What grows in South Dayi
Volta, Ghana
The 2026 season in South Dayi
| When the rains are expected | February 2026 to December 2026 |
|---|---|
| Rain in a typical year | About 1,117 mm |
| This season's rain | Leaning dry — September and October look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +0.9 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for a long crop, or two in a year, warm all year, so nothing but rain ends the season |
| Ground this covers | 3 kinds of ground. The season below is the largest that farms — about 62% of this area. |
| 62% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 313 growing days · about 1,160 mm · February to December |
|---|---|
| 32% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 277 growing days · about 1,100 mm · February to November |
| 6% | enough rain for a long crop, or two in a year; warm all year, so nothing but rain ends the season 314 growing days · about 1,100 mm · February to December |
last updated 30 September 2026
What grows in South Dayi
62% lowland, humid, warm, rain year-round — 57 crops
-
CashewFavourablePlant 15 Mar 2026 – 9 Oct 2026 open now
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
Jute mallowFavourablePlant 15 Mar 2026 – 22 Oct 2026 open now
matched to this season's forecast
about 8.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
OkraFavourablePlant 20 Apr 2027 – 27 Jun 2027 opens in 29 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 28 Mar 2027 – 9 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PineappleFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 50.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
GuavaFavourablePlant 9 Mar 2027 – 12 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MandarinFavourablePlant 9 Mar 2027 – 7 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
LimeFavourablePlant 9 Mar 2027 – 7 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 24 Feb 2027 – 25 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
PapayaFavourablePlant 22 Mar 2027 – 26 May 2027 opens in 25 weeks
matched to this season's forecast
48.8–49.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 69.3 t/ha
Pest/disease risk — manageable -
BananaFavourablePlant 22 Mar 2027 – 13 May 2027 opens in 25 weeks
matched to this season's forecast
about 27.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageable -
TomatoFavourablePlant 2 Apr 2027 – 15 Jul 2027 opens in 26 weeks
matched to this season's forecast
about 35.8 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 66.3 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
CarrotFavourablePlant 6 Apr 2027 – 13 Jul 2027 opens in 27 weeks
matched to this season's forecast
about 31.3 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 47.4 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
WatermelonFavourablePlant 26 Mar 2027 – 22 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 31.3 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 47.4 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
African eggplantFavourablePlant 23 Mar 2027 – 24 Aug 2027 opens in 25 weeks
matched to this season's forecast
about 22.4 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 33.2 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
PumpkinFavourablePlant 6 Apr 2027 – 7 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 22.4 t/ha expected
Irrigated: plant 22 Mar 2027 – 18 Sep 2027 · about 33.2 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
CucumberFavourablePlant 22 May 2027 – 15 Aug 2027 opens in 33 weeks
matched to this season's forecast
about 22.4 t/ha expected
· about 37.9 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
AmaranthFavourablePlant 10 Apr 2027 – 7 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 17.9 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 28.4 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 25 Apr 2027 – 22 Sep 2027 opens in 29 weeks
matched to this season's forecast
about 16.1 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 23.7 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
Spider plantFavourablePlant 14 Apr 2027 – 21 Sep 2027 opens in 28 weeks
matched to this season's forecast
about 8.9 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 14.2 t/ha
No soil data for this spotEarly-maturing — escapes late drought -
MaizeFavourablePlant 20 Mar 2027 – 15 Jul 2027 opens in 24 weeks
matched to this season's forecast
about 6.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.5 t/ha
Pest/disease risk — manageableNo soil data for this spot -
SorghumFavourablePlant 23 Mar 2027 – 7 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 3.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.7 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
GroundnutFavourablePlant 7 Mar 2027 – 10 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 2.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
SoybeanFavourablePlant 20 Mar 2027 – 10 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 2.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
TobaccoFavourablePlant 23 Mar 2027 – 7 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 2.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
Finger milletFavourablePlant 20 Apr 2027 – 13 Jul 2027 opens in 29 weeks
matched to this season's forecast
about 2.7 t/ha expected
Irrigated: plant 11 Apr 2027 – 20 Jul 2027
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 11 Mar 2027 – 22 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
Common beanFavourablePlant 26 Mar 2027 – 22 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.8 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 20 Mar 2027 – 5 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026
Pest/disease risk — manageableNo soil data for this spot -
LablabFavourablePlant 20 Mar 2027 – 23 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 1.8 t/ha expected
Pest/disease risk — manageableNo soil data for this spot -
FonioFavourablePlant 11 Mar 2027 – 22 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 1.3 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
Green gramFavourablePlant 29 Mar 2027 – 21 Sep 2027 opens in 26 weeks
matched to this season's forecast
about 1.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 7 Mar 2027 – 18 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
SesameFavourablePlant 9 Mar 2027 – 27 Jul 2027 opens in 23 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
CocoaFavourablePlant 27 Mar 2027 – 12 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 1.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
MoringaFavourablePlant 4 Apr 2027 – 30 Apr 2027 opens in 26 weeks
matched to this season's forecast
about 16.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
RiceFavourablePlant 28 Apr 2027 – 6 Jun 2027 opens in 30 weeks
matched to this season's forecast
about 4.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.6 t/ha
Pest/disease risk — manageableNo soil data for this spotEarly-maturing — escapes late drought -
Pigeon peaFavourablePlant 11 Feb 2027 – 22 May 2027 opens in 19 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 17 Mar 2027 – 15 Jul 2027 opens in 24 weeks
matched to this season's forecast
about 31.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableNo soil data for this spotLate-maturing — drought risk -
TurmericFavourablePlant 9 Feb 2027 – 10 May 2027 opens in 19 weeks
matched to this season's forecast
about 22.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableNo soil data for this spotLate-maturing — drought risk -
ChilliFavourablePlant 1 Mar 2027 – 29 Jun 2027 opens in 22 weeks
matched to this season's forecast
about 13.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableNo soil data for this spotLate-maturing — drought risk -
CottonFavourablePlant 19 Feb 2027 – 9 Jul 2027 opens in 20 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableNo soil data for this spotLate-maturing — drought risk -
RoselleFavourablePlant 5 Mar 2027 – 27 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableNo soil data for this spotLate-maturing — drought risk -
YamFavourablePlant 19 Feb 2027 – 10 May 2027 opens in 20 weeks
matched to this season's forecast
about 22.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableNo soil data for this spotLate-maturing — drought risk -
GrapefruitFavourablePlant 3 Feb 2027 – 23 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 18.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSteep slope -
Oil palmFavourablePlant 4 Apr 2027 – 21 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 10.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CoconutFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableNot enough water in season -
OnionFavourable
Plant 8 Apr 2027 – 3 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 21.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SunflowerFavourablePlant 25 Mar 2027 – 9 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SugarcaneFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 56.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableNot enough water in season -
Robusta coffeeFavourablePlant 7 Feb 2027 – 29 Mar 2027 opens in 18 weeks
matched to this season's forecast
1.3–1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableSteep slope -
CassavaFavourablePlant 3 Feb 2027 – 23 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 21.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.6 t/ha
Pest/disease risk — manageableSteep slopeLate-maturing — drought risk -
TaroFavourablePlant 11 Feb 2027 – 3 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 13.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 29.7 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
KaleFavourablePlant 22 Apr 2027 – 3 Jul 2027 opens in 29 weeks
matched to this season's forecast
about 22.5 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 34.4 t/ha
Pest/disease risk — manageableNo soil data for this spotLate-maturing — drought risk -
Sweet orangeFavourablePlant 11 Feb 2027 – 12 Apr 2027 opens in 19 weeks
matched to this season's forecast
about 14.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
GingerFavourablePlant 10 Apr 2027 – 30 Apr 2027 opens in 27 weeks
based on the rains it usually gets
about 12.8 t/ha expected
Irrigated: plant 1 May 2027 – 10 Jun 2027 · about 28.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
LettuceModeratePlant 10 Jun 2027 – 14 Jul 2027 opens in 36 weeks
matched to this season's forecast
about 9.1 t/ha expected
Irrigated: plant 30 Jun 2027 – 20 Jul 2027 · about 13.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought
32% lowland, humid, warm, one season — 56 crops
-
CashewFavourablePlant 15 Mar 2026 – 9 Oct 2026 open now
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
TomatoFavourablePlant 5 Apr 2027 – 27 May 2027 opens in 27 weeks
matched to this season's forecast
about 40.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 66.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CarrotFavourablePlant 9 Apr 2027 – 18 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 47.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 29 Mar 2027 – 10 Sep 2027 opens in 26 weeks
matched to this season's forecast
about 35.0 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 47.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 9 Apr 2027 – 18 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 33.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GuavaFavourablePlant 10 Mar 2027 – 31 Jul 2027 opens in 23 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
PumpkinFavourablePlant 9 Apr 2027 – 13 Aug 2027 opens in 27 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 22 Mar 2027 – 18 Sep 2027 · about 33.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 11 Jun 2027 – 15 Jul 2027 opens in 36 weeks
matched to this season's forecast
about 25.0 t/ha expected
· about 37.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MandarinFavourablePlant 10 Mar 2027 – 8 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
AmaranthFavourablePlant 13 Apr 2027 – 12 Jun 2027 opens in 28 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 28.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 28 Apr 2027 – 27 Jun 2027 opens in 30 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 23.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LimeFavourablePlant 10 Mar 2027 – 8 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
MangoFavourablePlant 25 Feb 2027 – 13 Aug 2027 opens in 21 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
Jute mallowFavourablePlant 4 Apr 2027 – 21 Sep 2027 opens in 26 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 21 Apr 2027 – 28 Jun 2027 opens in 29 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 3 May 2027 – 20 Jun 2027 opens in 31 weeks
matched to this season's forecast
about 10.0 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 14.2 t/ha
Early-maturing — escapes late drought -
MaizeFavourablePlant 23 Mar 2027 – 14 May 2027 opens in 25 weeks
matched to this season's forecast
about 7.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.5 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 26 Mar 2027 – 27 Aug 2027 opens in 25 weeks
matched to this season's forecast
about 4.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 10 Mar 2027 – 27 May 2027 opens in 23 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 23 Mar 2027 – 9 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 26 Mar 2027 – 4 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 23 Apr 2027 – 16 Jul 2027 opens in 29 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 11 Apr 2027 – 20 Jul 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 13 Apr 2027 – 12 Jun 2027 opens in 28 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 23 Mar 2027 – 9 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026
Pest/disease risk — manageable -
LablabFavourablePlant 5 Apr 2027 – 13 Aug 2027 opens in 27 weeks
matched to this season's forecast
about 2.0 t/ha expected
Pest/disease risk — manageable -
CowpeaFavourablePlant 13 Apr 2027 – 27 Jun 2027 opens in 28 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
FonioFavourablePlant 29 Mar 2027 – 12 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 1 Apr 2027 – 8 Sep 2027 opens in 26 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 23 Mar 2027 – 26 Aug 2027 opens in 25 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SesameFavourablePlant 12 Mar 2027 – 21 May 2027 opens in 23 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 14 Mar 2027 – 10 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PapayaFavourablePlant 23 Mar 2027 – 14 May 2027 opens in 25 weeks
matched to this season's forecast
about 48.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 69.3 t/ha
Pest/disease risk — manageable -
PineappleFavourablePlant 12 Feb 2027 – 4 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 50.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
BananaFavourablePlant 23 Mar 2027 – 14 May 2027 opens in 25 weeks
matched to this season's forecast
about 26.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageable -
RiceFavourablePlant 18 Apr 2027 – 27 May 2027 opens in 28 weeks
matched to this season's forecast
about 4.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.6 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RoselleFavourablePlant 8 Mar 2027 – 31 May 2027 opens in 23 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
CottonFavourablePlant 22 Feb 2027 – 23 May 2027 opens in 21 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 20 Mar 2027 – 19 May 2027 opens in 24 weeks
matched to this season's forecast
about 34.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Pigeon peaFavourablePlant 12 Feb 2027 – 13 May 2027 opens in 19 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 14 Mar 2027 – 13 May 2027 opens in 23 weeks
matched to this season's forecast
about 13.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
YamFavourablePlant 22 Feb 2027 – 23 Apr 2027 opens in 21 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
TurmericFavourablePlant 12 Feb 2027 – 13 Apr 2027 opens in 19 weeks
matched to this season's forecast
about 22.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 12 Feb 2027 – 4 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 24.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CocoaFavourablePlant 28 Mar 2027 – 2 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
MoringaFavourablePlant 5 Apr 2027 – 1 May 2027 opens in 27 weeks
matched to this season's forecast
about 15.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
GrapefruitFavourablePlant 12 Feb 2027 – 4 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 19.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageable -
SunflowerFavourablePlant 26 Mar 2027 – 27 Aug 2027 opens in 25 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OnionFavourable
Plant 9 Apr 2027 – 4 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 22.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Oil palmFavourablePlant 5 Apr 2027 – 9 Jun 2027 opens in 27 weeks
matched to this season's forecast
about 9.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CoconutFavourablePlant 12 Feb 2027 – 4 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageableNot enough water in season -
SugarcaneFavourablePlant 12 Feb 2027 – 4 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 55.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableNot enough water in season -
TaroFavourablePlant 12 Feb 2027 – 4 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 12.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 29.7 t/ha
Pest/disease risk — manageableNot enough water in seasonLate-maturing — drought risk -
KaleFavourablePlant 13 Apr 2027 – 12 Jun 2027 opens in 28 weeks
matched to this season's forecast
about 21.6 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 34.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Sweet orangeFavourablePlant 12 Feb 2027 – 13 Apr 2027 opens in 19 weeks
matched to this season's forecast
about 14.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
Robusta coffeeFavourablePlant 12 Feb 2027 – 24 Mar 2027 opens in 19 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageable -
LettuceModeratePlant 11 Jun 2027 – 15 Jul 2027 opens in 36 weeks
matched to this season's forecast
about 8.8 t/ha expected
Irrigated: plant 30 Jun 2027 – 20 Jul 2027 · about 13.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought
6% humid, warm — 58 crops
-
CashewFavourablePlant 10 Mar 2026 – 4 Oct 2026 open now
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageable -
CucumberFavourablePlant 2 May 2026 – 2 Oct 2026 open now
matched to this season's forecast
about 23.7 t/ha expected
· about 37.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
BananaFavourablePlant 6 Mar 2027 – 24 Jul 2027 opens in 22 weeks
matched to this season's forecast
about 30.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 60.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
GuavaFavourablePlant 20 Feb 2027 – 4 Sep 2027 opens in 20 weeks
matched to this season's forecast
about 25.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
MandarinFavourablePlant 20 Feb 2027 – 18 Sep 2027 opens in 20 weeks
matched to this season's forecast
about 20.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
LimeFavourablePlant 20 Feb 2027 – 18 Sep 2027 opens in 20 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
MangoFavourablePlant 20 Feb 2027 – 4 Sep 2027 opens in 20 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
CocoaFavourablePlant 2 Apr 2027 – 18 Jun 2027 opens in 26 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PapayaFavourablePlant 6 Mar 2027 – 7 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 49.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 69.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
PineappleFavourablePlant 6 Feb 2027 – 26 Feb 2027 opens in 18 weeks
matched to this season's forecast
52.5–53.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 70.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
TomatoFavourablePlant 3 Apr 2027 – 21 Aug 2027 opens in 26 weeks
matched to this season's forecast
about 37.9 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 66.3 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
CarrotFavourablePlant 3 Apr 2027 – 4 Sep 2027 opens in 26 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
WatermelonFavourablePlant 8 Mar 2027 – 19 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
African eggplantFavourablePlant 20 Mar 2027 – 4 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 33.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
PumpkinFavourablePlant 8 Mar 2027 – 4 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 22 Mar 2027 – 18 Sep 2027 · about 33.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
AmaranthFavourablePlant 7 Apr 2027 – 4 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 18.9 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026 · about 28.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 7 Apr 2027 – 19 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 17.1 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 23.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 14 Mar 2027 – 28 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 29 Mar 2027 – 15 Sep 2027 opens in 26 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 14.2 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Spider plantFavourablePlant 11 Apr 2027 – 18 Sep 2027 opens in 27 weeks
matched to this season's forecast
about 9.5 t/ha expected
Irrigated: plant 11 Apr 2026 – 8 Oct 2026 · about 14.2 t/ha
Soil pH below the crop's optimumEarly-maturing — escapes late drought -
MaizeFavourablePlant 4 Mar 2027 – 7 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 6.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.5 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 6 Mar 2027 – 4 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 3.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 4.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
GroundnutFavourablePlant 6 Mar 2027 – 7 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 6 Mar 2027 – 21 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
TobaccoFavourablePlant 8 Mar 2027 – 20 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Finger milletFavourablePlant 20 Mar 2027 – 21 Aug 2027 opens in 24 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 11 Apr 2027 – 20 Jul 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 8 Mar 2027 – 19 Sep 2027 opens in 23 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.3 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 23 Mar 2027 – 4 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 17 Mar 2027 – 2 Sep 2027 opens in 24 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026
Pest/disease risk — manageable -
LablabFavourablePlant 4 Mar 2027 – 15 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.9 t/ha expected
Pest/disease risk — manageable -
CowpeaFavourablePlant 23 Mar 2027 – 19 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
FonioFavourablePlant 8 Mar 2027 – 20 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 26 Mar 2027 – 18 Sep 2027 opens in 25 weeks
matched to this season's forecast
about 1.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 1.9 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 6 Mar 2027 – 4 Sep 2027 opens in 22 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 10 Feb 2026 – 7 Dec 2026
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
SesameFavourablePlant 20 Feb 2027 – 24 Jul 2027 opens in 20 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 3 Apr 2027 – 1 May 2027 opens in 26 weeks
matched to this season's forecast
about 17.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
RiceFavourablePlant 17 Apr 2027 – 12 Jun 2027 opens in 28 weeks
matched to this season's forecast
about 4.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 6.6 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SunflowerFavourablePlant 15 May 2027 – 7 Aug 2027 opens in 32 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Robusta coffeeFavourablePlant 6 Feb 2027 – 28 Mar 2027 opens in 18 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 2.4 t/ha
Pest/disease risk — manageable -
Oil palmFavourablePlant 3 Apr 2027 – 24 Jul 2027 opens in 26 weeks
matched to this season's forecast
about 12.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 20.8 t/ha
Pest/disease risk — manageable -
OnionFavourable
Plant 7 May 2027 – 5 Aug 2027 opens in 31 weeks
matched to this season's forecast
about 24.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.0 t/ha
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (lime) -
GrapefruitFavourablePlant 6 Feb 2027 – 26 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 20.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 40.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
Pigeon peaFavourablePlant 6 Feb 2027 – 16 Jun 2027 opens in 18 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 14 Mar 2027 – 5 Aug 2027 opens in 23 weeks
matched to this season's forecast
about 33.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 47.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
ChilliFavourablePlant 26 Feb 2027 – 16 Jul 2027 opens in 21 weeks
matched to this season's forecast
about 14.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
CottonFavourablePlant 16 Feb 2027 – 26 Jul 2027 opens in 20 weeks
matched to this season's forecast
about 2.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
RoselleFavourablePlant 2 Mar 2027 – 5 Aug 2027 opens in 22 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageableLate-maturing — drought risk -
YamFavourablePlant 6 Feb 2027 – 17 May 2027 opens in 18 weeks
matched to this season's forecast
about 23.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
TurmericFavourablePlant 6 Feb 2027 – 7 May 2027 opens in 18 weeks
matched to this season's forecast
about 22.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 28.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CassavaFavourablePlant 6 Feb 2027 – 26 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 25.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 34.6 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
CoconutFavourablePlant 6 Feb 2027 – 26 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 1.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.5 t/ha
Pest/disease risk — manageable -
SugarcaneFavourablePlant 6 Feb 2027 – 26 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 62.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 120.0 t/ha
Pest/disease risk — manageableNot enough water in seasonSoil pH below the crop's optimum -
Sweet orangeFavourablePlant 6 Feb 2027 – 17 Apr 2027 opens in 18 weeks
matched to this season's forecast
about 16.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
KaleFavourablePlant 19 Apr 2027 – 12 Jul 2027 opens in 29 weeks
matched to this season's forecast
about 27.6 t/ha expected
Irrigated: plant 1 May 2027 – 20 Jul 2027 · about 34.4 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
TaroFavourablePlant 6 Feb 2027 – 26 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 14.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 29.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
GingerFavourablePlant 18 Mar 2027 – 7 Apr 2027 opens in 24 weeks
matched to this season's forecast
about 17.5 t/ha expected
Irrigated: plant 1 May 2027 – 10 Jun 2027 · about 28.4 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk -
LettuceFavourablePlant 22 Jun 2027 – 26 Jul 2027 opens in 38 weeks
matched to this season's forecast
about 11.8 t/ha expected
Irrigated: plant 30 Jun 2027 – 20 Jul 2027 · about 13.8 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought -
Swiss chardFavourablePlant 4 Jun 2027 – 10 Jul 2027 opens in 35 weeks
based on the rains it usually gets
about 20.7 t/ha expected
Irrigated: plant 1 Jan 2027 – 31 Aug 2027
Pest/disease risk — manageableSoil pH below the crop's optimumLate-maturing — drought risk
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What Divisi would not plant in South Dayi
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Avocado Unsuitable — Temperature
- Beetroot Unsuitable — Temperature
- Cabbage Unsuitable — Temperature
- Chickpea Unsuitable — Temperature
- Arabica coffee Unsuitable — Temperature
- Enset Unsuitable — Temperature
- Garlic Unsuitable — Temperature
- Irish potato Unsuitable
- Lemon Unsuitable — Temperature
- Niger seed Unsuitable — Temperature
- Passion fruit Unsuitable — Temperature
- Sweet pepper Unsuitable — Temperature
- Sweet potato Unsuitable — Temperature
- Tea Unsuitable — Temperature
- Teff Unsuitable — Temperature
- Wheat Unsuitable — Temperature
Divisi scored 74 crops against this district's own ground; 16 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across South Dayi, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in South Dayi
- 2 September 2026 Lime — Limiting factor changed, now held back mostly by Frost & pests
- 2 September 2026 Lime — Suitability class changed, now rates Favourable
- 2 September 2026 Lime — Planting window moved, now opens 10 Jul 2026
- 2 September 2026 Banana Plantain — Limiting factor changed, now held back mostly by Frost & pests
- 2 September 2026 Banana Plantain — Suitability class changed, now rates Favourable
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Where to sell it nearby
-
Konkomba Yam Market
126 km · Yam, Maize, Cowpea, Groundnut
-
Marché Dantokpa
249 km · Maize, Cassava, Yam, Cowpea
Support and extension
- GIRSAL Agricultural Credit Guarantee Scheme
- Planting for Food and Jobs Phase II
- CSIR-Crops Research Institute
- National Seed Council
Frequently asked questions
What crops grow well in South Dayi?
Cashew, Jute mallow, African eggplant, African nightshade, Amaranth all rate well in South Dayi — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant Cashew in South Dayi?
In South Dayi the window for Cashew runs 15 Mar 2026 to 9 Oct 2026.
Is there a farming app that works in South Dayi?
Divisi does. It reads South Dayi's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?
No — these are readings taken across South Dayi, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.