What grows in Jaman South Municipal
Bono, Ghana
The 2027 season in Jaman South Municipal
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | February 2027 to November 2027 |
| Rain in a typical year | About 1,068 mm |
| This season's rain | Leaning dry — September and October look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +1.1 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for a long crop, or two in a year, warm all year, so nothing but rain ends the season |
| Ground this covers | 2 kinds of ground. The season below is the largest that farms — about 96% of this area. |
| 96% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 275 growing days · about 1,060 mm · February to November |
|---|---|
| 4% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 272 growing days · about 1,050 mm · March to November |
last updated 30 September 2026
What grows in Jaman South Municipal
96% lowland, humid, warm — 58 crops
-
CarrotFavourablePlant 1 Apr 2027 – 23 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 47.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 10 Mar 2027 – 8 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GuavaFavourablePlant 23 Feb 2027 – 22 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 22.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSteep slope -
MangoFavourablePlant 23 Feb 2027 – 22 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 16.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSteep slope -
OkraFavourablePlant 29 Mar 2027 – 10 Sep 2027 opens in 26 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SorghumFavourablePlant 8 Mar 2027 – 4 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 3.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 24 Feb 2027 – 18 Jul 2027 opens in 21 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 8 Mar 2027 – 30 Jul 2027 opens in 23 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 8 Mar 2027 – 11 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 8 Mar 2027 – 11 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 22 Mar 2027 – 29 Aug 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 10 Mar 2027 – 8 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 23 Mar 2027 – 26 Aug 2027 opens in 25 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SunflowerFavourablePlant 25 Apr 2027 – 30 Jul 2027 opens in 29 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 17 Mar 2027 – 7 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 6 Mar 2027 – 18 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 2 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageable -
CowpeaFavourablePlant 23 Mar 2027 – 8 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CashewFavourablePlant 26 Feb 2027 – 24 Sep 2027 opens in 21 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSteep slope -
FonioFavourablePlant 10 Mar 2027 – 13 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 12 Mar 2027 – 10 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 8 Mar 2027 – 23 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SesameFavourablePlant 24 Feb 2027 – 6 Jul 2027 opens in 21 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PapayaFavourablePlant 19 Mar 2027 – 18 Jul 2027 opens in 24 weeks
matched to this season's forecast
about 50.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 69.3 t/ha
Pest/disease risk — manageable -
TomatoFavourablePlant 1 Apr 2027 – 11 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 37.9 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 66.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 20 Mar 2027 – 23 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 33.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 8 Mar 2027 – 4 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 2 Mar 2026 – 28 Oct 2026 · about 33.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 13 Apr 2027 – 25 Sep 2027 opens in 28 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 1 May 2027 – 18 Sep 2027 · about 37.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MandarinFavourablePlant 23 Feb 2027 – 22 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 17.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSteep slope -
AmaranthFavourablePlant 23 Mar 2027 – 13 Aug 2027 opens in 25 weeks
matched to this season's forecast
about 18.9 t/ha expected
Irrigated: plant 2 Mar 2026 – 10 Feb 2027 · about 28.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 5 Apr 2027 – 8 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 17.1 t/ha expected
Irrigated: plant 22 Mar 2026 – 17 Nov 2026 · about 23.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LimeFavourablePlant 23 Feb 2027 – 22 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 16.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSteep slope -
Jute mallowFavourablePlant 16 Mar 2027 – 24 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 9 Apr 2027 – 10 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 22 Mar 2026 – 17 Nov 2026 · about 14.2 t/ha
Early-maturing — escapes late drought -
MaizeFavourablePlant 6 Mar 2027 – 27 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 6.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.5 t/ha
Pest/disease risk — manageable -
OnionFavourable
Plant 7 May 2027 – 30 Jul 2027 opens in 31 weeks
matched to this season's forecast
about 28.4 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 41.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 10 Apr 2027 – 15 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 16.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
BananaFavourablePlant 7 Mar 2027 – 17 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 24.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageableSteep slope -
PineappleFavourablePlant 12 Feb 2027 – 4 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 47.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Pigeon peaFavourablePlant 14 Feb 2027 – 14 Jun 2027 opens in 19 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 4 Mar 2027 – 22 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 14 Mar 2027 – 22 Jul 2027 opens in 23 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 4 Mar 2027 – 2 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 14.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 22 Feb 2027 – 2 Jul 2027 opens in 21 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
YamFavourablePlant 12 Feb 2027 – 13 Apr 2027 opens in 19 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
TurmericFavourablePlant 12 Feb 2027 – 13 Apr 2027 opens in 19 weeks
matched to this season's forecast
about 22.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 12 Feb 2027 – 4 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 24.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
RiceFavourablePlant 13 Apr 2027 – 24 Jun 2027 opens in 28 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.6 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CocoaFavourablePlant 3 Apr 2027 – 12 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSteep slope -
GrapefruitFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
17.4–18.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSteep slope -
Sweet orangeFavourablePlant 11 Feb 2027 – 13 Mar 2027 opens in 19 weeks
matched to this season's forecast
17.3–18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 29.3 t/ha
Pest/disease risk — manageableSteep slope -
Robusta coffeeFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 1.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableSteep slope -
Oil palmFavourablePlant 31 Mar 2027 – 17 Jul 2027 opens in 26 weeks
matched to this season's forecast
about 9.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageableSteep slope -
SugarcaneFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 54.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
Swiss chardFavourablePlant 4 Jun 2027 – 24 Jun 2027 opens in 35 weeks
based on the rains it usually gets
about 27.6 t/ha expected
· about 42.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
KaleFavourablePlant 23 Apr 2027 – 12 Jul 2027 opens in 29 weeks
matched to this season's forecast
about 27.7 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 40.5 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
TaroFavourablePlant 12 Feb 2027 – 4 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 12.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 29.7 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
CoconutFavourablePlant 12 Feb 2027 – 4 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSteep slope -
LettuceFavourablePlant 29 Jun 2027 – 29 Jul 2027 opens in 39 weeks
matched to this season's forecast
about 12.3 t/ha expected
· about 17.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GingerFavourablePlant 16 Mar 2027 – 26 Mar 2027 opens in 24 weeks
matched to this season's forecast
about 12.6 t/ha expected
· about 28.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk
4% humid, warm — 58 crops
-
PapayaFavourablePlant 7 Mar 2027 – 17 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 50.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 69.3 t/ha
Pest/disease risk — manageable -
TomatoFavourablePlant 31 Mar 2027 – 10 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 40.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 66.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CarrotFavourablePlant 31 Mar 2027 – 10 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 47.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 9 Mar 2027 – 7 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 19 Mar 2027 – 22 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 33.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GuavaFavourablePlant 23 Feb 2027 – 22 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
PumpkinFavourablePlant 9 Mar 2027 – 7 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 28 Oct 2026 · about 33.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 12 May 2027 – 24 Sep 2027 opens in 32 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 1 May 2027 – 18 Sep 2027 · about 37.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MandarinFavourablePlant 23 Feb 2027 – 22 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
AmaranthFavourablePlant 4 Apr 2027 – 25 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 10 Feb 2027 · about 28.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 4 Apr 2027 – 7 Sep 2027 opens in 26 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 17 Nov 2026 · about 23.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LimeFavourablePlant 23 Feb 2027 – 22 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 23 Feb 2027 – 22 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
Jute mallowFavourablePlant 15 Mar 2027 – 23 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 12 Apr 2027 – 9 Sep 2027 opens in 28 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 8 Apr 2027 – 9 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 17 Nov 2026 · about 14.2 t/ha
Early-maturing — escapes late drought -
MaizeFavourablePlant 5 Mar 2027 – 26 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 7.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.5 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 7 Mar 2027 – 3 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 7 Mar 2027 – 29 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 7 Mar 2027 – 10 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 9 Mar 2027 – 12 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 31 Mar 2027 – 22 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 22 Mar 2027 – 29 Aug 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 9 Mar 2027 – 7 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 22 Mar 2027 – 7 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 16 Mar 2027 – 17 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 16 Mar 2027 – 17 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageable -
CowpeaFavourablePlant 22 Mar 2027 – 7 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CashewFavourablePlant 25 Feb 2027 – 23 Sep 2027 opens in 21 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
FonioFavourablePlant 9 Mar 2027 – 12 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 25 Mar 2027 – 9 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 7 Mar 2027 – 22 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SesameFavourablePlant 23 Feb 2027 – 17 Jul 2027 opens in 21 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SunflowerFavourablePlant 18 May 2027 – 10 Aug 2027 opens in 33 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
BananaFavourablePlant 7 Mar 2027 – 17 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 27.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageable -
OnionFavourable
Plant 13 May 2027 – 30 Jul 2027 opens in 32 weeks
matched to this season's forecast
about 26.6 t/ha expected
Irrigated: plant 21 May 2027 – 20 Jul 2027 · about 41.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PineappleFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 48.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
RiceFavourablePlant 12 Apr 2027 – 11 Jun 2027 opens in 28 weeks
matched to this season's forecast
about 4.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.6 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 31 Mar 2027 – 11 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 16.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CocoaFavourablePlant 2 Apr 2027 – 11 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
EggplantFavourablePlant 13 Mar 2027 – 21 Jul 2027 opens in 23 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 3 Mar 2027 – 1 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 15.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 21 Feb 2027 – 1 Jul 2027 opens in 20 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Pigeon peaFavourablePlant 11 Feb 2027 – 11 Jun 2027 opens in 19 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 3 Mar 2027 – 31 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
YamFavourablePlant 11 Feb 2027 – 12 Apr 2027 opens in 19 weeks
matched to this season's forecast
about 24.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
TurmericFavourablePlant 11 Feb 2027 – 12 Apr 2027 opens in 19 weeks
matched to this season's forecast
about 23.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
KaleFavourablePlant 22 Apr 2027 – 11 Jul 2027 opens in 29 weeks
matched to this season's forecast
about 29.0 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 40.5 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
GrapefruitFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 19.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageable -
Robusta coffeeFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageable -
Oil palmFavourablePlant 31 Mar 2027 – 5 Jul 2027 opens in 26 weeks
matched to this season's forecast
about 10.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
SugarcaneFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 59.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableNot enough water in season -
Sweet orangeFavourablePlant 11 Feb 2027 – 13 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 16.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 29.3 t/ha
Pest/disease risk — manageable -
Swiss chardFavourablePlant 11 Jun 2027 – 1 Jul 2027 opens in 36 weeks
based on the rains it usually gets
about 23.6 t/ha expected
· about 42.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
TaroFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 13.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 29.7 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
CoconutFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableNot enough water in season -
LettuceFavourablePlant 26 Jun 2027 – 26 Jul 2027 opens in 38 weeks
matched to this season's forecast
about 12.4 t/ha expected
· about 17.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GingerFavourablePlant 23 Mar 2027 – 2 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 14.6 t/ha expected
· about 28.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What Divisi would not plant in Jaman South Municipal
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Irish potato Only in patches — clears in part of this area, not across any one zone
- Sweet potato Only in patches — clears in part of this area, not across any one zone
- Niger seed Only in patches — clears in part of this area, not across any one zone
- Avocado Unsuitable — Temperature
- Beetroot Unsuitable — Temperature
- Cabbage Unsuitable — Temperature
- Chickpea Unsuitable — Temperature
- Arabica coffee Unsuitable — Temperature
- Enset Unsuitable — Temperature
- Garlic Unsuitable — Temperature
- Lemon Unsuitable — Temperature
- Passion fruit Unsuitable — Temperature
- Sweet pepper Unsuitable — Temperature
- Tea Unsuitable — Temperature
- Teff Unsuitable — Temperature
- Wheat Unsuitable — Temperature
Divisi scored 74 crops against this district's own ground; 16 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Jaman South Municipal, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Jaman South Municipal
- 2 September 2026 Lime — Limiting factor changed, now held back mostly by Frost & pests
- 2 September 2026 Lime — Suitability class changed, now rates Favourable
- 2 September 2026 Okra — Limiting factor changed, now held back mostly by Frost & pests
- 2 September 2026 Okra — Suitability class changed, now rates Favourable
- 2 September 2026 Passion Fruit — Limiting factor changed, now held back mostly by Frost & pests
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Where to sell it nearby
-
Techiman Market
106 km · Yam, Maize, Tomato, Cassava
-
Kejetia Market
176 km · Banana & plantain, Cassava, Yam, Tomato
-
Marché Gouro d'Adjamé
283 km · Banana & plantain, Cassava, Yam, Tomato
Support and extension
- GIRSAL Agricultural Credit Guarantee Scheme
- Planting for Food and Jobs Phase II
- CSIR-Crops Research Institute
- National Seed Council
Frequently asked questions
What crops grow well in Jaman South Municipal?
African eggplant, African nightshade, Amaranth, Bambara groundnut, Banana all rate well in Jaman South Municipal — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant African eggplant in Jaman South Municipal?
In Jaman South Municipal the window for African eggplant runs 20 Mar 2027 to 23 Aug 2027.
Is there a farming app that works in Jaman South Municipal?
Divisi does. It reads Jaman South Municipal's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?
No — these are readings taken across Jaman South Municipal, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.