When to plant Jute mallow in Sao Domingos
Cabo Verde
Jute mallow (Corchorus olitorius) — known as ewedu, molokhia, mrenda, murere, gusha and bush okra — is a fast, hot-season leafy vegetable grown for its tender leaves and soft shoot tips.
| Measure | Rain-fed | With irrigation |
|---|---|---|
| Fit | Moderate | |
| When to plant | 2 Aug 2027 – 1 Sep 2027 opens in 44 weeks | 11 Apr 2026 – 7 Dec 2026 |
| Expected harvest | about 3.7 t/ha | about 5.5 t/ha |
| Harvest | From 11 Sep 2027 to 31 Oct 2027, depending on the planting date | |
| Ready to harvest | 40–60 days after planting | |
| Work it takes | 73–141 days per hectare, by hand | |
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
If you only get one chance to plant, aim for around 12 Aug 2027. That is the point in the window where the rains are most reliably established.
This season's rainfall outlook for Sao Domingos leans dry, so these dates sit later than the long-run average. Planting on the date you are used to risks germinating into a false start and having to replant.
Planting after 1 Sep 2027 leaves the crop short of season: it runs into the dry months before it has finished filling.
What decides this in Sao Domingos
| Rain and temperature | 96% |
|---|---|
| The soil | 96% |
| The lie of the land | 30% |
For jute mallow in Sao Domingos, the lie of the land is the tightest of the three at 30%. You cannot flatten it, but you can farm it: plant along the contour rather than up and down, ridge or tie ridges to hold water on the slope, and expect shallower rooting than the crop would manage on flat ground.
The 2027 season in Sao Domingos
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | July 2027 to October 2027 |
| Rain in a typical year | About 326 mm in a typical farming district |
| Across its districts | From about 267 mm in the driest of 2 districts to about 326 mm in the wettest |
| This season's rain | Leaning dry — September looks short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| What that supports | enough rain for one short crop, and only if timed to it, warm all year, so nothing but rain ends the season |
| Ground this covers | 3 kinds of ground. The season below is one typical farming district's, not a figure for the whole of this area. |
| 70% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 87 growing days · about 300 mm · August to October |
|---|---|
| 15% | too dry for rain-fed cropping without irrigation; warm all year, so nothing but rain ends the season no rain-fed season · about 240 mm · August to October |
| 15% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 79 growing days · about 260 mm · August to October |
last updated 17 September 2026 · from all 2 areas within it
Sloping ground holds back about 65% of yield here.
What jute mallow needs to grow here
| Soil it likes | well-drained loam or alluvial soil |
|---|---|
| Soil sourness (pH) | Happiest between pH 5.5 and 7.0 |
| Spacing | 47 cm between rows, 12 cm between plants |
| Feed it most with | nitrogen |
What it takes to grow jute mallow in Sao Domingos
| Nitrogen (N) | About 15 kg per hectare |
|---|---|
| Phosphate (P₂O₅) | About 3 kg per hectare |
| Potash (K₂O) | About 18 kg per hectare |
| In the shops | A basal compound at planting — Compound D, or an NPK blend — covers the phosphate and potash. A nitrogen top dressing — urea or AN — goes on once the crop is established. |
| Hand work | 73–141 days per hectare, by hand |
These are the nutrients a jute mallow crop of that size carries off the field. What you actually apply depends on what your soil already holds — which is what a soil test, or the app's field records, tell you.
What to watch for
Grow Jute mallow with a plan, not a guess
Everything above describes Sao Domingos as a whole — your own soil, slope and rainfall will shift the dates. The Divisi app works them out for your field, and dates each job that follows.
Or check your field firstJute mallow in nearby districts
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Frequently asked questions
Will jute mallow grow well in Sao Domingos?
Sao Domingos rates as moderate for jute mallow.
When should I plant jute mallow in Sao Domingos?
Typically 2 Aug 2027 to 1 Sep 2027, forecast-adjusted.
Is this exact for my own field?
No — these are readings taken across Sao Domingos, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.