What grows in Ahafo Ano North
Ashanti, Ghana
These figures also cover Akwapem North, Akwapem South and Ho Municipal, where the engine returns the same answer.
The 2026 season in Ahafo Ano North
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | February 2026 to November 2026 |
| Rain in a typical year | About 1,202 mm |
| This season's rain | Leaning dry — September and October look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +0.9 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for a long crop, or two in a year, warm all year, so nothing but rain ends the season |
| Ground this covers | 3 kinds of ground. The season below is the largest that farms — about 67% of this area. |
| 67% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 284 growing days · about 1,210 mm · February to November |
|---|---|
| 27% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 317 growing days · about 1,230 mm · February to December |
| 7% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 318 growing days · about 1,240 mm · February to December |
last updated 30 September 2026
What grows in Ahafo Ano North
67% lowland, humid, warm, one season — 58 crops
-
CashewFavourablePlant 21 Feb 2026 – 3 Oct 2026 open now
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
CucumberFavourablePlant 18 May 2027 – 28 Aug 2027 opens in 33 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 1 May 2027 – 18 Sep 2027 · about 37.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
BananaFavourablePlant 5 Mar 2027 – 23 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 30.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
GuavaFavourablePlant 19 Feb 2027 – 20 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MandarinFavourablePlant 5 Feb 2027 – 17 Sep 2027 opens in 18 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
LimeFavourablePlant 5 Feb 2027 – 17 Sep 2027 opens in 18 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MangoFavourablePlant 19 Feb 2027 – 3 Sep 2027 opens in 20 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
CocoaFavourablePlant 21 Mar 2027 – 28 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PapayaFavourablePlant 5 Mar 2027 – 23 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 49.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 69.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 19 Mar 2027 – 20 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 37.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 66.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CarrotFavourablePlant 19 Mar 2027 – 3 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
WatermelonFavourablePlant 7 Mar 2027 – 18 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
African eggplantFavourablePlant 7 Mar 2027 – 3 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 33.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
PumpkinFavourablePlant 7 Mar 2027 – 3 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 2 Mar 2026 – 28 Oct 2026 · about 33.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
AmaranthFavourablePlant 22 Mar 2027 – 3 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 18.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 22 Mar 2027 – 18 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 17.1 t/ha expected
Irrigated: plant 2 Mar 2026 – 7 Dec 2026 · about 23.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 23 Feb 2027 – 27 Sep 2027 opens in 21 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 28 Mar 2027 – 14 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Spider plantFavourablePlant 25 Mar 2027 – 17 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 2 Mar 2026 – 7 Dec 2026 · about 14.2 t/ha
Soil pH below the crop's optimumEarly-maturing — escapes late drought -
MaizeFavourablePlant 3 Mar 2027 – 6 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 6.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.5 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 5 Mar 2027 – 3 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 3.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
GroundnutFavourablePlant 19 Feb 2027 – 6 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SoybeanFavourablePlant 5 Mar 2027 – 20 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
TobaccoFavourablePlant 7 Mar 2027 – 19 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 19 Mar 2027 – 20 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 2.8 t/ha expected
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 20 Feb 2027 – 16 Sep 2027 opens in 20 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Common beanFavourablePlant 22 Mar 2027 – 3 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 3 Mar 2027 – 1 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 5 Mar 2027 – 17 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 2 Mar 2026 – 28 Oct 2026
Pest/disease risk — manageable -
CowpeaFavourablePlant 22 Mar 2027 – 18 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
FonioFavourablePlant 7 Mar 2027 – 19 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 9 Mar 2027 – 17 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 5 Mar 2027 – 3 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SesameFavourablePlant 19 Feb 2027 – 23 Jul 2027 opens in 20 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PineappleFavourablePlant 5 Feb 2027 – 25 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 51.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageable -
SunflowerFavourablePlant 14 May 2027 – 6 Aug 2027 opens in 32 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 3.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
MoringaFavourablePlant 2 Apr 2027 – 30 Apr 2027 opens in 26 weeks
matched to this season's forecast
about 17.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
RiceFavourablePlant 16 Apr 2027 – 23 Jul 2027 opens in 28 weeks
matched to this season's forecast
about 4.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.6 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Robusta coffeeFavourablePlant 5 Feb 2027 – 27 Mar 2027 opens in 18 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageable -
OnionFavourable
Plant 6 May 2027 – 4 Aug 2027 opens in 31 weeks
matched to this season's forecast
about 25.7 t/ha expected
Irrigated: plant 21 May 2027 – 9 Aug 2027 · about 39.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Oil palmFavourablePlant 2 Apr 2027 – 6 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 12.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 5 Feb 2027 – 25 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 20.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Pigeon peaFavourablePlant 5 Feb 2027 – 25 Jun 2027 opens in 18 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 1 Mar 2027 – 4 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
YamFavourablePlant 5 Feb 2027 – 16 May 2027 opens in 18 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 15 Feb 2027 – 5 Jul 2027 opens in 20 weeks
matched to this season's forecast
about 14.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CottonFavourablePlant 5 Feb 2027 – 25 Jul 2027 opens in 18 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
RoselleFavourablePlant 17 Feb 2027 – 4 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
TurmericFavourablePlant 5 Feb 2027 – 6 May 2027 opens in 18 weeks
matched to this season's forecast
about 22.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 5 Feb 2027 – 25 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 25.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
SugarcaneFavourablePlant 5 Feb 2027 – 25 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 65.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CoconutFavourablePlant 5 Feb 2027 – 25 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.2 t/ha
Pest/disease risk — manageable -
Sweet orangeFavourablePlant 5 Feb 2027 – 16 Apr 2027 opens in 18 weeks
matched to this season's forecast
about 16.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
KaleFavourablePlant 18 Apr 2027 – 11 Jul 2027 opens in 28 weeks
matched to this season's forecast
about 27.3 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 39.9 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
GingerFavourablePlant 17 Mar 2027 – 6 Apr 2027 opens in 24 weeks
matched to this season's forecast
about 17.7 t/ha expected
· about 28.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
TaroFavourablePlant 5 Feb 2027 – 25 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 14.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 29.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Swiss chardFavourablePlant 4 Jun 2027 – 24 Jun 2027 opens in 35 weeks
based on the rains it usually gets
about 24.8 t/ha expected
· about 35.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
LettuceFavourablePlant 21 Jun 2027 – 25 Jul 2027 opens in 38 weeks
matched to this season's forecast
about 11.4 t/ha expected
Irrigated: plant 30 Jun 2027 – 20 Jul 2027 · about 17.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought
27% lowland, humid, warm, rain year-round — 57 crops
-
CashewFavourablePlant 20 Feb 2026 – 2 Oct 2026 open now
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
Pearl milletFavourablePlant 19 Feb 2027 – 15 Sep 2027 opens in 20 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
BananaFavourablePlant 4 Mar 2027 – 5 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 30.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
GuavaFavourablePlant 18 Feb 2027 – 19 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MandarinFavourablePlant 4 Feb 2027 – 16 Sep 2027 opens in 18 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
LimeFavourablePlant 4 Feb 2027 – 16 Sep 2027 opens in 18 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
MangoFavourablePlant 18 Feb 2027 – 2 Sep 2027 opens in 20 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CocoaFavourablePlant 20 Mar 2027 – 27 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PapayaFavourablePlant 4 Mar 2027 – 5 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 49.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 69.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 18 Mar 2027 – 19 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 37.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 66.3 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CarrotFavourablePlant 18 Mar 2027 – 2 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
WatermelonFavourablePlant 6 Mar 2027 – 17 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
African eggplantFavourablePlant 6 Mar 2027 – 2 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 33.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
PumpkinFavourablePlant 6 Mar 2027 – 2 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 2 Mar 2026 – 28 Oct 2026 · about 33.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CucumberFavourablePlant 29 Apr 2027 – 29 Sep 2027 opens in 30 weeks
matched to this season's forecast
about 22.4 t/ha expected
Irrigated: plant 1 May 2027 – 18 Sep 2027 · about 37.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
AmaranthFavourablePlant 24 Mar 2027 – 31 Aug 2027 opens in 25 weeks
matched to this season's forecast
about 18.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 24 Mar 2027 – 16 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 17.1 t/ha expected
Irrigated: plant 2 Mar 2026 – 7 Dec 2026 · about 23.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Jute mallowFavourablePlant 22 Feb 2027 – 26 Sep 2027 opens in 21 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
OkraFavourablePlant 27 Mar 2027 – 13 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Spider plantFavourablePlant 9 Apr 2027 – 16 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 2 Mar 2026 – 7 Dec 2026 · about 14.2 t/ha
Soil pH outside the crop's rangeCorrect soil pH (lime)Correctable with liming -
MaizeFavourablePlant 2 Mar 2027 – 5 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 6.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
SorghumFavourablePlant 4 Mar 2027 – 2 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 3.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
GroundnutFavourablePlant 18 Feb 2027 – 5 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SoybeanFavourablePlant 4 Mar 2027 – 19 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TobaccoFavourablePlant 6 Mar 2027 – 18 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Finger milletFavourablePlant 18 Mar 2027 – 19 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 2.8 t/ha expected
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Common beanFavourablePlant 21 Mar 2027 – 2 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 2 Mar 2027 – 31 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 4 Mar 2027 – 2 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 2 Mar 2026 – 28 Oct 2026
Pest/disease risk — manageable -
CowpeaFavourablePlant 24 Mar 2027 – 16 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
FonioFavourablePlant 8 Mar 2027 – 15 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 8 Mar 2027 – 16 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Egusi melonFavourablePlant 4 Mar 2027 – 2 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SesameFavourablePlant 18 Feb 2027 – 22 Jul 2027 opens in 20 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
PineappleFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 51.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageable -
MoringaFavourablePlant 1 Apr 2027 – 29 Apr 2027 opens in 26 weeks
matched to this season's forecast
about 17.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
RiceFavourablePlant 15 Apr 2027 – 22 Jul 2027 opens in 28 weeks
matched to this season's forecast
about 4.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.6 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Robusta coffeeFavourablePlant 4 Feb 2027 – 5 Apr 2027 opens in 18 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageable -
Oil palmFavourablePlant 1 Apr 2027 – 5 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 12.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 20.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Pigeon peaFavourablePlant 4 Feb 2027 – 24 Jun 2027 opens in 18 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 28 Feb 2027 – 3 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
YamFavourablePlant 4 Feb 2027 – 15 May 2027 opens in 18 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
ChilliFavourablePlant 15 Feb 2027 – 8 Jul 2027 opens in 20 weeks
matched to this season's forecast
about 14.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CottonFavourablePlant 15 Feb 2027 – 19 Jul 2027 opens in 20 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
RoselleFavourablePlant 16 Feb 2027 – 3 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
TurmericFavourablePlant 4 Feb 2027 – 15 May 2027 opens in 18 weeks
matched to this season's forecast
about 22.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CassavaFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 25.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
SunflowerFavourablePlant 3 Mar 2027 – 1 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 3.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
OnionFavourable
Plant 4 Apr 2027 – 17 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 21.4 t/ha expected
Irrigated: plant 21 May 2027 – 9 Aug 2027 · about 39.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SugarcaneFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 65.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CoconutFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Sweet orangeFavourablePlant 4 Feb 2027 – 15 Apr 2027 opens in 18 weeks
matched to this season's forecast
about 16.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.3 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
KaleFavourablePlant 17 Apr 2027 – 10 Jul 2027 opens in 28 weeks
matched to this season's forecast
about 27.2 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 39.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TaroFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 14.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 29.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
GingerFavourablePlant 6 Mar 2027 – 5 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 18.8 t/ha expected
· about 28.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
LettuceFavourablePlant 20 Jun 2027 – 24 Jul 2027 opens in 37 weeks
matched to this season's forecast
about 11.5 t/ha expected
Irrigated: plant 30 Jun 2027 – 20 Jul 2027 · about 17.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime)
7% humid, warm — 57 crops
-
OkraFavourablePlant 27 Mar 2026 – 30 Sep 2026 closed for this season
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Pearl milletFavourablePlant 19 Feb 2026 – 2 Oct 2026 open now
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CashewFavourablePlant 20 Feb 2026 – 18 Oct 2026 open now
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
PapayaFavourablePlant 4 Mar 2027 – 5 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 50.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 69.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 18 Mar 2027 – 2 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 40.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 66.3 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CarrotFavourablePlant 18 Mar 2027 – 2 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
WatermelonFavourablePlant 6 Mar 2027 – 17 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
BananaFavourablePlant 4 Mar 2027 – 5 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 30.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
African eggplantFavourablePlant 6 Mar 2027 – 2 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 33.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
GuavaFavourablePlant 18 Feb 2027 – 2 Sep 2027 opens in 20 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PumpkinFavourablePlant 6 Mar 2027 – 17 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 28 Oct 2026 · about 33.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CucumberFavourablePlant 17 May 2027 – 13 Sep 2027 opens in 33 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 1 May 2027 – 18 Sep 2027 · about 37.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
MandarinFavourablePlant 4 Feb 2027 – 16 Sep 2027 opens in 18 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
AmaranthFavourablePlant 21 Mar 2027 – 2 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 5 Apr 2027 – 17 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 7 Dec 2026 · about 23.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
LimeFavourablePlant 4 Feb 2027 – 16 Sep 2027 opens in 18 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
MangoFavourablePlant 18 Feb 2027 – 2 Sep 2027 opens in 20 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Jute mallowFavourablePlant 22 Feb 2027 – 26 Sep 2027 opens in 21 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Spider plantFavourablePlant 9 Apr 2027 – 16 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 7 Dec 2026 · about 14.2 t/ha
Soil pH outside the crop's rangeCorrect soil pH (lime)Correctable with liming -
MaizeFavourablePlant 2 Mar 2027 – 5 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 7.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
SorghumFavourablePlant 4 Mar 2027 – 16 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
GroundnutFavourablePlant 18 Feb 2027 – 5 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SoybeanFavourablePlant 4 Mar 2027 – 19 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TobaccoFavourablePlant 6 Mar 2027 – 2 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Finger milletFavourablePlant 1 Apr 2027 – 5 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 3.0 t/ha expected
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Common beanFavourablePlant 21 Mar 2027 – 17 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 2 Mar 2027 – 31 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 4 Mar 2027 – 16 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 28 Oct 2026
Pest/disease risk — manageable -
CowpeaFavourablePlant 6 Mar 2027 – 17 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CocoaFavourablePlant 20 Mar 2027 – 27 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
FonioFavourablePlant 6 Mar 2027 – 18 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 8 Mar 2027 – 16 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Egusi melonFavourablePlant 4 Mar 2027 – 2 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SesameFavourablePlant 18 Feb 2027 – 5 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
PineappleFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 52.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageable -
RiceFavourablePlant 15 Apr 2027 – 24 Jun 2027 opens in 28 weeks
matched to this season's forecast
about 4.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.6 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
MoringaFavourablePlant 1 Apr 2027 – 29 Apr 2027 opens in 26 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Oil palmFavourablePlant 1 Apr 2027 – 5 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 12.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 20.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Robusta coffeeFavourablePlant 4 Feb 2027 – 26 Mar 2027 opens in 18 weeks
matched to this season's forecast
about 1.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageable -
EggplantFavourablePlant 28 Feb 2027 – 3 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
YamFavourablePlant 4 Feb 2027 – 15 May 2027 opens in 18 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
ChilliFavourablePlant 14 Feb 2027 – 14 Jul 2027 opens in 19 weeks
matched to this season's forecast
about 15.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
CottonFavourablePlant 4 Feb 2027 – 24 Jul 2027 opens in 18 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
Pigeon peaFavourablePlant 4 Feb 2027 – 24 Jun 2027 opens in 18 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 16 Feb 2027 – 15 Aug 2027 opens in 20 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
TurmericFavourablePlant 4 Feb 2027 – 15 May 2027 opens in 18 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CassavaFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 26.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
SunflowerFavourablePlant 4 Mar 2027 – 16 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 3.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
OnionFavourable
Plant 21 Mar 2027 – 18 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 22.7 t/ha expected
Irrigated: plant 21 May 2027 – 9 Aug 2027 · about 39.1 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
SugarcaneFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 66.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CoconutFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Sweet orangeFavourablePlant 4 Feb 2027 – 15 Apr 2027 opens in 18 weeks
matched to this season's forecast
about 15.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.3 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
KaleFavourablePlant 17 Apr 2027 – 10 Jul 2027 opens in 28 weeks
matched to this season's forecast
about 27.6 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 39.9 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
GingerFavourablePlant 16 Mar 2027 – 5 Apr 2027 opens in 24 weeks
matched to this season's forecast
about 18.7 t/ha expected
· about 28.4 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
TaroFavourablePlant 4 Feb 2027 – 24 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 14.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 29.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
LettuceFavourablePlant 20 Jun 2027 – 24 Jul 2027 opens in 37 weeks
matched to this season's forecast
about 11.3 t/ha expected
Irrigated: plant 30 Jun 2027 – 20 Jul 2027 · about 17.2 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime)
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What Divisi would not plant in Ahafo Ano North
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Irish potato Only in patches — clears in part of this area, not across any one zone
- Avocado Unsuitable — Temperature
- Beetroot Unsuitable — Temperature
- Cabbage Unsuitable — Temperature
- Chickpea Unsuitable — Temperature
- Arabica coffee Unsuitable — Temperature
- Enset Unsuitable — Temperature
- Garlic Unsuitable — Temperature
- Lemon Unsuitable — Temperature
- Niger seed Unsuitable — Temperature
- Passion fruit Unsuitable — Temperature
- Sweet pepper Unsuitable — Temperature
- Sweet potato Unsuitable — Temperature
- Tea Unsuitable — Temperature
- Teff Unsuitable — Temperature
- Wheat Unsuitable — Temperature
Divisi scored 74 crops against this district's own ground; 16 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Ahafo Ano North, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Ahafo Ano North
- 2 September 2026 Amaranth — Limiting factor changed, now held back mostly by Frost & pests
- 2 September 2026 Amaranth — Suitability class changed, now rates Favourable
- 2 September 2026 Amaranth — Planting window moved, now opens 9 Aug 2027
- 2 September 2026 Chickpea — Limiting factor changed, now held back mostly by Frost & pests
- 2 September 2026 Chickpea — Suitability class changed, now rates Favourable
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Where to sell it nearby
-
Techiman Market
67 km · Yam, Maize, Tomato, Cassava
-
Kejetia Market
68 km · Banana & plantain, Cassava, Yam, Tomato
-
Konkomba Yam Market
268 km · Yam, Maize, Cowpea, Groundnut
Support and extension
- GIRSAL Agricultural Credit Guarantee Scheme
- Planting for Food and Jobs Phase II
- CSIR-Crops Research Institute
- National Seed Council
Frequently asked questions
What crops grow well in Ahafo Ano North?
Cashew, African eggplant, African nightshade, Amaranth, Bambara groundnut all rate well in Ahafo Ano North — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant Cashew in Ahafo Ano North?
In Ahafo Ano North the window for Cashew runs 21 Feb 2026 to 3 Oct 2026.
Is there a farming app that works in Ahafo Ano North?
Divisi does. It reads Ahafo Ano North's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?
No — these are readings taken across Ahafo Ano North, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.