModeratePlant 22 Mar 2027 – 1 May 2027 opens in 25 weeks
matched to this season's forecast
about 8.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSteep slope -
EggplantModeratePlant 22 Mar 2027 – 21 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 11.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableSteep slope -
SoybeanModeratePlant 2 Mar 2027 – 21 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableSteep slope -
RiceModeratePlant 2 Mar 2027 – 11 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Not enough water in seasonSteep slope -
GroundnutModeratePlant 2 Mar 2027 – 31 May 2027 opens in 22 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 30 Jun 2026 – 10 Feb 2027 · about 3.8 t/ha
Steep slope
3% highland, humid, warm — 11 crops
-
GuavaFavourablePlant 15 Feb 2027 – 16 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Steep slope -
LemonFavourablePlant 28 Feb 2027 – 16 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Steep slope -
AvocadoFavourablePlant 15 Feb 2027 – 12 Jun 2027 opens in 20 weeks
matched to this season's forecast
about 10.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 13.9 t/ha
Steep slope -
PineappleFavourablePlant 15 Feb 2027 – 7 Mar 2027 opens in 20 weeks
matched to this season's forecast
38.1–39.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Soil pH below the crop's optimumSteep slope -
EnsetFavourablePlant 15 Feb 2027 – 7 Mar 2027 opens in 20 weeks
matched to this season's forecast
19.7–20.3 t/ha expected
Pest/disease risk — manageableSteep slope -
TeaFavourablePlant 26 Mar 2027 – 25 Jun 2027 opens in 25 weeks
matched to this season's forecast
2.1–2.2 t/ha expected
Irrigated: plant 1 Jan 2026 – 31 Dec 2026
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
LimeFavourablePlant 17 Feb 2026 – 26 Sep 2026 closed for this season
matched to this season's forecast
about 7.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSteep slope -
Arabica coffeeFavourablePlant 15 Feb 2027 – 6 May 2027 opens in 20 weeks
matched to this season's forecast
1.0–1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableSteep slope -
Sweet orangeFavourablePlant 15 Feb 2027 – 16 Apr 2027 opens in 20 weeks
matched to this season's forecast
13.3–13.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Steep slope -
Passion fruitFavourablePlant 3 Mar 2027 – 9 Jul 2027 opens in 22 weeks
matched to this season's forecast
9.2–9.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Steep slope -
MangoFavourablePlant 17 Feb 2027 – 18 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 7.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Steep slope
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What grows in Moroto with irrigation
These need water applied — rain alone will not carry them here. The dates are the windows their own water supply allows.
-
Oil palmFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 20.8 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimum -
Robusta coffeeFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 3.0 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimum -
CocoaFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 2.0 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimum -
SugarcaneFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 97.8 t/ha expected
Pest/disease risk — manageable -
TaroFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 30.0 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
GingerFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 30.0 t/ha expected
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
TurmericFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 30.0 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
YamFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 25.0 t/ha expected
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier)
What Divisi would not plant in Moroto
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Chickpea Only in patches — clears in part of this area, not across any one zone
- Garlic Only in patches — clears in part of this area, not across any one zone
- Teff Only in patches — clears in part of this area, not across any one zone
- Cabbage Only in patches — clears in part of this area, not across any one zone
- Robusta coffee Only in patches — clears in part of this area, not across any one zone
- Turmeric Only in patches — clears in part of this area, not across any one zone
- Yam Only in patches — clears in part of this area, not across any one zone
- Taro Moderate — Water
- Sugarcane Moderate
- Ginger Moderate — Slope / terrain
- Cocoa Unsuitable — Water
- Coconut Unsuitable
- Oil palm Unsuitable — Water
Divisi scored 74 crops against this district's own ground; 13 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Moroto, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Moroto
- 2 September 2026 Avocado — Limiting factor changed
- 2 September 2026 Avocado — Suitability class changed, now rates Favourable
- 2 September 2026 Tobacco — Crop stopped being recommendable
- 2 September 2026 Cashew — Crop stopped being recommendable
- 2 September 2026 Sunflower — Crop stopped being recommendable
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Support and extension
- NAADS Agricultural Input Support
- Parish Development Model — Agricultural Value-Chain Pillar
- Department of Crop Inspection and Certification
- Directorate of Agricultural Extension Services
- National Agricultural Research Organisation
Frequently asked questions
What crops grow well in Moroto?
Mango, Pineapple, Jute mallow, Cashew, African eggplant all rate well in Moroto — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant Mango in Moroto?
In Moroto the window for Mango runs 2 Mar 2027 to 31 May 2027.
Is there a farming app that works in Moroto?
Divisi does. It reads Moroto's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?
No — these are readings taken across Moroto, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.