When to plant Jute mallow in Douar El Ma
El Oued, Algeria
Jute mallow (Corchorus olitorius) — known as ewedu, molokhia, mrenda, murere, gusha and bush okra — is a fast, hot-season leafy vegetable grown for its tender leaves and soft shoot tips.
| Fit | Favourable |
|---|---|
| When to plant | 2 Mar 2027 – 1 May 2027 opens in 22 weeks |
| Expected harvest | about 13.9 t/ha |
| Harvest | From 11 Apr 2027 to 30 Jun 2027, depending on the planting date |
| Ready to harvest | 40–60 days after planting |
| Work it takes | 73–141 days per hectare, by hand |
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
If you only get one chance to plant, aim for around 22 Mar 2027. That is the point in the window where the rains are most reliably established.
This season's rainfall outlook for Douar El Ma is close to normal, so these dates match the pattern the area usually follows.
Planting after 1 May 2027 leaves the crop short of season: it runs into the dry months before it has finished filling.
What decides this in Douar El Ma
| Rain and temperature | 96% |
|---|---|
| The soil | 76% |
| The lie of the land | 96% |
For jute mallow in Douar El Ma, the soil is the tightest of the three at 76%. This is the one you can actually move. Lime raises a sour soil, manure and compost lift what it holds, and both work within a season or two — money spent here changes the answer.
The season in Douar El Ma
| Rain in a typical year | About 52 mm |
|---|---|
| This season's rain | Rain close to usual — plan around about 52 mm falling roughly when it always does |
| What that supports | too dry for rain-fed cropping without irrigation, warm, with a cool spell that slows winter growth |
| Ground this covers | One kind of ground throughout. |
last updated 18 September 2026
Frost and pest pressure hold back about 15% of yield here.
What jute mallow needs to grow here
| Soil it likes | well-drained loam or alluvial soil |
|---|---|
| Soil sourness (pH) | Happiest between pH 5.5 and 7.0 |
| Spacing | 47 cm between rows, 12 cm between plants |
| Feed it most with | nitrogen |
What it takes to grow jute mallow in Douar El Ma
| Nitrogen (N) | About 56 kg per hectare |
|---|---|
| Phosphate (P₂O₅) | About 11 kg per hectare |
| Potash (K₂O) | About 70 kg per hectare |
| In the shops | A basal compound at planting — Compound D, or an NPK blend — covers the phosphate and potash. A nitrogen top dressing — urea or AN — goes on once the crop is established. |
| Hand work | 73–141 days per hectare, by hand |
These are the nutrients a jute mallow crop of that size carries off the field. What you actually apply depends on what your soil already holds — which is what a soil test, or the app's field records, tell you.
What to watch for
Grow Jute mallow with a plan, not a guess
Everything above describes Douar El Ma as a whole — your own soil, slope and rainfall will shift the dates. The Divisi app works them out for your field, and dates each job that follows.
Or check your field firstThis calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Frequently asked questions
Will jute mallow grow well in Douar El Ma?
Douar El Ma rates as favourable for jute mallow.
When should I plant jute mallow in Douar El Ma?
Typically 2 Mar 2027 to 1 May 2027, forecast-adjusted.
Is this exact for my own field?
No — these are readings taken across Douar El Ma, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.