When to plant Jute mallow in Mali

Save as PDF

Jute mallow

Jute mallow (Corchorus olitorius) — known as ewedu, molokhia, mrenda, murere, gusha and bush okra — is a fast, hot-season leafy vegetable grown for its tender leaves and soft shoot tips.

Jute mallow in Mali, rain-fed and with irrigation
Measure Rain-fed With irrigation
Fit Favourable
When to plant 13 Jul 2027 – 2 Aug 2027 opens in 41 weeks 17 Nov 2026 – 21 Jan 2027
Expected harvest 8.7–9.3 t/ha about 13.9 t/ha
Harvest From 22 Aug 2027 to 1 Oct 2027, depending on the planting date
Ready to harvest 40–60 days after planting
Work it takes 73–141 days per hectare, by hand
Rain meets its needs 95%

Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.

If you only get one chance to plant, aim for around 23 Jul 2027. That is the point in the window where the rains are most reliably established.

This season's rainfall outlook for Mali is close to normal, so these dates match the pattern the area usually follows.

Planting after 2 Aug 2027 leaves the crop short of season: it runs into the dry months before it has finished filling.

What decides this in Mali

Rain and temperature 96%
The soil 76%
The lie of the land 96%

For jute mallow in Mali, the soil is the tightest of the three at 76%. This is the one you can actually move. Lime raises a sour soil, manure and compost lift what it holds, and both work within a season or two — money spent here changes the answer.

The 2027 season in Mali

Rainy seasonsOne each year — one chance to plant, so timing carries it
When the rains are expectedJune 2027 to October 2027
Rain in a typical yearAbout 517 mm in a typical farming district
Across its districtsFrom about 14 mm in the driest of 160 districts to about 1,082 mm in the wettest
This season's rainRain close to usual — plan around about 517 mm falling roughly when it always does
This season's heatHotter than usual — about +1.6 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can.
What that supportsenough rain for one short crop, and only if timed to it, warm all year, so nothing but rain ends the season
Ground this covers4 kinds of ground. The season below is one typical farming district's, not a figure for the whole of this area.
Agro-ecological zones covering this area
67% too dry for rain-fed cropping without irrigation; warm all year, so nothing but rain ends the season no rain-fed season · about 60 mm · July to September
26% enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 124 growing days · about 600 mm · June to October
4% too dry for rain-fed cropping without irrigation; warm, with a cool spell that slows winter growth no rain-fed season · about 10 mm
3% enough rain for one full main crop; warm all year, so nothing but rain ends the season 206 growing days · about 1,010 mm · April to November

last updated 30 September 2026 · from all 160 areas within it

Frost and pest pressure hold back about 15% of yield here.

What jute mallow needs to grow here

Soil it likes well-drained loam or alluvial soil
Soil sourness (pH) Happiest between pH 5.5 and 7.0
Spacing 47 cm between rows, 12 cm between plants
Feed it most with nitrogen

What it takes to grow jute mallow in Mali

Nitrogen (N)About 35 kg per hectare
Phosphate (P₂O₅)About 7 kg per hectare
Potash (K₂O)About 44 kg per hectare
In the shopsA basal compound at planting — Compound D, or an NPK blend — covers the phosphate and potash. A nitrogen top dressing — urea or AN — goes on once the crop is established.
Hand work73–141 days per hectare, by hand

These are the nutrients a jute mallow crop of that size carries off the field. What you actually apply depends on what your soil already holds — which is what a soil test, or the app's field records, tell you.

What to watch for

Pest/disease risk — manageableEarly-maturing — escapes late drought

Grow Jute mallow with a plan, not a guess

Everything above describes Mali as a whole — your own soil, slope and rainfall will shift the dates. The Divisi app works them out for your field, and dates each job that follows.

Or check your field first

Jute mallow in nearby districts

This calendar moves

Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.

Frequently asked questions

Will jute mallow grow well in Mali?

Mali rates as favourable for jute mallow.

When should I plant jute mallow in Mali?

Typically 13 Jul 2027 to 2 Aug 2027, forecast-adjusted.

Is this exact for my own field?

No — these are readings taken across Mali, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.

Also worth considering in Mali

Keep going

Timing is one question. What the crop needs at every stage, what attacks it and where to sell it are the others.