The 2027 season in Shai Osudoku
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | March 2027 to December 2027 |
| Rain in a typical year | About 990 mm |
| This season's rain | Leaning dry — September and October look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +0.5 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for a long crop, or two in a year, warm all year, so nothing but rain ends the season |
| Ground this covers | 4 kinds of ground. The season below is the largest that farms — about 59% of this area. |
| 59% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 276 growing days · about 1,000 mm · March to December |
|---|---|
| 30% | enough rain for one full main crop; warm all year, so nothing but rain ends the season 268 growing days · about 960 mm · March to November |
| 6% | enough rain for one full main crop; warm all year, so nothing but rain ends the season 260 growing days · about 950 mm · March to November |
| 5% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 303 growing days · about 1,030 mm · February to December |
last updated 30 September 2026
What grows in Shai Osudoku
59% lowland, humid, warm, one season — 55 crops
-
CarrotFavourablePlant 9 Apr 2027 – 15 May 2027 opens in 27 weeks
matched to this season's forecast
about 34.9 t/ha expected
Irrigated: plant 22 Mar 2026 – 28 Oct 2026 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 31 Mar 2027 – 17 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GuavaFavourablePlant 3 Mar 2027 – 10 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 24.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 3 Mar 2027 – 21 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
OkraFavourablePlant 6 Apr 2027 – 5 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SorghumFavourablePlant 16 Mar 2027 – 8 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 14 Mar 2027 – 27 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 14 Mar 2027 – 8 May 2027 opens in 23 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 28 Mar 2027 – 15 May 2027 opens in 25 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 18 Mar 2027 – 17 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 31 Mar 2027 – 22 May 2027 opens in 26 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 25 Mar 2027 – 8 May 2027 opens in 25 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageableSoil pH below the crop's optimum -
LablabFavourablePlant 8 May 2027 – 10 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 1 May 2027 – 9 Aug 2027
Pest/disease risk — manageable -
CowpeaFavourablePlant 31 Mar 2027 – 4 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CashewFavourablePlant 20 Mar 2027 – 26 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
FonioFavourablePlant 31 Mar 2027 – 9 May 2027 opens in 26 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Green gramFavourablePlant 3 Apr 2027 – 29 May 2027 opens in 26 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 25 Mar 2027 – 30 May 2027 opens in 25 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SesameFavourablePlant 4 Mar 2027 – 21 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 3 May 2027 – 27 May 2027 opens in 31 weeks
matched to this season's forecast
about 2.7 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TomatoFavourablePlant 5 Apr 2027 – 8 May 2027 opens in 27 weeks
matched to this season's forecast
about 40.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 28 Oct 2026 · about 70.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 28 Mar 2027 – 15 May 2027 opens in 25 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 3 May 2027 – 8 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 25.0 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 5 Jun 2027 – 5 Jul 2027 opens in 35 weeks
matched to this season's forecast
about 25.0 t/ha expected
· about 40.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MandarinFavourablePlant 3 Mar 2027 – 13 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 19.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
AmaranthFavourablePlant 31 Mar 2027 – 22 May 2027 opens in 26 weeks
matched to this season's forecast
about 19.8 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 30.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 9 May 2027 – 4 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 May 2027 – 18 Sep 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
LimeFavourablePlant 3 Mar 2027 – 13 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 17.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Jute mallowFavourablePlant 6 Apr 2027 – 5 Jul 2027 opens in 27 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 15 May 2027 – 12 Jun 2027 opens in 32 weeks
matched to this season's forecast
about 10.0 t/ha expected
· about 15.0 t/ha
Early-maturing — escapes late drought -
MaizeFavourablePlant 14 Mar 2027 – 16 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 7.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageable -
PapayaFavourablePlant 14 Mar 2027 – 16 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 47.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
RiceFavourablePlant 16 Apr 2027 – 8 May 2027 opens in 28 weeks
matched to this season's forecast
about 4.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 24 Mar 2027 – 26 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 16.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
RoselleFavourablePlant 12 Mar 2027 – 1 May 2027 opens in 23 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 22 Mar 2027 – 18 Sep 2027
Pest/disease risk — manageableLate-maturing — drought risk -
Pigeon peaFavourablePlant 20 Feb 2027 – 22 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 22 Mar 2027 – 21 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 34.3 t/ha expected
· about 50.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 2 Mar 2027 – 11 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 19 Feb 2027 – 11 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 26.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 12 Mar 2027 – 11 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 13.1 t/ha expected
Irrigated: plant 22 Mar 2027 – 29 Aug 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
YamFavourablePlant 20 Feb 2027 – 22 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 21.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
BananaFavourablePlant 14 Mar 2027 – 16 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 23.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageable -
PineappleFavourablePlant 21 Feb 2027 – 13 Mar 2027 opens in 20 weeks
based on the rains it usually gets
about 43.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 61.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
SunflowerFavourablePlant 16 Mar 2027 – 8 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 2.6 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GrapefruitFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 18.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
OnionFavourable
Plant 9 Apr 2027 – 3 May 2027 opens in 27 weeks
matched to this season's forecast
about 22.3 t/ha expected
Irrigated: plant 2 Mar 2026 – 17 Nov 2026 · about 33.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CocoaFavourablePlant 2 Mar 2027 – 21 May 2027 opens in 22 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
CoconutFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.4 t/ha
Pest/disease risk — manageableNot enough water in season -
TurmericFavourablePlant 2 Mar 2027 – 11 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 19.0 t/ha expected
· about 30.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
Sweet orangeFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 13.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Oil palmFavourablePlant 25 Mar 2027 – 8 May 2027 opens in 25 weeks
matched to this season's forecast
about 8.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
SugarcaneFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 48.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableNot enough water in season -
TaroFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 10.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
KaleFavourablePlant 1 Apr 2027 – 11 May 2027 opens in 26 weeks
matched to this season's forecast
about 16.4 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 32.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
LettuceModeratePlant 5 Jun 2027 – 20 Jun 2027 opens in 35 weeks
matched to this season's forecast
about 7.1 t/ha expected
Irrigated: plant 30 Jun 2027 – 20 Jul 2027 · about 12.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought
30% lowland, sub-humid, warm — 55 crops
-
CarrotFavourablePlant 9 Apr 2027 – 15 May 2027 opens in 27 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 28 Oct 2026 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 18 Mar 2027 – 17 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MangoFavourablePlant 3 Mar 2027 – 21 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
OkraFavourablePlant 6 Apr 2027 – 5 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SorghumFavourablePlant 14 Mar 2027 – 21 Jun 2027 opens in 23 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 14 Mar 2027 – 27 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 14 Mar 2027 – 19 May 2027 opens in 23 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 28 Mar 2027 – 15 May 2027 opens in 25 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 18 Mar 2027 – 17 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 28 Mar 2027 – 27 May 2027 opens in 25 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 25 Mar 2027 – 19 May 2027 opens in 25 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageableSoil pH below the crop's optimum -
LablabFavourablePlant 16 Apr 2027 – 21 Jun 2027 opens in 28 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 1 May 2027 – 9 Aug 2027
Pest/disease risk — manageable -
CowpeaFavourablePlant 31 Mar 2027 – 4 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CashewFavourablePlant 6 Mar 2027 – 10 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
FonioFavourablePlant 18 Mar 2027 – 9 May 2027 opens in 24 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Green gramFavourablePlant 3 Apr 2027 – 12 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 14 Mar 2027 – 21 Jun 2027 opens in 23 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SesameFavourablePlant 4 Mar 2027 – 21 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 21 Apr 2027 – 20 Jun 2027 opens in 29 weeks
matched to this season's forecast
about 3.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GuavaFavourablePlant 3 Mar 2027 – 21 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 24.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
TomatoFavourablePlant 5 Apr 2027 – 8 May 2027 opens in 27 weeks
matched to this season's forecast
about 40.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 28 Oct 2026 · about 70.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 28 Mar 2027 – 27 May 2027 opens in 25 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 21 Apr 2027 – 20 Jun 2027 opens in 29 weeks
matched to this season's forecast
about 25.0 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 5 Jun 2027 – 5 Jul 2027 opens in 35 weeks
matched to this season's forecast
about 25.0 t/ha expected
· about 40.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 26 Apr 2027 – 17 Jun 2027 opens in 30 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 May 2027 – 18 Sep 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 6 Apr 2027 – 5 Jul 2027 opens in 27 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 1 May 2027 – 12 Jun 2027 opens in 30 weeks
matched to this season's forecast
about 10.0 t/ha expected
· about 15.0 t/ha
Early-maturing — escapes late drought -
MaizeFavourablePlant 14 Mar 2027 – 27 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 7.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageable -
AmaranthFavourablePlant 31 Mar 2027 – 22 May 2027 opens in 26 weeks
matched to this season's forecast
about 19.9 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 30.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PapayaFavourablePlant 14 Mar 2027 – 16 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 48.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MandarinFavourablePlant 3 Mar 2027 – 24 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 19.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
LimeFavourablePlant 3 Mar 2027 – 24 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 17.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PineappleFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 47.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 61.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
RoselleFavourablePlant 12 Mar 2027 – 1 May 2027 opens in 23 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 22 Mar 2027 – 18 Sep 2027
Pest/disease risk — manageableLate-maturing — drought risk -
Pigeon peaFavourablePlant 20 Feb 2027 – 1 Apr 2027 opens in 20 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 2 Mar 2027 – 21 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 22 Mar 2027 – 1 May 2027 opens in 25 weeks
matched to this season's forecast
about 34.5 t/ha expected
· about 50.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 2 Mar 2027 – 11 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 13.5 t/ha expected
Irrigated: plant 22 Mar 2027 – 29 Aug 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CassavaFavourablePlant 21 Feb 2027 – 13 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 25.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
RiceFavourablePlant 7 Apr 2027 – 10 May 2027 opens in 27 weeks
matched to this season's forecast
about 3.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 25 Mar 2027 – 27 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 15.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
SunflowerFavourablePlant 28 Mar 2027 – 20 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 2.6 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
BananaFavourablePlant 14 Mar 2027 – 16 Apr 2027 opens in 23 weeks
matched to this season's forecast
about 23.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 18.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
OnionFavourable
Plant 9 Apr 2027 – 15 May 2027 opens in 27 weeks
matched to this season's forecast
about 22.0 t/ha expected
Irrigated: plant 2 Mar 2026 – 17 Nov 2026 · about 33.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
YamFavourablePlant 22 Feb 2027 – 24 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 19.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
TurmericFavourablePlant 20 Feb 2027 – 1 Apr 2027 opens in 20 weeks
matched to this season's forecast
about 18.9 t/ha expected
· about 30.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CocoaFavourablePlant 4 Mar 2027 – 23 May 2027 opens in 22 weeks
matched to this season's forecast
about 0.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
CoconutFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.4 t/ha
Pest/disease risk — manageableNot enough water in season -
Sweet orangeFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 14.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
SugarcaneFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 49.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableNot enough water in season -
Oil palmFavourablePlant 25 Mar 2027 – 8 May 2027 opens in 25 weeks
matched to this season's forecast
about 8.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TaroFavourablePlant 20 Feb 2027 – 12 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 10.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
KaleFavourablePlant 1 Apr 2027 – 11 May 2027 opens in 26 weeks
matched to this season's forecast
about 18.1 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 32.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
LettuceModeratePlant 29 May 2027 – 26 Jun 2027 opens in 34 weeks
matched to this season's forecast
about 8.1 t/ha expected
Irrigated: plant 30 Jun 2027 – 20 Jul 2027 · about 12.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought
6% sub-humid, warm — 55 crops
-
GuavaFavourablePlant 4 Mar 2027 – 22 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MandarinFavourablePlant 4 Mar 2027 – 27 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
LimeFavourablePlant 4 Mar 2027 – 27 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MangoFavourablePlant 4 Mar 2027 – 22 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
CashewFavourablePlant 7 Mar 2027 – 11 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PapayaFavourablePlant 15 Mar 2027 – 28 Apr 2027 opens in 24 weeks
matched to this season's forecast
48.7–49.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 26 Mar 2027 – 20 May 2027 opens in 25 weeks
matched to this season's forecast
about 37.9 t/ha expected
Irrigated: plant 22 Mar 2026 – 28 Oct 2026 · about 70.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CarrotFavourablePlant 29 Mar 2027 – 28 May 2027 opens in 26 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 22 Mar 2026 – 28 Oct 2026 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 1 Apr 2027 – 18 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 29 Mar 2027 – 9 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026 · about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 4 May 2027 – 21 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 23.7 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 6 Jun 2027 – 6 Jul 2027 opens in 35 weeks
matched to this season's forecast
about 23.7 t/ha expected
· about 40.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 1 Apr 2027 – 23 May 2027 opens in 26 weeks
matched to this season's forecast
about 18.9 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 30.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 10 May 2027 – 18 Jun 2027 opens in 32 weeks
matched to this season's forecast
about 17.1 t/ha expected
Irrigated: plant 21 May 2027 – 18 Sep 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 23 Mar 2027 – 6 Jul 2027 opens in 25 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 2 Mar 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 7 Apr 2027 – 21 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 2 Mar 2026 – 1 Jan 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 2 May 2027 – 13 Jun 2027 opens in 30 weeks
matched to this season's forecast
about 9.5 t/ha expected
· about 15.0 t/ha
Early-maturing — escapes late drought -
MaizeFavourablePlant 15 Mar 2027 – 28 Apr 2027 opens in 24 weeks
matched to this season's forecast
about 6.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 10.0 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 17 Mar 2027 – 21 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 3.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 15 Mar 2027 – 9 May 2027 opens in 24 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 15 Mar 2027 – 31 May 2027 opens in 24 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 17 Mar 2027 – 28 May 2027 opens in 24 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Finger milletFavourablePlant 4 May 2027 – 21 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 2.8 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 19 Mar 2027 – 18 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 1 Apr 2027 – 5 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 26 Mar 2027 – 20 May 2027 opens in 25 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageableSoil pH below the crop's optimum -
LablabFavourablePlant 28 Apr 2027 – 22 Jun 2027 opens in 30 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 1 May 2027 – 9 Aug 2027
Pest/disease risk — manageable -
CowpeaFavourablePlant 1 Apr 2027 – 5 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
FonioFavourablePlant 19 Mar 2027 – 10 May 2027 opens in 24 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Green gramFavourablePlant 21 Mar 2027 – 13 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 26 Mar 2027 – 22 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 22 Mar 2026 – 8 Oct 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SesameFavourablePlant 5 Mar 2027 – 4 May 2027 opens in 22 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RiceFavourablePlant 17 Apr 2027 – 9 May 2027 opens in 28 weeks
matched to this season's forecast
about 4.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 7.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PineappleFavourablePlant 21 Feb 2027 – 13 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 45.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 61.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
BananaFavourablePlant 15 Mar 2027 – 17 Apr 2027 opens in 24 weeks
matched to this season's forecast
about 24.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageable -
GrapefruitFavourablePlant 21 Feb 2027 – 13 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 20.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MoringaFavourablePlant 26 Mar 2027 – 28 Apr 2027 opens in 25 weeks
matched to this season's forecast
about 16.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
Pigeon peaFavourablePlant 21 Feb 2027 – 12 May 2027 opens in 20 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
RoselleFavourablePlant 13 Mar 2027 – 12 May 2027 opens in 23 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 22 Mar 2027 – 18 Sep 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 13 Mar 2027 – 2 May 2027 opens in 23 weeks
matched to this season's forecast
about 33.2 t/ha expected
· about 50.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 21 Feb 2027 – 2 May 2027 opens in 20 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 3 Mar 2027 – 12 Apr 2027 opens in 22 weeks
matched to this season's forecast
about 13.2 t/ha expected
Irrigated: plant 22 Mar 2027 – 29 Aug 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CassavaFavourablePlant 21 Feb 2027 – 13 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 26.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
YamFavourablePlant 21 Feb 2027 – 23 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 21.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
SunflowerFavourablePlant 17 Mar 2027 – 21 Jun 2027 opens in 24 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 2.6 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OnionFavourable
Plant 29 Mar 2027 – 16 May 2027 opens in 26 weeks
matched to this season's forecast
about 21.3 t/ha expected
Irrigated: plant 2 Mar 2026 – 17 Nov 2026 · about 33.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CocoaFavourablePlant 13 Mar 2027 – 1 Jun 2027 opens in 23 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
CoconutFavourablePlant 21 Feb 2027 – 13 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 1.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.4 t/ha
Pest/disease risk — manageableNot enough water in season -
SugarcaneFavourablePlant 21 Feb 2027 – 13 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 54.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableNot enough water in season -
TurmericFavourablePlant 21 Feb 2027 – 12 Apr 2027 opens in 20 weeks
matched to this season's forecast
about 18.6 t/ha expected
· about 30.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
Sweet orangeFavourablePlant 21 Feb 2027 – 13 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 14.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Oil palmFavourablePlant 26 Mar 2027 – 9 May 2027 opens in 25 weeks
matched to this season's forecast
about 8.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TaroFavourablePlant 21 Feb 2027 – 13 Mar 2027 opens in 20 weeks
matched to this season's forecast
about 11.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 30.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
KaleFavourablePlant 2 Apr 2027 – 12 May 2027 opens in 26 weeks
matched to this season's forecast
about 16.6 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 32.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
LettuceModeratePlant 6 Jun 2027 – 21 Jun 2027 opens in 35 weeks
matched to this season's forecast
about 7.3 t/ha expected
Irrigated: plant 30 Jun 2027 – 20 Jul 2027 · about 12.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What grows in Shai Osudoku with irrigation
These need water applied — rain alone will not carry them here. The dates are the windows their own water supply allows.
What Divisi would not plant in Shai Osudoku
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Robusta coffee Moderate
- Avocado Unsuitable — Temperature
- Beetroot Unsuitable — Temperature
- Cabbage Unsuitable — Temperature
- Chickpea Unsuitable — Temperature
- Arabica coffee Unsuitable — Temperature
- Enset Unsuitable — Temperature
- Garlic Unsuitable — Temperature
- Ginger Unsuitable — Temperature
- Irish potato Unsuitable
- Lemon Unsuitable — Temperature
- Niger seed Unsuitable — Temperature
- Passion fruit Unsuitable — Temperature
- Sweet pepper Unsuitable — Temperature
- Sweet potato Unsuitable — Temperature
- Swiss chard Unsuitable — Temperature
- Tea Unsuitable — Temperature
- Teff Unsuitable — Temperature
- Wheat Unsuitable — Temperature
Divisi scored 74 crops against this district's own ground; 19 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Shai Osudoku, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Shai Osudoku
- 31 August 2026 Banana Plantain — Suitability class changed, now rates Favourable
- 31 August 2026 Sesame — Limiting factor changed, now held back mostly by Temperature
- 31 August 2026 Lime — Planting window moved, now opens 1 Apr 2027
- 31 August 2026 Chickpea — Suitability class changed, now rates Favourable
- 31 August 2026 Teff — Suitability class changed, now rates Favourable
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Where to sell it nearby
-
Konkomba Yam Market
67 km · Yam, Maize, Cowpea, Groundnut
-
Marché Dantokpa
255 km · Maize, Cassava, Yam, Cowpea
Support and extension
- GIRSAL Agricultural Credit Guarantee Scheme
- Planting for Food and Jobs Phase II
- CSIR-Crops Research Institute
- National Seed Council
Frequently asked questions
What crops grow well in Shai Osudoku?
African eggplant, African nightshade, Amaranth, Bambara groundnut, Banana all rate well in Shai Osudoku — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant African eggplant in Shai Osudoku?
In Shai Osudoku the window for African eggplant runs 28 Mar 2027 to 15 May 2027.
Is there a farming app that works in Shai Osudoku?
Divisi does. It reads Shai Osudoku's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?
No — these are readings taken across Shai Osudoku, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.