What grows in Chilanga
Lusaka, Zambia
The 2026/27 season in Chilanga
| Rainy seasons | One each year — one chance to plant, so timing carries it |
|---|---|
| When the rains are expected | November 2026 to April 2027 |
| Rain in a typical year | About 805 mm |
| This season's rain | Leaning dry — January, February and December look short of rain. Plant at the early end of the window, favour quicker and more drought-tolerant crops, and keep moisture in the soil: mulch, and weed early. |
| This season's heat | Hotter than usual — about +1.6 °C over the growing months. Heat makes the same rain do less, so a dry spell bites sooner: do not plant late, and shade or mulch what you can. |
| What that supports | enough rain for one short crop, and only if timed to it, warm all year, so nothing but rain ends the season |
| Ground this covers | 2 kinds of ground. The season below is the largest that farms — about 96% of this area. |
| 96% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 177 growing days · about 810 mm · November to April |
|---|---|
| 4% | enough rain for one short crop, and only if timed to it; warm all year, so nothing but rain ends the season 178 growing days · about 830 mm · November to April |
last updated 16 September 2026
What grows in Chilanga
96% lowland, semi-arid, warm — 49 crops
-
MangoFavourablePlant 17 Oct 2026 – 5 Jan 2027 opens in 2 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
Finger milletFavourablePlant 17 Oct 2026 – 26 Nov 2026 opens in 2 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 1 May 2026 – 21 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 17 Oct 2026 – 26 Nov 2026 opens in 2 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 30 Jun 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LablabFavourablePlant 17 Oct 2026 – 16 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
MaizeFavourablePlant 17 Oct 2026 – 6 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 6.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.3 t/ha
Pest/disease risk — manageable -
SesameFavourablePlant 17 Oct 2026 – 6 Nov 2026 opens in 2 weeks
matched to this season's forecast
1.0–1.1 t/ha expected
Irrigated: plant 9 Aug 2026 – 28 Oct 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SorghumFavourablePlant 17 Oct 2026 – 16 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 3.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 17 Oct 2026 – 6 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 11 Apr 2026 – 2 Mar 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 17 Oct 2026 – 16 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 29 Aug 2026 – 27 Dec 2026 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WatermelonFavourablePlant 27 Oct 2026 – 25 Jan 2027 opens in 4 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 9 Aug 2026 – 2 Mar 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SunflowerFavourablePlant 27 Oct 2026 – 5 Jan 2027 opens in 4 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 8 Oct 2026 – 9 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 27 Oct 2026 – 6 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027
Pest/disease risk — manageable -
FonioFavourablePlant 27 Oct 2026 – 6 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 27 Oct 2026 – 26 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 29 Aug 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 27 Oct 2026 – 26 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 29 Aug 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 27 Oct 2026 – 15 Jan 2027 opens in 4 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 27 Oct 2026 – 6 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 22.7 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TomatoFavourablePlant 27 Oct 2026 – 6 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 35.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PapayaFavourablePlant 27 Oct 2026 – 6 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 44.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageable -
CowpeaFavourablePlant 27 Oct 2026 – 5 Jan 2027 opens in 4 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 29 Aug 2026 – 21 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CarrotFavourablePlant 6 Nov 2026 – 5 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 6 Nov 2026 – 15 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 9 Aug 2026 – 2 Mar 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 6 Nov 2026 – 15 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 6 Nov 2026 – 25 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 6 Nov 2026 – 14 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 20 Jul 2026 – 22 Mar 2027 · about 13.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Passion fruitFavourablePlant 6 Nov 2026 – 15 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 18.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 6 Nov 2026 – 16 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 17.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 6 Nov 2026 – 26 Nov 2026 opens in 5 weeks
matched to this season's forecast
about 17.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
OnionFavourable
Plant 6 Nov 2026 – 26 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 28 Oct 2026 – 9 Aug 2027 · about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 16 Nov 2026 – 14 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 16 Nov 2026 – 25 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 30 Jun 2026 – 1 May 2027 · about 13.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Sweet potatoFavourablePlant 6 Dec 2026 – 26 Dec 2026 opens in 10 weeks
matched to this season's forecast
about 23.1 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Irish potatoFavourablePlant 6 Dec 2026 – 15 Jan 2027 opens in 10 weeks
matched to this season's forecast
about 32.4 t/ha expected
· about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Niger seedFavourablePlant 26 Dec 2026 – 15 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 1.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
BeetrootFavourablePlant 4 Feb 2027 – 14 Feb 2027 opens in 18 weeks
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 2 Mar 2027 – 30 Jun 2027 · about 37.1 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RoselleFavourablePlant 17 Oct 2026 – 16 Nov 2026 opens in 2 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 20 Jul 2026 – 7 Dec 2026
Pest/disease risk — manageableLate-maturing — drought risk -
Pigeon peaFavourablePlant 17 Oct 2026 – 27 Oct 2026 opens in 2 weeks
matched to this season's forecast
about 1.7 t/ha expected
Irrigated: plant 9 Aug 2026 – 8 Oct 2026
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 17 Oct 2026 – 16 Nov 2026 opens in 2 weeks
matched to this season's forecast
about 12.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 27 Oct 2026 – 6 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 31.1 t/ha expected
Irrigated: plant 10 Jun 2026 – 10 Feb 2027 · about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
KaleFavourablePlant 6 Nov 2026 – 6 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 30.4 t/ha expected
Irrigated: plant 28 Oct 2026 – 9 Aug 2027 · about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Swiss chardFavourablePlant 16 Nov 2026 – 6 Dec 2026 opens in 7 weeks
matched to this season's forecast
about 30.5 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Sweet pepperFavourablePlant 6 Dec 2026 – 26 Dec 2026 opens in 10 weeks
matched to this season's forecast
about 22.5 t/ha expected
Irrigated: plant 27 Dec 2026 – 1 May 2027 · about 37.1 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
GroundnutFavourablePlant 17 Oct 2026 – 6 Nov 2026 opens in 2 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 9 Aug 2026 – 28 Oct 2026 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CashewFavourablePlant 27 Oct 2026 – 14 Feb 2027 opens in 4 weeks
matched to this season's forecast
about 1.0 t/ha expected
Irrigated: plant 22 Mar 2026 – 2 Mar 2027
Pest/disease risk — manageableSoil pH below the crop's optimum -
GuavaFavourablePlant 27 Oct 2026 – 26 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 17.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
RiceFavourablePlant 6 Nov 2026 – 6 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 3.8 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 6.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LettuceFavourablePlant 26 Dec 2026 – 14 Feb 2027 opens in 12 weeks
matched to this season's forecast
about 17.7 t/ha expected
Irrigated: plant 22 Mar 2027 – 20 Jul 2027 · about 32.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WheatFavourablePlant 26 Dec 2026 – 5 Jan 2027 opens in 12 weeks
matched to this season's forecast
about 3.2 t/ha expected
Irrigated: plant 2 Mar 2027 – 30 Jun 2027 · about 6.5 t/ha
Pest/disease risk — manageable -
CottonFavourablePlant 17 Oct 2026 – 27 Oct 2026 opens in 2 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 20 Jul 2026 – 28 Oct 2026 · about 3.7 t/ha
Pest/disease risk — manageableLate-maturing — drought risk
4% semi-arid, warm — 48 crops
-
Finger milletFavourablePlant 17 Oct 2026 – 6 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 3.0 t/ha expected
Irrigated: plant 1 May 2026 – 21 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Pearl milletFavourablePlant 17 Oct 2026 – 16 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 2.5 t/ha expected
Irrigated: plant 29 Aug 2026 – 27 Dec 2026 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Bambara groundnutFavourablePlant 17 Oct 2026 – 16 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027
Pest/disease risk — manageable -
LablabFavourablePlant 17 Oct 2026 – 26 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 2.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027
Pest/disease risk — manageable -
FonioFavourablePlant 17 Oct 2026 – 6 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MangoFavourablePlant 17 Oct 2026 – 25 Jan 2027 opens in 2 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 25.0 t/ha
Pest/disease risk — manageable -
MaizeFavourablePlant 17 Oct 2026 – 26 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 6.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 9.3 t/ha
Pest/disease risk — manageable -
SorghumFavourablePlant 17 Oct 2026 – 26 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 3.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 5.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SoybeanFavourablePlant 17 Oct 2026 – 6 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 30 Jun 2026 – 1 Jan 2027 · about 4.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TobaccoFavourablePlant 17 Oct 2026 – 16 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 2.8 t/ha expected
Irrigated: plant 11 Apr 2026 – 2 Mar 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CowpeaFavourablePlant 27 Oct 2026 – 15 Jan 2027 opens in 4 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 29 Aug 2026 – 21 Jan 2027 · about 2.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Green gramFavourablePlant 27 Oct 2026 – 5 Jan 2027 opens in 4 weeks
matched to this season's forecast
about 1.5 t/ha expected
Irrigated: plant 29 Aug 2026 – 1 Jan 2027 · about 2.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PapayaFavourablePlant 27 Oct 2026 – 16 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 46.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageable -
WatermelonFavourablePlant 27 Oct 2026 – 14 Feb 2027 opens in 4 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 9 Aug 2026 – 2 Mar 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
PumpkinFavourablePlant 27 Oct 2026 – 4 Feb 2027 opens in 4 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Common beanFavourablePlant 27 Oct 2026 – 25 Jan 2027 opens in 4 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 3.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
SunflowerFavourablePlant 27 Oct 2026 – 25 Jan 2027 opens in 4 weeks
matched to this season's forecast
about 2.3 t/ha expected
Irrigated: plant 8 Oct 2026 – 9 Aug 2027 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African eggplantFavourablePlant 27 Oct 2026 – 16 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 23.1 t/ha expected
Irrigated: plant 9 Aug 2026 – 1 Jan 2027 · about 32.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TomatoFavourablePlant 27 Oct 2026 – 16 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 36.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 64.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
MoringaFavourablePlant 6 Nov 2026 – 6 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 18.8 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimum -
CarrotFavourablePlant 6 Nov 2026 – 15 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 32.4 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 50.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OnionFavourable
Plant 6 Nov 2026 – 5 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 28 Oct 2026 – 9 Aug 2027 · about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
African nightshadeFavourablePlant 6 Nov 2026 – 4 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 16.7 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Jute mallowFavourablePlant 6 Nov 2026 – 24 Feb 2027 opens in 5 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 20 Jul 2026 – 22 Mar 2027 · about 13.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
OkraFavourablePlant 6 Nov 2026 – 15 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 9 Aug 2026 – 2 Mar 2027 · about 15.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
AmaranthFavourablePlant 6 Nov 2026 – 16 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 18.5 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.8 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Passion fruitFavourablePlant 6 Nov 2026 – 25 Jan 2027 opens in 5 weeks
matched to this season's forecast
about 18.0 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 27.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Niger seedFavourablePlant 16 Nov 2026 – 25 Jan 2027 opens in 7 weeks
matched to this season's forecast
about 1.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
CucumberFavourablePlant 16 Nov 2026 – 14 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 23.2 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 37.1 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Spider plantFavourablePlant 16 Nov 2026 – 4 Feb 2027 opens in 7 weeks
matched to this season's forecast
about 9.3 t/ha expected
Irrigated: plant 30 Jun 2026 – 1 May 2027 · about 13.9 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Irish potatoFavourablePlant 26 Nov 2026 – 25 Jan 2027 opens in 8 weeks
matched to this season's forecast
about 32.4 t/ha expected
· about 41.7 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Sweet potatoFavourablePlant 26 Nov 2026 – 26 Dec 2026 opens in 8 weeks
matched to this season's forecast
about 23.2 t/ha expected
· about 35.0 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
BeetrootFavourablePlant 15 Jan 2027 – 14 Feb 2027 opens in 15 weeks
matched to this season's forecast
about 27.8 t/ha expected
Irrigated: plant 2 Mar 2027 – 30 Jun 2027 · about 37.1 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
RoselleFavourablePlant 17 Oct 2026 – 16 Nov 2026 opens in 2 weeks
matched to this season's forecast
about 1.1 t/ha expected
Irrigated: plant 20 Jul 2026 – 7 Dec 2026
Pest/disease risk — manageableLate-maturing — drought risk -
Pigeon peaFavourablePlant 17 Oct 2026 – 6 Nov 2026 opens in 2 weeks
matched to this season's forecast
about 1.8 t/ha expected
Irrigated: plant 9 Aug 2026 – 8 Oct 2026
Pest/disease risk — manageableLate-maturing — drought risk -
EggplantFavourablePlant 27 Oct 2026 – 6 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 32.3 t/ha expected
Irrigated: plant 10 Jun 2026 – 10 Feb 2027 · about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Sweet pepperFavourablePlant 27 Oct 2026 – 16 Dec 2026 opens in 4 weeks
matched to this season's forecast
about 23.1 t/ha expected
Irrigated: plant 27 Dec 2026 – 1 May 2027 · about 37.1 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
ChilliFavourablePlant 27 Oct 2026 – 26 Nov 2026 opens in 4 weeks
matched to this season's forecast
about 13.6 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 23.2 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
Swiss chardFavourablePlant 6 Nov 2026 – 16 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 32.4 t/ha expected
· about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
KaleFavourablePlant 6 Nov 2026 – 16 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 32.3 t/ha expected
Irrigated: plant 28 Oct 2026 – 9 Aug 2027 · about 46.3 t/ha
Pest/disease risk — manageableLate-maturing — drought risk -
SesameFavourablePlant 17 Oct 2026 – 6 Nov 2026 opens in 2 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 9 Aug 2026 – 28 Oct 2026
Pest/disease risk — manageableEarly-maturing — escapes late drought -
Egusi melonFavourablePlant 17 Oct 2026 – 16 Dec 2026 opens in 2 weeks
matched to this season's forecast
about 0.9 t/ha expected
Irrigated: plant 29 Aug 2026 – 1 Jan 2027
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GroundnutFavourablePlant 17 Oct 2026 – 6 Nov 2026 opens in 2 weeks
matched to this season's forecast
about 2.2 t/ha expected
Irrigated: plant 9 Aug 2026 – 28 Oct 2026 · about 3.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
GuavaFavourablePlant 17 Oct 2026 – 25 Jan 2027 opens in 2 weeks
matched to this season's forecast
about 17.9 t/ha expected
Irrigated: plant 21 Jan 2026 – 1 Jan 2027 · about 35.0 t/ha
Pest/disease risk — manageable -
RiceFavourablePlant 6 Nov 2026 – 6 Dec 2026 opens in 5 weeks
matched to this season's forecast
about 3.5 t/ha expected
Irrigated: plant 20 Jul 2026 – 1 Jan 2027 · about 6.5 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
LettuceFavourablePlant 16 Dec 2026 – 24 Feb 2027 opens in 11 weeks
matched to this season's forecast
about 19.2 t/ha expected
Irrigated: plant 22 Mar 2027 – 20 Jul 2027 · about 32.4 t/ha
Pest/disease risk — manageableEarly-maturing — escapes late drought -
WheatFavourablePlant 16 Dec 2026 – 15 Jan 2027 opens in 11 weeks
matched to this season's forecast
about 3.5 t/ha expected
Irrigated: plant 2 Mar 2027 – 30 Jun 2027 · about 6.5 t/ha
Pest/disease risk — manageable -
TeffModeratePlant 24 Feb 2027 – 5 Mar 2027 opens in 21 weeks
matched to this season's forecast
about 1.2 t/ha expected
Irrigated: plant 22 Mar 2027 – 20 Jul 2027 · about 3.5 t/ha
Pest/disease risk — manageableSoil pH below the crop's optimumEarly-maturing — escapes late drought
Rain-fed. These dates are worked out from each place's own rainfall, for a field watered by the season — with irrigation a window can open earlier, close later, or come round more than once a year. Check your own field under What grows, or get the Divisi app for a calendar dated to your farm.
What grows in Chilanga with irrigation
These need water applied — rain alone will not carry them here. The dates are the windows their own water supply allows.
-
AvocadoFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 20.0 t/ha expected
Pest/disease risk — manageable -
GrapefruitFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 37.1 t/ha expected
Pest/disease risk — manageable -
LemonFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 37.1 t/ha expected
Pest/disease risk — manageable -
Sweet orangeFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 37.1 t/ha expected
Pest/disease risk — manageable -
LimeFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 23.2 t/ha expected
Pest/disease risk — manageable -
BananaFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 54.9 t/ha expected
Pest/disease risk — manageable -
Arabica coffeeFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 2.2 t/ha expected
Soil pH below the crop's optimum -
TeaFavourable Needs irrigationPlant 22 Mar 2026 – 2 Mar 2027 open now
matched to this season's forecast
about 3.9 t/ha expected
Soil pH outside the crop's rangeCorrect soil pH (acidifier)Correctable with liming -
MandarinFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 30.1 t/ha expected
Pest/disease risk — manageable -
ChickpeaFavourable Needs irrigationPlant 10 Jun 2027 – 30 Jun 2027 opens in 36 weeks
matched to this season's forecast
about 3.0 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought -
TurmericFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 27.8 t/ha expected
Late-maturing — drought risk -
YamFavourable Needs irrigationPlant 10 Jun 2026 – 8 Oct 2026 open now
matched to this season's forecast
about 23.2 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
GingerFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 24.2 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
PineappleFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 53.1 t/ha expected
Pest/disease risk — manageableSoil pH outside the crop's rangeCorrect soil pH (acidifier) -
SugarcaneFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 84.3 t/ha expected
Pest/disease risk — manageable -
GarlicFavourable Needs irrigationPlant 2 Mar 2027 – 21 May 2027 opens in 22 weeks
matched to this season's forecast
about 16.7 t/ha expected
Soil pH below the crop's optimumLate-maturing — drought risk -
CassavaFavourable Needs irrigationPlant 21 Jan 2026 – 1 Jan 2027 open now
matched to this season's forecast
about 27.2 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
TaroFavourable Needs irrigationPlant 10 Jun 2026 – 21 May 2027 open now
matched to this season's forecast
about 22.1 t/ha expected
Pest/disease risk — manageableLate-maturing — drought risk -
CabbageFavourable Needs irrigationPlant 22 Mar 2027 – 30 Jun 2027 opens in 25 weeks
matched to this season's forecast
about 48.6 t/ha expected
Pest/disease risk — manageableEarly-maturing — escapes late drought
What Divisi would not plant in Chilanga
Every crop in the catalogue is scored against this district, not only the ones that work — so the list above is a decision rather than a shortlist. These are the rest, with what ruled each one out.
- Lemon Only in patches — clears in part of this area, not across any one zone
- Lime Only in patches — clears in part of this area, not across any one zone
- Sweet orange Only in patches — clears in part of this area, not across any one zone
- Mandarin Only in patches — clears in part of this area, not across any one zone
- Grapefruit Moderate — Water
- Pineapple Moderate — Water
- Avocado Moderate — Water
- Cassava Moderate — Water
- Yam Only in patches — clears in part of this area, not across any one zone
- Sugarcane Moderate — Water
- Turmeric Moderate — Water
- Banana Unsuitable — Water
- Cabbage Unsuitable — Temperature
- Chickpea Unsuitable — Temperature
- Cocoa Unsuitable
- Coconut Unsuitable
- Taro Unsuitable — Water
- Arabica coffee Unsuitable — Water
- Robusta coffee Unsuitable
- Enset Unsuitable
- Garlic Unsuitable — Temperature
- Ginger Unsuitable — Water
- Oil palm Unsuitable
- Tea Unsuitable — Water
Divisi scored 74 crops against this district's own ground; 24 came back without a sowing date.
Plan the season, not just check it
The crops and dates above are read at cells spread across Chilanga, and the map colours which kind of ground each part of it is. Your own soil, slope and rainfall will shift the dates — the Divisi app works them out for your field, and dates each job that follows.
Or check your field firstWhat changed in Chilanga
- 31 August 2026 Banana Plantain — Crop became recommendable
- 31 August 2026 Pumpkin Butternut — Crop became recommendable
- 31 August 2026 Cabbage — Crop became recommendable
- 31 August 2026 Fonio — Crop became recommendable
- 31 August 2026 Cucumber — Crop became recommendable
This calendar moves
Planting windows shift with the forecast. Leave your email and we'll send what changed, and a note when planting time nears — a couple of emails a month at most.
Where to sell it nearby
-
New Soweto Market
33 km · Maize, Tomato, Cabbage, Onion
-
Lusaka City Market
35 km · Tomato, Cabbage, Maize, Groundnut
Support and extension
- Farmer Input Support Programme
- Sustainable Agriculture Financing Facility
- Department of Agriculture
- Seed Control and Certification Institute
- Zambia Agriculture Research Institute
Frequently asked questions
What crops grow well in Chilanga?
Finger millet, Lablab, Maize, Mango, Pearl millet all rate well in Chilanga — scored against its own rainfall, soil and terrain rather than a national average.
When should I plant Finger millet in Chilanga?
In Chilanga the window for Finger millet runs 17 Oct 2026 to 26 Nov 2026.
Is there a farming app that works in Chilanga?
Divisi does. It reads Chilanga's own rainfall, soil and terrain rather than a national average, so the planting dates and crop shortlist on this page are the same ones the app works out for a field here — then dates each job for that field, and keeps working with no signal.
Is this exact for my own field?
No — these are readings taken across Chilanga, not on your field. Soil, slope and rainfall change from one farm to the next. Check your own location to see your own numbers.